Filed 5/24/17; pub order 6/20/17 (see end of opn.)
IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
SIXTH APPELLATE DISTRICT
SJJC AVIATION SERVICES, LLC, H041035
(Santa Clara County
Plaintiff and Appellant, Super. Ct. No. 1-13-CV-246405)
v.
CITY OF SAN JOSE, et al.,
Defendants and Respondents;
SIGNATURE FLIGHT SUPPORT
CORPORATION, et al.,
Real Parties in Interest and
Respondents.
In this action SJJC Aviation Services, LLC (SJJC) filed a petition for writ of
mandate and a complaint seeking to overturn the decision by the City of San Jose
(the City) to award a lease and operating agreement to real parties in interest Signature
Flight Support Corporation (Signature) and its prospective subtenant, BCH San Jose LLC
(BCH). The superior court sustained the demurrers of the City and real parties to SJJC’s
first amended petition and complaint without leave to amend. SJJC appeals from the
ensuing judgment of dismissal, contending that the “flawed” process of soliciting bids for
the lease should be set aside and asserting abuse of discretion by the court in denying
leave to amend. We will affirm the judgment.
Background
Because this appeal arises from the sustaining of demurrers, in summarizing the
history of the dispute we draw primarily from the facts asserted in the operative pleading,
SJJC’s first amended petition and complaint. Toward this end “we accept as true the
properly pleaded material factual allegations of the complaint, together with facts that
may properly be judicially noticed.” (Crowley v. Katleman (1994) 8 Cal.4th 666, 672;
Moore v. Regents of University of California (1990) 51 Cal.3d 120, 125 (Moore).)
Appellant, a wholly owned subsidiary of Atlantic Aviation FBO, Inc. (Atlantic),1
is a fixed base operator (FBO) that currently operates a full-service facility at the
Norman Y. Mineta San Jose International Airport, which is owned by the City. In early
2012 the City addressed a plan to add a second FBO on the west side of the airport. The
new FBO would, according to the City’s expectations, “create a competitive environment
for facilities providing a range of services to the public, meeting the needs of Silicon
Valley companies for access to global markets, providing economic benefit to the region,
and revenue to the City and Airport.” Consistent with that plan, in August 2012 the City
issued a request for proposals (RFP) “for the development and operation of aeronautical
services facilities to serve general aviation activities at the [airport].”2 In addition to a
specific description of the operations and services to be undertaken, the detailed
requirements for the proposal included an explanation of the proposer’s experience,
financial qualifications, management and business plan, and marketing approach, as well
as a “proposed rent schedule” and lease term.
1
The parties below frequently referred to the petitioner as Atlantic rather than
SJJC. We will adhere to “SJJC” except where “Atlantic” is used in the appellate briefs or
the superior court record.
2
For purposes of the RFP, “general aviation” was defined as “any aeronautical
activity other than scheduled commercial passenger, cargo or military aeronautical
activities.”
2
In the RFP the City explained that an evaluation panel would first determine,
according to pass/fail criteria,3 which proposals were responsive and then rank those
responsive proposals using scoring criteria. The scoring criteria most important to the
City were revenue to the airport and revenue to the City.4 The selected respondent or
respondents would be recommended to the City Council for the award of a ground lease
and operating agreement. The RFP emphasized that revenue generation would be the
“primary consideration” in selecting the proposals to be submitted for approval; the
highest revenue-generating proposal would be placed at the site, with the second highest
proposal to merit placement on the remaining available land. The RFP also emphasized
that proposals that did not conform to the standards and procedures described might be
considered “non-responsive and subject to rejection.” Attached to the RFP was an
“Exemplar Agreement” which was anticipated to govern the parties’ relationship “in
substantially the form attached to this RFP,” but with revisions incorporating pertinent
details of the successful bidder’s proposal. The City reserved the right “to waive any
informality or irregularity in any proposal.” It also reserved “the right to reject any and
all proposals or portions thereof received in response to this RFP and thereafter reissue
the RFP.”
3
The initial evaluation was for completeness of the proposal according to RFP
requirements; conformance to the City’s “Airport Minimum Standards”; conformance to
specific requirements in the RFP, “including references, minimum ground rent and
minimum capital development investment”; and documentation of the proposer’s
“[m]inimum [e]xperience.”
4
In the scoring phase, qualifying proposals were ranked separately depending on
whether the proposer was a commercial or non-commercial operator. The criteria were
the same, however; only the percentage allocated to each category differed between the
two classes of proposers. In addition to revenue generation, the scoring criteria for each
proposal included “[q]uality of [the] [p]roposed [f]acilities and [c]apital [i]nvestment”
and benefits to the local community. An additional criterion applicable only to a
commercial proposal was the operator’s business and management plan.
3
The City received responses from three companies: Signature, Ross Aviation
(Ross), and SJJC. Signature’s proposal offered a 50-year lease term with a capital
investment of $82 million. It anticipated construction of a facility covering 29 acres5
encompassing a terminal, seven hangars, and a shop area. SJJC, on the other hand,
proposed a “phased approach”: Rather than immediate construction of facilities, it
contemplated planning for development; it would pay “up to $290 million” in exchange
for five-year options to develop the entire west side of the airport. Some of the specific
requested elements of the RFP were deemed inapplicable—for example, no management
plan was included because SJJC’s proposal was “not defined as FBO or SASO.”6
Likewise, SJJC did not include a business plan because “[t]he proposal is not specifically
defined as of this time.”
Both Ross’s and SJJC’s proposals were rejected as nonresponsive. Ross’s
proposal had failed to include FBO storage information, a “pass/fail” selection criterion.
SJJC had omitted nine required elements, including a rent proposal, its minimum capital
investment, and minimum guaranteed property, sales, and use taxes. The staff summary
of the three proposals indicated that SJJC had described no facility, whereas Ross and
Signature had outlined provisions for a terminal, hangar, shop area, and ramp, among
other terms relating to the lease area and specific sources of projected revenue generation
for the City.
