 A17A1500. BLACKMON et al. v. PENA.                                            SE-057

      SELF, Judge.

      In this contract dispute, restauranteur Irma Pena sued contractor Kirk

Blackmon d/b/a Atlanta Concrete Creations and Kirk Blackmon, Inc. d/b/a Georgia

Sunroom (collectively, “Blackmon”) for damages related to work Blackmon

performed during the construction of an exterior patio and sunroom addition at Pena’s

restaurant. Following a bench trial, the Superior Court of Spalding County entered

a final judgment in Pena’s favor for breach of contract and negligent construction,

and Blackmon appeals. For the reasons that follow, we affirm.

      Evidence adduced at trial revealed that Pena had planned for some time to add

a patio and sunroom to the Mexican restaurant she and her husband owned in Forsyth.
Pena’s niece located Blackmon during an Internet search, telephoned him, and Pena

ultimately met with him at the restaurant. One to two weeks after meeting with him,

Pena signed two contracts with Blackmon on May 9, 2013, for the construction of an

exterior patio and a four-season sunroom.1 The contract prices for the sunroom and

the exterior patio were $53,997 and $13,000, respectively, and construction was to

begin “in 4-5 weeks” from May 9, 2013, and be completed in “3-5 weeks” (sunroom)

and “1-2 weeks” (exterior patio). Pena gave Blackmon a deposit of $28,000 when she

signed the contracts for the project, but did not hear from him for six to seven weeks

thereafter. In fact, Blackmon did not obtain a building permit until July 1, 2013 –

more than two weeks after construction was slated to begin and, in the case of the

patio, after the patio should have been completed.




      1
        The sunroom contract is silent as to whether the roof would be a gabled or
“studio” (which is a more flat design) roof. Although the contract refers to an
engineered roof, Blackmon testified that an “engineered roof can be gabled [or i]t can
be studio.” Indeed, although Blackmon’s statement of facts in his opening brief states
the sunroom contract required a “studio-style” roof, there is no such term in the
contract.

                                          2
      According to Pena, after viewing photographs of Blackmon’s work,2 Blackmon

told her that the sunroom addition “was going to blend in with the existing

building...[a]nd that’s what I expected.” As a result, Pena believed that Blackmon

would install a gabled roof on the sunroom, as depicted in his marketing materials,

to match the roof of the original restaurant. However, when work on the project

commenced, Pena reported being dissatisfied with Blackmon’s work. With regard to

the patio, Pena cited Blackmon’s use of warped wood on the pergola and the lack of

any support for concrete pavers on the patio resulting in uneven flooring and

puddling. Concerning the sunroom, Pena stated that Blackmon used residential doors,

rather than commercial doors with a push bar, for the emergency exits, and

complained that the painting was “bad,” the ceiling was too low, the flooring was

“really bad,” and the exterior stucco did not match the stucco on the original building

as promised. At one point, Pena asked Blackmon and his subcontractor, Hiram

“Shane” Stone, to rebuild the patio; they declined. Despite these concerns,

particularly with the installation of a flat roof rather than a gabled roof as she



      2
        Blackmon acknowledged that certain statements in his brochure, including
that he was bonded and insured, were not entirely accurate, stating that he “had
insurance in the past” and that he had only been bonded for work in Cobb County.

                                          3
envisioned,3 Pena neither asked Blackmon to stop work on the roof nor provided any

concerns in writing. In fact, Blackmon always told her that he had not finished and

that “[i]t’s going to be gorgeous, it’s going to look beautiful, you need to wait.”

      On September 23, 2013, Pena sent Blackmon a letter instructing him to stop

work on the project.4 At that point, some ten weeks after construction was due to be

completed, Pena testified that neither the exterior patio nor the sunroom were

functional for serving customers. Pena retained a new contractor, Bobby Ivey, who

removed and replaced the pergola and completed work on the exterior patio and the

sunroom. In doing so, Ivey removed the residential doors Blackmon installed and

replaced them with emergency exit doors and replaced the stucco. Ivey also removed

and replaced the flat roof of the sunroom with a gabled roof.5



      3
        A friend of Pena’s also reported concerns with the workmanship on the roof,
including a lack of screws to keep the roof in place during high winds and leaks in
the roof.
      4
       Of the total $66,997 contract price, Pena paid Blackmon $44,297, leaving a
balance due of $22,700.
      5
        Pena paid Ivey a total of $60,748.08 for his work, of which $20,819.35
comprised work on the roof. By subtracting the amount outstanding in Pena’s contract
with Blackmon ($22,700) from the amount Pena paid Ivey ($60,748.08), the trial
court concluded that Pena “paid $38,084[.80] more than what you bargained for with
Mr. Blackmon.”

