STATE OF MICHIGAN
COURT OF APPEALS
WILLIAM WOODS, UNPUBLISHED
JANET GRAY-WOODS, January 9, 2018
Plaintiffs-Appellees,
v No. 334733
Genesee Circuit Court
GENESEE COUNTY DRAIN COMMISSION, LC No. 14-103684-CE
Defendant-Appellant.
Before: METER, P.J., and SAWYER and SHAPIRO, JJ.
SHAPIRO, J. (dissenting).
I respectfully dissent because the trial court correctly determined that there is a question
of fact whether the drainage system operated and maintained by defendant was defective.
The drain system installed for this area included the creation of a detention pond, the
purpose of which is to gather rainwater and other surface water and release it at a slow rate over
time. In situations of heavy rain, the pond does not drain quickly enough and it overflows. The
alleged defect is that the system to handle that expected overflow is defective. The overflow is
supposed to be handled by a storm sewer located down flow from the pond. However, the storm
sewer was not large enough to properly handle an overflow, and so the overflow, instead, ran
overland and downhill. Plaintiffs’ property was in its path and was flooded, causing substantial
damage to plaintiffs’ home. Plaintiffs presented expert testimony reviewing the nature of this
defect and the manner in which the system should have been constructed, namely the inclusion
of a culvert to carry that excess water under the road and into the lake, rather than allowing it to
travel overland. As the trial court observed, “Plaintiffs’ . . . engineering expert says that the
detention pond lacked a defined overflow channel.” Thus, this is not simply a case, as defendant
suggests, of too much rain for the detention pond. Rather, the gravamen of the case is that the
defendant failed to have in place a system adequate to handle expected overflows from the pond
and as a result, plaintiffs and their insurer have been left to pay the price of defendant’s design
error. The defense argues in response that the design was reasonable and that it is unreasonable
to require that it be able to address a rainfall of this size. Plainly, there is a question of fact
whether the design was defective. That question should go to the trier of fact.
My colleagues also conclude that defendant did not have reason to know of the defect. I
disagree. The nature of the design and its capacity was fully known to defendant. The fact that
-1-
defendant assumed that this was adequate despite its limitations does not mean it did not have
reason to know of the defect. This is not a maintenance case, where defendant may not have
known of an obstruction that developed since its last inspection. Rather, defendant knew exactly
what this drain system could and could not handle. If the fact finder concludes that there was no
defect, then whether defendant “knew . . . about the defect” is a moot point. However, if the
factfinder concludes there was a defect, then there is no basis to claim that defendant was
unaware of it. Indeed, plaintiff William testified that his garage and porch had previously
flooded on at least three occasions during heavy rains and that he had notified the defendant only
to receive a response he described as “little to none.”
I would affirm and remand for trial.
/s/ Douglas B. Shapiro
-2-