Both Ross and SJJC submitted letters of protest. In SJJC’s letter it acknowledged
that its proposal had not addressed all the specific items the City had identified as
disqualifying it for consideration. Because it was “not proposing any facilities,” several
of the requested items were considered “not applicable to Atlantic’s proposal.” In SJJC’s
5
The City had designated 32 acres available for the FBO facilities.
6
An SASO, or “Specialized Aviation Services Operator,” within the meaning of
the RFP, was a commercial facility that was not an FBO.
4
view, however, its “strictly financial proposal”—“[i]n essence a simple real estate
development agreement”—offered a higher value to the City, consistent with the
City Council’s intent “to make revenue generation the primary consideration in a
successful proposal.” SJJC believed that its “Plan First” approach was superior to the
“RFP First” approach contemplated by the City, because it would allow the airport to
“pursue a comprehensive planning process” in partnership with SJJC, thus accruing
revenue while maintaining “total flexibility” to develop the land once the City determined
the “highest-and-best use” for the property.
Unsuccessful in its protest, SJJC then submitted an appeal challenging both its
disqualification and the City’s “Notice of Intended Award” to Signature. The City
Attorney advised the City Council that the defects in SJJC’s proposal were material and
thus not waivable as minor irregularities; to accept its proposal with such material
omissions “would result in Atlantic[’s] gaining a competitive advantage over the
proposer that complied with all of the RFP submittal requirements.” SJJC complained
that the City had not followed its own procedures, having rejected SJJC’s proposal while
ignoring “serious material flaws in Signature’s [p]roposal.” In SJJC’s view, the City had
treated Signature preferentially instead of adhering to the same standards. Thus, if the
City upheld the rejection of SJJC’s proposal, it should reject Signature’s as well.
In anticipation of the City Council’s meeting on the FBO project, William F.
Sherry, the Director of Aviation for the City, updated the council on the negotiations with
Signature, which he had already recommended for the award. Sherry reminded the
council that it had directed the RFP to specify that the successful applicant would be
subject to the existing “Airport Curfew Ordinance” that applied to existing FBOs and
their subtenants.7 Those existing leases contained curfew provisions that went beyond
7
Chapter 25.03 of the San Jose Municipal Code (S.J.M.C.) sets restrictions on
aircraft operations between the curfew hours of 11:30 p.m. and 6:30 a.m. (See, e.g.,
5
the curfew ordinance, but they were applicable only if they were contained in all FBO
leases. However, Signature—and in particular, its subtenant, BCH—had objected to the
additional provisions. BCH was concerned about the term that allowed the City to evict a
tenant if it violated the curfew even once, even though that had never occurred since the
addition of the provisions in 2004. Nevertheless, Signature was willing to agree to the
provisions in the lease presented to it, which contained a term requiring compliance with
all applicable federal, state, and local laws. Sherry believed that this provision was
sufficient to bind Signature to the curfew ordinance, and he recommended not including
the additional curfew term in the proposed Signature lease. The existing curfew terms
with the other tenants, including SJJC, would then no longer be enforceable; all would be
subjected only to the curfew ordinance.
At the City Council hearing on April 9, 2013, SJJC’s attorney voiced its objections
to the recommendation of Signature for the award, identifying defects in Signature’s
proposal that should invalidate acceptance of its bid. SJJC also had objections to the City
Council’s approval of staff recommendations until completion of the environmental
review process under the California Environmental Quality Act (CEQA).
After hearing from representatives of the affected entities and the public, the City
Council “denied” SJJC’s appeal. It then heard input from affected parties regarding the
curfew provisions and other issues. Following the April 9 hearing, the City Council
adopted a resolution authorizing the City Manager to negotiate a ground lease and
operating agreement with Signature for the construction and operation of its FBO facility.
One week later a supplemental resolution authorized the City Manager to execute those
agreements, as amended to use the general language currently used in airline leases—that
is, a requirement to comply with all laws.
S.J.M.C. §§ 25.03.225, 25.03.300-25.03.330.) It also sets forth the procedures for
determining and punishing violations. (See S.J.M.C. §§ 25.03.400-25.03.490.)
6
SJJC filed two petitions for a writ of mandate in May 2013 against the City and
the City Council, naming Signature and BCH. The first, filed on May 9, challenged the
award to Signature as a violation of CEQA.8 The second, the subject of this appeal, was
filed May 16, seeking an order to rescind the award and reissue the RFP. Each petition
was combined with a complaint for injunctive and declaratory relief.
In July 2013 Signature, joined by BCH, demurred to the petition and moved to
strike portions of it, as did the City. The superior court denied the motions to strike
without prejudice, but it sustained the demurrers in part with leave to amend, finding an
insufficient basis for the vague allegations that state and local law and “ministerial and/or
mandatory duties must have been breached.”
SJJC filed its first amended petition and complaint on October 23, 2013. As it had
in the previous pleading, it complained that the City had “prejudicially abused its
discretion and acted arbitrarily and capriciously by awarding the [FBO] Project to
Signature.” According to SJJC, the City had favored Signature, overlooking the
deficiencies in Signature’s proposal and materially deviating from the requirements of the
RFP, thus giving Signature a competitive advantage over the other proposers. The City
thus violated its “clear mandatory, ministerial, non-discretionary duty” to conduct a fair
RFP process by failing to disqualify the Signature proposal and by changing the terms of
the RFP, including the curfew requirements. SJJC invoked the S.J.M.C. as the basis for
its allegation of an unfair, biased procedure, referring to chapters 4.12 and 4.07, and
specifically citing sections 4.12.210, 4.12.215, 14.07.100, 14.07.300, 14.07.600,
14.07.660, and 14.07.560(B). It also alleged violations of sections 1217 and 1302 of the
City’s charter (pertaining to bid requirements for public works projects and grants of
franchises respectively). In addition to its request for a writ of mandate, SJJC sought a
8
That petition is the subject of a companion case on appeal in SJJC Aviation
Services, LLC v. City of San Jose et al. (H041946).
