STATE OF VERMONT
SUPERIOR COURT ENVIRONMENTAL DIVISION
Vermont Unit Docket No. 139-10-13 Vtec
CIVIL DIVISION
Washington Unit Docket No. 307-5-06 Wncv
Bradford Oil Property 'CAP'
State of Vermont, DECISION ON THE MERITS
v.
Bradford Oil Company, Inc.
Bradford Oil Company (Bradford) appeals the “Final Corrective Action Plan” (the CAP)
issued by the Agency of Natural Resources (ANR or the Agency) relating to environmental
contamination on Bradford’s property in the Town of Springfield, Vermont. The Springfield
Regional Development Corporation (SRDC), the owner of property located across Clinton Street
from Bradford’s property and affected by the CAP, also challenged the CAP in a cross-appeal.
SRDC and ANR entered into a Stipulation on May 20, 2014 that provided for dismissal of SRDC’s
appeal.
In a related civil enforcement matter, Bradford was found liable under 10 V.S.A. § 6615
for the contamination. State v. Bradford Oil Co., No. 307-5-06 Wncv, slip op at 6–7 (Vt. Super.
Ct. Oct. 25, 2012) (Teachout, J.), available at https://www.vermontjudiciary.org/
20112015%20Tcdecisioncvl/2012-10-26-5.pdf. The only remaining issue in that case is the
court’s determination of the appropriate remedy—namely, whether the CAP should be
adopted as the injunctive remedy. The civil matter has been specially assigned to the
undersigned in order to coordinate a fair and efficient resolution of both CAP appeals and the
remedy determination in the civil matter.
1
In advance of the merits hearing, on June 3, 2014, the parties and the Court performed
a site visit. Appearing at the site visit and merits hearing were Attorneys George McNaughton
for Cross-Appellant SRDC, W. Scott Fewell and N. Joseph Wonderly for Appellant Bradford Oil
Company, Mark J. DiStefano and Kyle H. Landis-Marinello for the State of Vermont Agency of
Natural Resources, and Stephen S. Ankuda for the Town of Springfield.
Based upon the evidence presented at trial, including that which was put into context by
the site visit, the Court renders the following Findings of Fact.
Findings of Fact
1. The property at issue in the related matters is the former Springfield Manufactured Gas
Plant located at 197 Clinton Street, Springfield, Vermont (MGP Site or the Site) which is now
owned by Bradford Oil Company.
2. The Site is less than 1.5 acres in size.
3. The Site operated from approximately 1906 to 1951 as a Manufactured Gas Plant
(MGP). An MGP is an industrial facility where gas is produced from coal, oil, and other
feedstocks. Gas was produced and stored at the Site and then piped to the surrounding area
where it was used for lighting, cooking, and heating.
4. Many Vermont towns had an MGP plant at one time.
5. Coal tar, coal oil byproducts, and other byproducts of the manufacturing process were
commonly stored at MGP sites.
6. The MGP Site lies immediately to the west of Clinton Street. Across from the MGP Site
and to the east of Clinton Street lies the former Jones and Lamson (J&L) site, currently owned
by SRDC.
7. The J&L site is bordered to the east by the Black River, which is approximately 500 feet
east of and generally down-gradient from the MGP Site.
8. SRDC intends to redevelop the J&L site although no specific plan was presented to the
Court.
9. After its use as an MGP, the Site was operated as a propane plant through the 1980s.
10. None of the original MGP above-ground structures still exist at the Site.
2
11. Bradford purchased the Site in 1997 and in 1998 demolished all the buildings to re-
develop the Site as a gasoline station and convenience store.
12. During the Site work in 1998, Site soils were excavated and deposited off-site. An
environmental enforcement officer (EEO) observed the activity and noticed the smell of coal or
oil within the soils.
13. Bradford was ordered by the Department of Environmental Conservation (DEC) Waste
Management Division, within the Agency of Natural Resources (ANR), to investigate on-site
contamination.
14. Bradford retained Marin Environmental to perform a Site investigation, including
sampling and analysis. The investigation, which began in the late 1990s and continued until
more recently, showed elevated contaminate levels on-site, specifically volatile organic
compounds (VOCs) and polynuclear aromatic hydrocarbons (PAHs).