                                          4
      For his part, Blackmon denied that Pena asked for a gabled roof. Instead, he

claimed Pena asked about a gabled roof but balked at the price. Regarding the quality

of the work, Blackmon testified that, while an inspector required that he make certain

changes to the electrical system, it and all other facets of his work ultimately passed

inspection. Blackmon’s subcontractor, Stone, testified that he began working on the

project in July 2013.6 Blackmon gave Stone a scope of work, which included

blueprints and drawings, and Stone used pre-engineered materials ordered specifically

for the project. The pre-engineered materials are designed to be waterproof, and Stone

never received any complaint concerning leaks at the project. No one complained to

Stone concerning the kind of roof being installed or attempted to stop him from

performing work.7 When he was eventually instructed to leave the project in

September 2013, Stone estimated that his work was “98 percent” complete and

further testified that the project was substantially complete, including completion of

the roof, windows, doors, trim, stucco, electrical system, and HVAC system. In fact,

Stone testified that the only work remaining to be done was cosmetic work to the

      6
       In 18 years as a subcontractor for Blackmon, Stone had built hundreds of
sunrooms, about five of which were sunroom additions to restaurants.
      7
       The only complaint noted by Stone was the lack of cement between sections
of concrete pavers on the patio.

                                          5
concrete floor. While the roof he built was a flat roof, Stone observed that the roof on

the adjacent original restaurant was a gabled roof.

      Neither Blackmon nor Pena requested that the trial court enter findings of fact

and conclusions of law in accordance with OCGA § 9-11-52 (a). As a result, at the

conclusion of the bench trial on November 4, 2016, the trial court filed a handwritten

final judgment in favor of Pena “against [Blackmon] for breach of contracts and

negligent construction in the sum of $38,084.08 plus costs.” Because it concluded no

fraud had been shown, the trial court declined to award punitive damages.

      On November 23, 2016, Blackmon filed a “Motion for More Definite Order”

pursuant to OCGA § 9-11-52 (c) in which Blackmon asked the trial court to “amend

and clarify” its judgment. But before the trial court ruled on Blackmon’s motion,

Blackmon filed a notice of appeal on November 29, 2016. On December 1, 2016, the

trial court purportedly vacated its November 4, 2016 judgment and, following a

hearing, entered a new final judgment containing findings of fact and conclusions of




                                           6
law on December 12, 2016, nunc pro tunc to November 4, 2016.8 Blackmon did not

appeal from the trial court’s December 12, 2016 order.

      1. As a threshold matter, it is plain that the trial court’s November 4, 2016

judgment constitutes a “final judgment.” OCGA § 5-6-34 (a) (1) (“Appeals may be

taken to the . . . Court of Appeals from the following judgments and rulings of the

superior courts . . .: [a]ll final judgments, that is to say, where the case is no longer

pending in the court below. . . .”). Moreover, “[t]he filing of a notice of appeal serves

to supersede a judgment and while on appeal, the trial court is without authority to

modify such judgment.” Aetna Cas. & Surety Co. v. Bullington, 227 Ga. 485 (1) (181

SE2d 495) (1971); BJL Enterprises v. Level One Contact, 314 Ga. App. 42, 45 (1)

(722 SE2d 877) (2012). As a result, the trial court’s December 1, 2016 order

“attempting to vacate the prior [November 4, 2016] judgment, though rendered during

the same term of court, was a nullity, even assuming that the prior judgment could be


      8
        We note that the trial court’s December 12, 2016 judgment demonstrated an
improper use of a “nunc pro tunc” entry. “[T]he purpose of a nunc pro tunc entry is
to record some previously unrecorded action actually taken or judgment actually
rendered. It may not be used to supply an order not yet made by the court.” (Citation
and punctuation omitted.) In the Interest of H. L. W., 244 Ga. App. 498 (535 SE2d
834) (2000) (nunc pro tunc entry “did more than correct mere ‘clerical errors’ or
record some previously unrecorded action and was, therefore, an improper use of a
nunc pro tunc entry”). Id.

                                           7
set aside without any meritorious reason being given therefor.”9 Bullington, 227 Ga.

at 485 (1). See also Level One, 314 Ga. App. at 45 (1). It necessarily follows that the

trial court’s December 12, 2016 order is, likewise, a nullity. See Bullington, 227 Ga.

at 485 (1).