7
judicial declaration of the City’s violations and an injunction to stop the City and
Signature from proceeding with the project. Both SJJC and the public, SJJC alleged,
would be “irreparably harmed” if the court did not force the City to set aside its prior
approval and “rebid the Project” in compliance with state and municipal law, the City’s
charter, and the RFP itself.
Signature (jointly with BCH) and the City each demurred again, asserting that
SJJC had failed to cite any applicable statutory duty that the City had violated. The cited
provisions of the City’s charter and its municipal code were inapplicable, they argued,
because they concerned public works projects and public utility franchises, whereas the
RFP at issue was for a lease of public property for a private FBO facility involving no
expenditure by the City. They further argued that SJJC had no standing, other than
through its CEQA challenge, to oppose the FBO award to Signature because SJJC was
not a party “beneficially interested” within the meaning of Code of Civil Procedure
section 1086 (hereafter, section 1086); instead, it was only a competitor which had
submitted a nonresponsive bid. Real parties also renewed their motion to strike, in which
the City joined.
SJJC responded that it was not required to allege “a specific legal provision to
support a petition for a writ of mandate.” In addition to the code sections already cited,
the City violated the terms of the RFP itself by accepting a proposal with material
omissions, contrary to the City’s “inherent duty to treat all proposals the same.” SJJC
also responded to the assertion that it had no standing to petition for the writ: it did have
standing as “a party who participated in the skewed RFP process,” because it was
“specifically and adversely affected by the City’s modification of the curfew
requirements (and Exemplar Agreement) after all the proposals were submitted and after
the release of the Notice of Intended Award.” Such “arbitrary actions,” SJJC argued,
“provided Signature with a competitive advantage at the expense of Atlantic (and
others)” and thus “compel that [sic] the award be rescinded and rebid.” SJJC also
8
claimed “ ‘citizen standing’ ” to bring this action “in order to protect the public fisc,” an
undertaking for which it believed it was especially well suited as one of the three entities
that had bid on the project and as a current airport tenant.
On February 18, 2014, the court heard argument on the demurrers together with
the motion to strike and several requests for judicial notice. On March 4, 2014, it filed its
order sustaining the demurrers without leave to amend. After taking judicial notice of the
text of the code sections on which SJJC had relied, the court concluded that SJJC had
failed to cite applicable authority supporting its assertion that the City had violated a
mandatory duty. It had also failed to allege abuse of discretion. The court denied further
leave to amend, because SJJC had failed to show how any amendment would change the
legal effect of its pleading. On May 2, 2014, the court entered its judgment dismissing
the action with prejudice. SJJC then brought this timely appeal.
Discussion
SJJC contends that the court erred in sustaining the City’s and real parties’9
demurrers because it had pleaded legally sufficient causes of action showing abuse of
discretion in the City’s RFP process and award to Signature. Our review is governed by
settled standards, which apply equally whether a demurrer challenges a complaint or a
petition. (See Jones v. Omnitrans (2004) 125 Cal.App.4th 273, 277 [dismissal of petition
for writ of mandate after demurrer order reviewed under appellate rules for demurrer to a
complaint].) We review the petition and complaint de novo “to determine whether it
alleges facts stating a cause of action under any legal theory . . . . [¶] Because the
function of a demurrer is not to test the truth or accuracy of the facts alleged in the
complaint, we assume the truth of all properly pleaded factual allegations. [Citation.]
Whether the plaintiff will be able to prove these allegations is not relevant; our focus is
9
In this discussion real parties will occasionally be referred to collectively as
Signature.
9
on the legal sufficiency of the complaint.” (Los Altos Golf and Country Club v. County
of Santa Clara (2008) 165 Cal.App.4th 198, 203; see also Ferrick v. Santa Clara
University (2014) 231 Cal.App.4th 1337, 1341.) “Further, we give the complaint a
reasonable interpretation, reading it as a whole and its parts in their context.” (Blank v.
Kirwan (1985) 39 Cal. 3d 311, 318 (Blank); Schifando v. City of Los Angeles (2003) 31
Cal.4th 1074, 1081 (Schifando).)
We also consider matters that may be judicially noticed and facts appearing in any
exhibits attached to the petition and complaint. (Code Civ. Proc., § 430.30, subd. (a);
Schifando, supra, 31 Cal.4th at p. 1081; Blank, supra, 39 Cal.3d at p. 318.) We do not,
however, assume the truth of “mere contentions or assertions contradicted by judicially
noticeable facts.” (Evans v. City of Berkeley (2006) 38 Cal.4th 1, 20; see also Blatty v.
New York Times Co. (1986) 42 Cal.3d 1033, 1040 [“when the allegations of the
complaint contradict or are inconsistent with such facts, we accept the latter and reject the
former”].)
After reviewing the allegations of the petition, the accompanying exhibits, and the
matters properly subject to judicial notice,10 we determine whether the petition states a
cause of action as a matter of law. (Cf. Moore, supra, 51 Cal.3d at p. 125.) Finally, if the
lower court has sustained the demurrer without leave to amend, as here, “we decide
whether there is a reasonable possibility that the defect can be cured by amendment: if it
can be, the trial court has abused its discretion and we reverse.” (City of Dinuba v.
County of Tulare (2007) 41 Cal.4th 859, 865.) However, “[t]he burden of proving such
reasonable possibility is squarely on the plaintiff.” (Blank, supra, 39 Cal.3d at p. 318;
Schifando, supra, 31 Cal.4th at p. 1081; Berg & Berg Enterprises, LLC v. Boyle (2009)
178 Cal.App.4th 1020, 1035 (Berg & Berg).)
10
SJJC’s motion for judicial notice in this court is denied.
10
Here the superior court sustained the demurrers on the ground that SJJC had
“failed to identify any applicable mandatory or ministerial statutory duty that was
allegedly violated by the City.” It expressly declined to reach the issue of whether SJJC
had a beneficial interest entitling it to bring a petition for a writ of mandate. Recognizing
that we review the correctness of lower court’s ruling, not its reasoning (Berg & Berg
Enterprises, supra, 178 Cal.App.4th at pp. 1034-1035; Mendoza v. Town of Ross (2005)
128 Cal.App.4th 625, 631; see also Blumhorst v. Jewish Family Services of Los Angeles
(2005) 126 Cal.App.4th 993, 1000 (Blumhorst) [reviewing court may decide standing
issue even if not addressed by the trial court]), we find the demurrers meritorious on the
second ground raised by the City and real parties.
1. SJJC’s Beneficial Interest
In their demurrers the City and real parties asserted that SJJC was not
“beneficially interested” in the outcome of the RFP “because it chose to submit a
nonresponsive proposal that simply disagreed with the premise of the RFP.” In their
answering briefs on appeal, they maintain this position. Because SJJC was a
nonresponsive bidder on a “non-public contract,” it was not a “serious contender” for the
airport award; consequently, it lacked a “plausible claim” or other “direct stake” in the
award and thus can gain no benefit from the requested writ.
The beneficial interest asserted by the City and real parties is derived from
section 1086, which states that a writ of mandate “must be issued upon the verified
petition of the party beneficially interested.” (See Brown v. Crandall (2011) 198
Cal.App.4th 1, 8 (Brown) [section 1086 establishes a standing requirement for writs of
mandate]; Lindelli v. Town of San Anselmo (2003) 111 Cal.App.4th 1099, 1107 [same].)
“The requirement that a petitioner be ‘beneficially interested’ has been generally
interpreted to mean that one may obtain the writ only if the person has some special
interest to be served or some particular right to be preserved or protected over and above
the interest held in common with the public at large.” (Carsten v. Psychology Examining
11
Com. (1980) 27 Cal. 3d 793, 796.) “The beneficial interest must be direct and
substantial.” (Save the Plastic Bag Coalition v. City of Manhattan Beach (2011) 52
Cal.4th 155, 165 (Save the Plastic Bag).) This standard “is equivalent to the federal
‘injury in fact’ test, which requires a party to prove by a preponderance of the evidence
that it has suffered ‘an invasion of a legally protected interest that is “(a) concrete and
particularized, and (b) actual or imminent, not conjectural or hypothetical.” ’ ”
(Associated Builders & Contractors, Inc. v. San Francisco Airports Com. (1999) 21
Cal.4th 352, 362.) A petitioner has no beneficial interest within the meaning of the
statute if he or she “will gain no direct benefit from [the writ’s] issuance and suffer no
direct detriment if it is denied.” (Waste Management of Alameda County, Inc. v. County
of Alameda (2000) 79 Cal.App.4th 1223, 1232 (Waste Management), disapproved in part
on another point in Save the Plastic Bag, supra, at pp. 160, 166-171.)
SJJC maintains that it is “clearly ‘beneficially interested’ ” because it was “a party
actually involved in the RFP process and a current airport tenant,” whose interest is
“much different from that of any interest held in common with the public.” In SJJC’s
view, it makes no difference that its bid was nonresponsive; it was nonetheless affected
by the City’s change in the conditions of the RFP after bids were submitted. If it obtains
relief, the City will be required to issue a new RFP and it will be able to “participate in a
fair and impartial RFP process . . . where the RFP’s requirements are not a moving target
and are equally applicable to all bidders.”
We are unconvinced. In claiming a beneficial interest as one of the entities that
submitted bids to the City, SJJC fails to show how the alleged defect in the City’s RFP
process undermined the effort by SJJC to submit a responsive proposal, or how it made
any difference in the process of determining which bids were responsive. The reason
SJJC’s bid was rejected had nothing to do with existing curfew conditions; it was rejected
12
because it did not include nine of the required items listed in the RFP.11 Any additional
criterion in which the proposer would have had to agree to a more restrictive curfew
would not have enhanced the chances of SJJC’s success in either the bidding process or
its challenge to the City’s decision, because its own bid inadequately addressed the
objectives of the RFP.
The superior court articulated a significant point at the demurrer hearing. The
change of which SJJC complains occurred after the City determined which of the three
submissions met all of the criteria listed in the RFP—and more importantly, that change
did not relax any requirements that existed at the time the RFP was issued, such as the
obligation to follow existing law. The Exemplar Agreement itself did not contain the
proposed curfew term to which Signature and BCH objected—i.e., the potential eviction
of noncompliant aircraft and termination of the lease. Although the City attempted to
make the curfew policy more restrictive (consistent with existing FBO leases at the
airport) before completing the award to Signature, Signature refused to agree to the
additional term, and the parties were, as the court put it, brought “back to square one,”
with no additional curfew restriction beyond what had been presented in the RFP. Thus,
the eventual award did not grant Signature any benefits beyond what any responsive
bidder would have enjoyed. And even if SJJC were able to show that a benefit did accrue
to Signature through the retraction of the proposed additional curfew restriction, that
11
Those omitted proposal items included letters of reference from two financial
institutions; three years of audited financial statements; a financial “pro forma” with
projected revenue and expenses; a management plan; a rent proposal; minimum
guaranteed property, sales, and use taxes; and a minimum capital investment of
$1 million per acre. In responding to SJJC’s letter of protest, the purchasing officer
reminded the company that the City’s “clearly stated” objective was to obtain proposals
from qualified firms that would “ ‘design, develop, finance, construct, and operate
aeronautical services facilities.’ ” SJJC readily acknowledged that its intent was not to
construct any new facility in its immediate plan.