      However, these subsequent orders do not necessarily render Blackmon’s appeal

from the November 4, 2016 final judgment moot, see, e.g., In the Interest of R. W.,

186 Ga. App. 885 (1) (368 SE2d 824) (1988); D. P. v. State, 129 Ga. App. 680, 681

(1) (200 SE2d 499) (1973), although the absence of written findings of fact and

conclusions of law “is ground for affirmance when they are necessary for resolution

of the issue on appeal.” Beeks v. Consultech, Inc., 222 Ga. App. 473, 474 (474 SE2d

675) (1996). Blackmon’s opening brief to this Court contains five enumerations of

error. To the extent the record permits, we will address each in turn.

      2. Enumerations 1, 2, and 4 challenge certain specific findings of fact and

conclusions of law in the trial court’s December 12, 2016 order. In view of our




      9
        Spalding County has two terms of court annually, beginning the “[s]econd
Monday in March and [the] second Monday in September.” OCGA § 15-6-3 (19) (C).
As a result, each of the relevant filings in this case occurred during the September
term of court.

                                          8
discussion in Division 1, supra, these enumerations present nothing for our review.10

See Beeks, 222 Ga. App. at 474.

      3. In his third enumeration, Blackmon contends that the trial court “ignored”

Pena’s failure to provide a written objection to his work, as required by the parties’

contracts, and instead allowed Blackmon to continue working on a roof Pena did not

want. Similarly, Blackmon’s fifth enumeration contends that he “is entitled to have

this case decided by this [C]ourt de novo.” It appears that the substance of these

arguments is that this case involved contract enforcement for which Blackmon should

have prevailed, and that the enforcement of contracts is a question of law subject to

de novo review on appeal.11 However, Blackmon never presented to the trial court

any argument concerning the need for construction of the parties’ contracts.12 Rather,


      10
         We further note that Enumeration 4 is not supported by a single citation of
authority. See Court of Appeals Rules 25 (a) (3) and 25 (c) (2).
      11
        Because this enumeration does not address the trial court’s judgment in favor
of Pena for negligent construction, we do not reach that portion of the judgment.
      12
         The trial court’s statements concerning ambiguity in the parties’ contracts,
made during a December 12, 2016 hearing on Blackmon’s “Motion for More Definite
Order,” were not memorialized in its December 12, 2016 judgment. See Beeks, 222
Ga. App. at 474 (“Oral findings are not sufficient.”). In any case, the remarks are not
relevant to our decision because the trial court was without authority to vacate its
November 4, 2016 order, to conduct the December 12, 2016 hearing, or to enter the
December 12, 2016 judgment. See generally Bullington, 227 Ga. at 485 (1).

                                          9
he argued that Pena received the roof required under the parties’ contract and that she

simply “just changed her mind about what she wanted.”

      Nevertheless, the proper inquiry in this case is whether there was any evidence

to support the trial court’s conclusion that Pena was entitled to recover for a breach

of the parties’ contracts. See Infinite Energy v. Cottrell, 295 Ga. App. 306, 307 (671

SE2d 294) (2008) (“On appeal from a bench trial, we construe the evidence favorably

to the trial court’s judgment and affirm if any evidence supports it.”) (emphasis

supplied); Dabdoub v. Global Home Image, 291 Ga. App. 298, 299 (661 SE2d 669)

(2008). To that end,

      [o]n appeal, this court must not substitute its judgment for that exercised
      by the trial court when there is some support for the trial court’s
      conclusion. Our duty is not to weigh evidence de novo, but to merely
      determine if there is any evidence which supports the judgment below.
      Even in the face of conflicting evidence, the trial court’s judgment will
      be upheld as long as there is any evidence to uphold the lower court’s
      determination.


(Citations and punctuation omitted; emphasis supplied.) Edwards v. Wilson, 185 Ga.

App. 514, 515 (1) (364 SE2d 642) (1988) (citing Cessna Finance Corp. v. Design

Eng. & Constr. Intl., 176 Ga. App. 206, 208 (335 SE2d 625) (1985)). In that vein,

evidence revealed that Pena and Blackmon executed two contracts for the

                                          10
construction of an exterior patio and sunroom, respectively; that the sunroom contract

was silent as to the type of roof to be installed; that, after discussions with Blackmon

and reviewing Blackmon’s marketing materials, Pena expected Blackmon to construct

a gabled roof for the sunroom that matched the roof of the existing restaurant

building; that Pena never received contrary drawings or specifications for the

sunroom from Blackmon; that an engineered roof as stated in the parties’ sunroom

contract could refer to a gabled or “studio” roof; that Blackmon failed to commence

work within a certain time frame as required by the contracts; and that Blackmon

constructed a “studio” (i.e., more flat) roof.13

      Moreover, the trial court found that Pena paid Ivey, the second contractor, a

total of $60,748.08 for his work. By subtracting the amount outstanding in Pena’s