13
benefit could not have had any effect on SJJC, which remained a nonresponsive bidder
for reasons independent of the curfew issue.12
SJJC argues that even if its bid was nonresponsive, it still has a beneficial interest
because it would have an opportunity to submit a new bid responsive to a new RFP
issued “on fair and lawful terms.” In effect, SJJC envisions a judicially mandated
opportunity for a losing bidder to submit a successful proposal even when the losing bid
was incontrovertibly nonresponsive. The court was under no duty to provide such a
second bite at the apple in those circumstances. Thus, even assuming that the City
impermissibly relaxed its curfew restrictions to benefit Signature, we fail to see how a
new RFP would make any difference to SJJC’s chances of success, since its proposal was
disqualified at the preliminary phase for failing to conform to the City’s criteria in
multiple respects unrelated to curfew conditions. We must conclude, therefore, that SJJC
did not suffer prejudice from either the failure to include the proposed curfew restriction
in the original RFP or the alleged change in the curfew conditions culminating in the
City’s award of the lease to Signature.
SJJC relies on Baldwin-Lima-Hamilton Corp. v. Superior Court (1962) 208
Cal.App.2d 803 (Baldwin) to illustrate its point about receiving a second chance. Its
reliance is misplaced. In that case Baldwin, in the second of its two bids, was awarded a
contract to furnish equipment to the City and County of San Francisco, but that second
bid was nonresponsive because Baldwin had not complied with a term requiring
manufacture of the equipment in the United States. Although that term was deemed
invalid, its first bid, while responsive to the bid call, was higher than that of its
competitor, petitioner Allis. The superior court properly issued a writ of mandate based
on abuse of discretion by the city’s purchasing agent in awarding the contract to Baldwin.
12
Whether SJJC as an existing tenant at the airport would necessarily be affected
by the relaxation of the curfew requirement as applied to Signature is not before us.
14
The purchasing agent’s decision to bypass the “place of manufacture” provision and
award the contract to Baldwin “had a direct and injurious result on Allis.” (Id. at p. 824.)
Allis “was peculiarly affected by such abuse of discretion” because it was the only other
bidder, and its responsive bid was lower than Baldwin’s original responsive bid. Upon a
new invitation affording “full and fair competitive bidding,” Allis would have another
opportunity to bid. The appellate court thus concluded that Allis was “a ‘party
beneficially interested’ and as such entitled to invoke the remedy of mandamus.” (Id. at
pp. 824-825; see also Schram Construction, Inc. v. Regents of University of California
(2010) 187 Cal.App.4th 1040, 1057 [university’s failure to disclose material information
about selection procedures and criteria placed contractor at a disadvantage in bidding and
negatively impacted competition].)
Baldwin does not help SJJC. Unlike Allis, SJJC cannot be considered to be the
lowest responsive bidder; its bid was not responsive at all. SJJC insists that this fact is
irrelevant, as numerous appellate decisions have allowed nonresponsive bidders to
challenge awards of public contracts. It contends that it was “adversely affected by the
City’s arbitrary failure to timely disclose—until after the bids had been submitted—that it
would change the conditions of the RFP.” (Emphasis omitted.) But beyond this
conclusory assertion SJJC does not explain how it was harmed by the process leading to
the City’s decision. It has not occupied a position like that of the successful petitioner in
Baldwin, where Allis was entitled to a second bidding opportunity because it had already
been the lowest responsive bidder. SJJC has not shown that it would have submitted the
lowest (or indeed, any) responsive bid had the City either included an additional term or
omitted any term appearing in the RFP received by SJJC and others.
In a related contention SJJC maintains that it makes no difference that its bid was
nonresponsive in determining its standing to challenge a bid award. None of the cases it
cites for this proposition advances SJJC’s position. M & B Construction v. Yuba County
Water Agency (1999) 68 Cal.App.4th 1353 is inapposite because the petition granted by
15
the trial court (and reversed on appeal) involved a contractor who (unlike SJJC)
challenged the grounds for the agency’s rejection of its bid. In Monterey Mechanical Co.
v. Sacramento Regional County Sanitation Dist. (1996) 44 Cal.App.4th 1391, the
contractor was entitled to a writ of mandate because the sanitation district had used
improper criteria in disqualifying the contractor, who had submitted the lowest bid.
Likewise, in Taylor Bus Service Inc. v. San Diego Bd. of Education (1987) 195
Cal.App.3d 1331 and Domar Electric Inc. v. City of Los Angeles (1995) 41 Cal.App.4th
810 the low bidder’s petition challenged the rejection of its bid as nonresponsive. D.H.
Williams Construction Inc. v. Clovis Unified School Dist. (2007) 146 Cal.App.4th 757
(followed in Great West Contractors, Inc. v. Irvine Unified School Dist. (2010) 187
Cal.App.4th 1425) also involved the rejection of a purportedly nonresponsive bid, but in
legal effect it was found to be not a responsible bid, thereby requiring due process before
the school district could properly exercise its discretion in considering the bid.13
Similarly unavailing is SJJC’s reliance on DeSilva Gates Construction LP v. Department
of Transportation (2015) 242 Cal.App.4th 1409. There the successful bidder on a public
works contract complained on appeal that DeSilva lacked standing “because, as a
nonresponsive bidder, it had no interest in the contract.” (Id. at p. 1421) The argument
was rejected; DeSilva had standing as a beneficially interested party because its bid was
lower than that of the successful bidder.
Unquestionably SJJC, whose nonconforming bid was properly disqualified at the
initial “pass/fail” phase of review, cannot claim a right comparable to those of the
contractors cited above. SJJC is not disputing the determination that its proposal was
nonresponsive; instead, it has seized on an extraneous event, the withdrawal of a
13
Pacific Bell v. California State & Consumer Services Agency (1990) 225
Cal.App.3d 107 also has no application to this case. There the petitioner did not bid on
the project, but instead challenged the terms of the RFP itself as a violation of the Public
Contract Code.
16
proposed change in the terms of the lease to Signature, that cannot have altered the fact
that SJJC’s bid failed in nearly every respect to meet the conditions set forth in the RFP.
2. Public Interest/Citizen Standing
Finally, SJJC argues in the alternative that even if it has no special interest or right
of its own to protect, it nonetheless has “ ‘citizen standing’ or ‘public interest standing’ ”
to bring its petition to challenge the award to Signature. This aspect of standing enables a
petitioner to seek mandamus “ ‘ “to procure the enforcement of a public duty.” ’ ” (Save
the Plastic Bag, supra, 52 Cal.4th at p. 166; see also Brown, supra, 198 Cal.App.4th at p.
14 [duty to provide medical care to indigent residents recognized as public duty subject to
enforcement by private citizen].) But the public interest exception is not a gateway to
standing for any individual or entity. In Save the Plastic Bag, the Supreme Court
cautioned that while corporations may have standing to bring a legal challenge under the
public interest exception, that does not mean that the exception is “freely available to
business interests lacking a beneficial interest in the litigation. No party, individual or
corporate, may proceed with a mandamus petition as a matter of right under the public
interest exception. As the Waste Management court correctly observed, ‘Judicial
recognition of citizen standing is an exception to, rather than repudiation of, the usual
requirement of a beneficial interest. The policy underlying the exception may be
outweighed by competing considerations of a more urgent nature.’ ” (Save the Plastic
Bag, supra, at p. 170, fn. 5; see also Department of Consumer Affairs v. Superior Court
(2016) 245 Cal.App.4th 256, 262 [rejecting application of public interest standing where
car buyers lacked “any beneficial interest in an actual controversy”].) More specifically,
where the claim of “citizen” or “public interest” standing is driven by personal objectives
rather than “broader public concerns,” a court may find the litigant to lack such standing.
(Save the Plastic Bag, supra, at p. 169.) For example, as the Supreme Court in Save the
Plastic Bag pointed out, it would be improper for a petitioner—whether corporation or
individual—to “attempt to use CEQA to impose regulatory burdens on a business
17
competitor, with no demonstrable concern for protecting the environment.” (Ibid.; see
Carsten v. Psychology Examining Com., supra, 27 Cal.3d at p. 799 [petitioner’s
knowledge of events underlying her lawsuit showed that her interests were those of a
board member, not a neutral citizen].)
Citing Save the Plastic Bag, supra, 52 Cal.4th 155 and Rialto Citizens for
Responsible Growth v. City of Rialto (2012) 208 Cal.App.4th 899 (Rialto), SJJC renews
the argument it made to the court below, that it is “particularly [well suited] to bring this
action as (i) one of three entities that submitted a response to the RFP, and (ii) a current
airport tenant. No other potential plaintiff has Atlantic’s ‘particular expertise’ and
‘enhanced understanding of the public interests at stake.’ ” This reasoning undermines
the theory it purports to promote. In effect SJJC contends that as a potential competitor
at the airport it should know what the public should want. It does not demonstrate how
the City Council erred in determining that Signature’s FBO would be in the public
interest. Its very argument confirms that its position is driven by personal objectives
rather than “broader public concerns.” (Save the Plastic Bag, supra, at p. 169.)
Rialto does not suggest otherwise. There the citizen group was not a competitor
but “a nonprofit public benefit corporation, and as such ha[d] no commercial or
competitive interests to undermine or override its public interest standing.” (Rialto,
supra, 208 Cal.App.4th at p. 915.) In those circumstances it was “appropriate to apply
the public interest exception.” (Ibid.) Also distinguishable is Marshall v. Pasadena
Unified School Dist. (2004) 119 Cal.App.4th 1241 (Marshall), where recognition of
“citizen standing” was deemed appropriate because the aim of the petitioners was not to
secure an opportunity to bid but to “protect the public fisc by requiring the District ‘to
publicly advertise for bids to complete the work . . . and to award a contract for said work
to the lowest responsible bidder.’ ” (Id. at p. 1252.) Here, by contrast, SJJC is a
competitive bidder, with substantial economic interests that go beyond concern for the
18
public fisc; indeed, it forthrightly acknowledges that it is seeking another opportunity to
bid.
Moreover, the “citizen” exception to the “beneficial interest” requirement may be
applied “when the public duty is sharp and the public need weighty. (Waste
Management, supra, 79 Cal.App.4th at pp. 1236-1237.) Determining whether the
exception is warranted involves a “judicial balancing of interests” (Id. at p. 1237), to
promote “the policy of guaranteeing citizens the opportunity to ensure that no
governmental body impairs or defeats the purpose of legislation establishing a public
right.” (Green v. Obledo (1981) 29 Cal.3d 126, 144; Save the Plastic Bag, supra, 52
Cal.4th at p. 166.)
Rather than specifying the public duty and public need at issue here, SJJC only
cites “the concern of procurement laws (e.g., protection from favoritism, and protection
of the public fisc, fair play, due process, etc.)” and professes its interest as a citizen “in
ensuring that the City follows the law.” SJJC identifies no violation of specific statutes
that indicate an abandonment of the City’s public duty to conduct a fair procurement
process. Nor does SJJC reinvigorate its claim that the City violated its own municipal
laws and charter, a contention the superior court rejected as based on inapplicable
provisions.14 Even if it is sufficient to assert a general public duty “to conduct a fair RFP
process in conformity with the City’s duties under its own RFP rules and criteria,” the
properly pleaded facts alleged in SJJC’s petition, together with the exhibits and judicially
noticeable facts (Evans v. City of Berkeley (2006) 38 Cal.4th 1, 20; Keffeler v.
Partnership Healthplan of California (2014) 224 Cal.App.4th 322, 335, fn. 10), do not
14
SJJC’s petition cited the following S.J.M.C. sections: 4.12.210, 4.12.215,
14.07.100, 14.07.300, 14.07.460, 14.07.510, 14.07.600, and 14.07.660. It also adverted
to sections 1217 and 1302 of the City’s charter. The superior court determined, however,
that none of those provisions applied to the City’s conduct here, a ruling SJJC does not
directly contest on appeal.