contract with Blackmon ($22,700) from the amount Pena paid Ivey ($60,748.08), the

trial court concluded that Pena “paid $38,084[.08] more than what [she] bargained for

with Mr. Blackmon” and awarded Pena $38,084.08. As a result, because there was

      13
         As the trier of fact, the trial court apparently determined that Blackmon’s
conflicting testimony that Pena ordered a flat roof and that he gave her plans
demonstrating a flat roof was not credible. See Rice v. Lost Mountain Homeowners
Assn., 269 Ga. App. 351, 357 (7) (604 SE2d 215) (2004) (“Where the trial court is the
finder of fact, it determines weight, credibility, opinion evidence, sufficiency, and
admissibility of all evidence; if there is any evidence to support the judgment, it must
be affirmed.”).

                                           11
some evidence to support the trial court’s conclusion, we affirm the trial court’s

judgment in favor of Pena on her claim of breach of contract. See Infinite Energy, 295

Ga. App. at 307; Dabdoub, 291 Ga. App. at 299; Rafferzeder v. Zellner, 272 Ga. App.

728, 731 (2) (613 SE2d 229) (2005) (“the measure of an owner’s damages for a

construction contractor’s breach is the cost of completing the contract or correcting

the defective work, minus the unpaid part of the contract price.”) (punctuation,

footnote, and emphasis omitted).

      Judgment affirmed. Dillard, C. J., and Ray, J., concur.




                                         12
      SELF, Judge, concurring specially.

      For more than eleven years, I have had the good fortune and distinct privilege

to serve my fellow Georgians as a trial and appellate judge. Without a doubt, this

unique and unparalleled opportunity has been the highlight of my legal career. With

the filing of this opinion, my service on this distinguished Court and in Georgia’s

judicial system comes to an end. As others have occasionally done, I am taking a

point of personal privilege in my last opinion to thank some of the many people who

have meant so much along this journey.1

1
 See, e.g., McCain v. State, 300 Ga. 400, n.3, (794 SE 2d 58)(2016) (Thompson,
C.J.); Gwinnett Cty. v. Yates, 265 Ga. 504, 509(458 SE 2d 791, 795)(1995) (Hunt,
C.J.); Davis v. City of Macon, 262 Ga. 407(421 SE 2d 278)(1992) (Weltner, C.J.,
      I wish to thank the voters of the Macon Judicial Circuit who first elected me

in 2006; without their confidence and support, I would not have a judicial career.

During my time on the superior court bench, I served with some of the finest trial

judges in our great state and learned many valuable lessons from each of them.

      I owe Governor Nathan Deal an immeasurable debt for the trust and confidence

he showed when he appointed me to this Court. No governor has impacted the

judicial branch more than Governor Deal and it was an honor and privilege to be

among his appellate appointees.

      I wish to thank the members of this Court who have treated me so kindly and

become like family. These talented and gifted judges, attorneys, and staff serve our

great state with honor and integrity every day to insure this portion of our appellate

legal system works extraordinarily well, and it was an honor to serve with them.

      I have always believed it wise to surround oneself with those smarter and more

talented. For the last year, I had that pleasure by serving on this panel with my fellow

middle Georgians, Chief Judge Stephen Dillard and Presiding Judge Billy Ray. I

could not have asked for a better team and I thank them for their hard work, sharp


concurring); Grantham v. State, 244 Ga. 775, 776 (262 SE 2d 777) (1979) (Hall, J.,
concurring).

                                           2
pens, and great wisdom. They made my opinions better and saved me from many a

pitfall. They have made me a better judge and a better person.

         Finally, I wish to thank my longtime assistant, Cheryl Collins, and my

unmatched staff attorneys Julianne Whisnant, Jessica Wright, and Chad Jacobs for

their excellent work. They deserve all of the credit for our exceptional opinions and

I alone take the blame for any mistakes. Each work tirelessly behind the scenes with

little recognition and our Court is lucky to have them. Like Kunz, one of the many

heroes in Sir Thomas Carlyle’s Sartor Resartus, they have consistently turned chaos

into order, and done so with amazing skill, Job-like patience, and limitless grace.2

They truly exemplify the maxim: “sic vos non vobis.”3

         I will always cherish my time on this most honorable Court.

         God bless the great State of Georgia; may she forever endure as the greatest of

all states.




2
    Sartor Resartus, Sir Thomas Carlyle 93 (Odyssey Press 1937).
3
    “Thus ye labour, but not for yourselves.” Id., p. 235.

                                            3
4