19
delineate a violation of that duty. SJJC has also identified no “weighty” public need
comparable to the “basic human need” for indigent residents to obtain medical care
(Brown, supra, 198 Cal.App.4th at p. 14; see also Madera Community Hospital v. County
of Madera (1984) 155 Cal.App.3d 136, 145), the protection of public resources by
requiring advertisement for bids to perform a public contract (Marshall, supra, 119
Cal.App.4th at p. 1252), the public need for a report on the results of a reevaluation of the
state’s welfare standards (California Homeless & Housing Coalition v. Anderson (1995)
31 Cal.App.4th 450, 459), protection of the environment through CEQA (Save the Plastic
Bag, supra, 52 Cal.4th at p. 170), or protection of public school students from
discrimination, harassment, and bullying (Hector F. v. El Centro Elementary School Dist.
(2014) 227 Cal.App.4th 331, 334).
SJJC has thus failed to establish either a beneficial interest as a competitive bidder
or a weighty public need requiring a citizen’s intervention to enforce a public duty. The
inability to make that showing confirms that even if the City abused its discretion in
accepting Signature’s proposal, no prejudice to SJJC has resulted. SJJC submitted a
patently nonresponsive proposal, which was properly rejected for failing to conform to
even the most basic requirements of the RFP. No reissuance of the RFP setting forth the
S.J.M.C. curfew laws would improve SJJC’s prospects of that proposal’s being selected.
In short, neither SJJC nor the public would derive any benefit from reversal of the
superior court’s order. The court properly denied the petition.
3. Injunctive Relief
In its second cause of action SJJC sought an injunction to prevent the City and
Signature from pursuing the project “until such time as the City has rejected all responses
to its RFP and re-issue [sic] the RFP, pursuant to S.J.M.C. section 14.07.620(A), in
compliance with its mandatory legal duties under its own Charter, Municipal Code,
State law, and all other applicable rules, regulations, procedures and express terms of the
RFP.” SJJC alleged that without such an order it would suffer “great and irreparable
20
harm,” including deprivation of “an opportunity to participate in a fair, unbiased RFP
process” conducted in compliance with those “laws and regulations.”
In its demurrer the City (joined by Signature) asserted the same grounds as in its
challenge to SJJC’s request for mandamus relief—that is, (1) SJJC had failed to identify
any mandatory duty violated by the City; and (2) it lacked a beneficial interest sufficient
to confer standing to challenge the award to Signature. As noted earlier, the superior
court agreed with the City and Signature that SJJC had “conspicuously fail[ed] to identify
any “specific law, statute or regulation imposing a mandatory/ministerial duty” that the
City had violated. The court also rejected SJJC’s attempt to state a cause of action “by
simply alleging that the City of San Jose violated the terms of the RFP itself.” Finally,
the court stated that SJJC had “fail[ed] to properly allege any abuse of discretion” by the
City.
On appeal, SJJC maintains that it has standing to seek injunctive relief because it
is an unsuccessful bidder with no adequate remedy at law. The “irreparable harm” it
alleged “can only be avoided by enjoining the City from proceeding with the Project or
from allowing Signature to implement the Project, and enjoining the City to set aside the
tainted award to Signature.”
“The grant or denial of a permanent injunction rests within the trial court’s sound
discretion and will not be disturbed on appeal absent a showing of a clear abuse of
discretion.” (Horsford v. Board of Trustees of California State University (2005) 132
Cal.App.4th 359, 390.) Although the superior court did not directly address the request
for an injunction, it implicitly determined that SJJC was not entitled to this remedy
because it had failed to cite an applicable S.J.M.C. or charter provision supporting its
allegation that the City had “arbitrarily and capriciously conduct[ed] an irregular,
inconsistent and biased RFP process” in contravention of the S.J.M.C. and “well-settled
State law.” We find no error in this reasoning. In addition, as discussed earlier, even if
the City departed from its own RFP procedure by altering the curfew requirements, that
21
deviation had no effect on SJJC, whose bid was unquestionably nonresponsive for
multiple reasons that were independent of the curfew conditions. As SJJC will suffer no
actual injury caused by the conduct of which it complains, the court was not required to
enjoin the City and Signature from pursuing the FBO agreement they had reached.
(Cf. Blumhorst, supra, 126 Cal.App.4th at p. 1004 [plaintiff seeking injunction must
show a likelihood he will be harmed in the future]; Coral Construction, Inc. v. City and
County of San Francisco (2004) 116 Cal.App.4th 6, 24 [acknowledging that “standing
cannot be conferred if it hinges upon a single never-to-be-repeated event”].) Because the
material allegations of the petition and complaint do not state a legally sufficient claim,
an injunction was not warranted. The superior court did not abuse its discretion in
denying the requested relief.
4. Declaratory Relief
The third cause of action contained a request for a declaration “as to whether the
City violated applicable laws and/or the terms of the RFP as set forth above.” Code of
Civil Procedure section 1060 authorizes a declaratory judgment “in cases of actual
controversy relating to the legal rights and duties of the respective parties. . . .” “The
‘actual controversy’ referred to in this statute is one [that] admits of definitive and
conclusive relief by judgment within the field of judicial administration, as distinguished
from an advisory opinion upon a particular or hypothetical state of facts. The judgment
must decree, not suggest, what the parties may or may not do.” (Selby Realty Co. v. City
of San Buenaventura (1973) 10 Cal.3d 110, 117; Coronado Cays Homeowners Assn. v.
City of Coronado (2011) 193 Cal.App.4th 602, 608 (Coronado).) “Whether a claim
presents an ‘actual controversy’ within the meaning of Code of Civil Procedure
section 1060 is a question of law that we review de novo.” (Environmental Defense
Project of Sierra County v. County of Sierra (2008) 158 Cal.App.4th 877, 885.) “When
an actual controversy does exist, Code of Civil Procedure section 1061 gives the trial
court discretion to determine whether it is ‘necessary’ and ‘proper’ to exercise the power
22
to provide declaratory relief. (Code Civ. Proc., § 1061.)” (American Meat Institute v.
Leeman (2009) 180 Cal. App. 4th 728, 741; Coronado, supra, at p. 607.)
SJJC contends that its allegation of “actual and existing controversies” was “more
than sufficient to state a cause of action for declaratory relief.” In its view, a declaration
that the City’s conduct was unlawful would benefit SJJC as well as others, “by creating
an opportunity for [SJJC] to re-bid the Project in a fair and lawful RFP process . . . [T]his
is the specific result that the [first amended complaint] seeks.”
We disagree with SJJC’s assertion that an actual controversy exists between SJJC
and the City. SJJC lost its own opportunity to compete for the new airport FBO by
submitting a manifestly nonresponsive bid. The question of whether the City changed the
curfew restrictions for the project after Signature submitted the only responsive bid does
not affect SJJC, whose bid had already been properly rejected for reasons unrelated to
existing curfew provisions. There is thus no actual controversy “relating to the legal
rights and duties of the respective parties” within the meaning of Code of Civil
Procedure section 1060. (Italics added.)
Furthermore, SJJC is in reality complaining of past acts by the City and is seeking
a remedy that will allow it another opportunity to submit a responsive proposal. This is
not the intended purpose of Code of Civil Procedure section 1060. Declaratory relief
“ ‘operates prospectively, and not merely for the redress of past wrongs. It serves to set
controversies at rest before they lead to repudiation of obligations, invasion of rights or
commission of wrongs; in short, the remedy is to be used in the interests of preventive
justice, to declare rights rather than execute them.’ ” (Babb v. Superior Court (1971) 3
Cal.3d 841, 848.)
5. Denial of Leave to Amend
SJJC finally contends that the superior court abused its discretion by taking the
“ ’drastic step’ ” of denying it another opportunity to amend the petition and complaint.
While denying that the current pleading is insufficient, SJJC submits that it can cure the
23
defect “to more clearly allege and demonstrate that the City is subject [to] the
requirements of the Public Contract Code and its mandatory duties.” SJJC suggests that
“the provisions of the Public Contract Code may be applicable to the City, even though it
is a charter city,15 as provided by Public Contract Code [section] 1100.7,”16 and it asserts
that with leave to amend, it will “further allege more specific violations.”
It is not enough, however, for a plaintiff to assert generally that applicable
statutory provisions exist and that it will allege a violation of those provisions in its next
pleading. SJJC fails to explain not only how the Public Contract Code in general applies
to these facts, but also what specific section was violated, and how the City’s conduct
amounted to that violation. Furthermore, even if SJJC could identify the violation of a
specific statutory or municipal code requirement, it is unable to demonstrate how such a
violation affected the contents of SJJC’s proposal, disadvantaged SJJC in the bidding
process, or caused the City to reject its bid. Consequently, SJJC has not met its burden to
show a reasonable possibility that any further amendment would state a legally sufficient
cause of action. Further leave to amend the petition and complaint was not required here.
Disposition
The judgment of dismissal is affirmed.
15
As the superior court implicitly recognized, “as a ‘charter city,’ as that status is
recognized in the California Constitution (Cal. Const., art. XI, § 2, 3), the City is
empowered by the Constitution to govern its own ‘municipal affairs’ to the extent [that]
the field is not preempted by state law. In this regard, article XI, section 5, provides in
relevant part: ‘It shall be competent in any city charter to provide that the city governed
thereunder may make and enforce all ordinances and regulations in respect to municipal
affairs, subject only to the restrictions and limitations provided in their several charters
and in respect to other matters they shall be subject to general laws.’ (Cal. Const.,
art. XI, § 5, subd. (a).)” (MCM Construction, Inc. v. City and County of San Francisco
(1998) 66 Cal.App.4th 359, 372.)
16
Public Contract Code section 1100.7 states: “This code is the basis of contracts
between most public entities in this state and their contractors and subcontractors. With
regard to charter cities, this code applies in the absence of an express exemption or a city
charter provision or ordinance that conflicts with the relevant provision of this code.”
24
_________________________________
ELIA, J.
WE CONCUR:
_______________________________
RUSHING, P. J.
_______________________________
PREMO, J.
SJJC Aviation Services, LLC v. City of San Jose, et al.
H041035
Filed 6/20/17
CERTIFIED FOR PUBLICATION
IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
SIXTH APPELLATE DISTRICT
SJJC AVIATION SERVICES, LLC, H041035
(Santa Clara County
Plaintiff and Appellant, Super. Ct. No. 1-13-CV-246405)
v.
ORDER GRANTING REQUEST
CITY OF SAN JOSE, et al., FOR PUBLICATION
Defendants and Respondents;
SIGNATURE FLIGHT SUPPORT
CORPORATION, et al.,
Real Parties in Interest and
Respondents.
THE COURT:
Pursuant to California Rules of Court, rule 8.1105(b), the request for publication is
hereby granted. It is ordered that the opinion in this matter, filed on May 24, 2017, shall
be certified for publication.
_________________________________________
ELIA, Acting P.J.
__________________________________________
PREMO, J.
Trial Court: Santa Clara County Superior Court
Superior Court No.: 1-13-CV-246405
Trial Judge: Honorable Joseph H. Huber
Counsel for Plaintiff and Appellant: David P. Lanferman
SJJC AVIATION SERVICES, LLC Ash Pirayou
Peter J. Howell
Alan B. Fenstermacher
Rutan & Tucker
Counsel for Defendants and Respondents: Richard Doyle, City Attorney
CITY OF SAN JOSE, et al. Nora Frimann
Ardell Johnson
Margo Laskowska
Office of the City Attorney
Counsel for Real Parties in Interest and Charles Lagrange Coleman, III
Respondents: David I. Holtzman
SIGNATURE FLIGHT SUPPORT Amanda Jean Monchamp
CORPORATION, et al. Holland & Knight
SJJC Aviation Services, LLC v. City of San Jose, et al.
H041035