15. During Site investigations, subsurface structures were uncovered such as concrete
walls, concrete vaults, piping, and underground storage tanks. These features had coal tar
contaminate materials in and around them.
16. It is difficult to fully remove coal tar contamination, especially when the contamination
is in and around subsurface structures.
17. During Bradford’s redevelopment of the Site, the subsurface structures were removed
to the extent possible. Some structures and piping were left in place.
18. Soil and groundwater samples from the J&L site identified coal tar and coal oil
contamination that is likely to have migrated from the MGP site.
19. In approximately 2005, Bradford informed the ANR that it was not going to undertake
further investigation or environmental monitoring of the Site or surrounding area.
20. ANR contracted with the Johnson Company to undertake further environmental
investigation of the Site and surrounding area.
21. The Johnson Company initiated its investigation in the fall of 2007. This investigation
included soil sampling, ground water monitoring, sample analysis, and a fate and transport
analysis.
3
22. As part of its investigation, the Johnson Company considered possible migration
pathways from the MGP Site and whether the contamination detected on the J&L site was
migrating from the MGP Site.
23. ANR paid the Johnson Company a total of $38,227 for its work in 2007 and 2008.
24. Marin underwent some corporate changes and became Environmental Compliance
Services, Inc. (ECS). ECS completed further environmental investigations of the Site for
Bradford in 2006 and 2009.
25. Both the Johnson Company and ECS concluded that contamination is migrating from
the MGP Site to the J&L site.
26. This contamination includes: Light Non Aqueous Phase Liquids (LNAPLs), Dense Non
Aqueous Phase Liquids (DNAPLs), and dissolved volatile and semi-volatile organic compounds as
well as sorbed contamination and possible gas phase contamination in the subsurface.
27. Sometime around 2011, Bradford retained Key Environmental, Inc. to conduct
additional analysis of the environmental data collected to date and to complete some limited
site investigation.
28. The purpose of Key Environmental’s site work was to identify additional subsurface
anomalies such as previously unidentified pipes or structures.
29. Based upon all the data collected to date, all parties’ environmental consultants agree
that there is MGP contamination, including LNAPLs, DNAPLs, and dissolved phase
contaminates, at both the MGP Site and the J&L site. Non Aqueous Phase Liquids (NAPLs) are
difficult to sample and analyze because the material muddles up laboratory equipment used to
test levels of contamination. Thus, if NAPL is detected, the material is typically not analyzed for
contaminate levels, however the amount of NAPL is generally noted. These data points,
indicating the location and amount of NAPL are used to determine NAPL migration.
30. The contaminates at issue in these matters, including coal tar related DNAPLs, are of a
very persistent nature.
31. NAPLs do not dissolve easily in water. Over time, however, NAPLs will slowly dissolve
in water creating a dissolved phase contaminate plume. DNAPLs are unpredictable and
4
degrade over long time periods, making it difficult to forecast when groundwater contaminate
concentrations will comply with regulatory standards.
32. The parties’ experts agree that it is likely that MGP contaminates, especially
naphthalene, a volatile organic compound, will continue to exceed the Vermont Groundwater
Enforcement Standards (VGES) of 20 parts per billion (ppb) for more than 30 years.
33. Bradford and its consultants generated three (3) Corrective Action Feasibility
Investigation Reports (CAFIs).
34. Several options were considered by ANR and Bradford for Site remediation, including
contaminate removal by excavation and disposal off-site, extraction and treatment of
groundwater, injection of bioremediation measures, soil flushing, containment and
remediation, and combinations of these procedures.
35. The costs of these alternative remedial programs are estimated between $65,000 and
$2,400,000.
36. Because the MGP Site is immediately adjacent to Clinton Street, a major roadway in
Springfield, remedial efforts disrupting traffic on Clinton Street would have a negative effect on
the local economy.
37. Installation of containment devices has questionable effectiveness and may actually
result in adverse effects as disturbing the ground in the area could alter the geological
conditions and cause the contamination to move.
38. The groundwater table in the area is approximately 12 feet below ground surface.
39. Groundwater in the area flows generally in an easterly direction toward the Black River.
Flow is generally restricted to a geologic channel that flows in a northeasterly direction from
the MGP Site across Clinton Street and in a southeasterly direction from the J&L site toward the
Black River.
40. The dissolved phase NAPL contamination flows in a plume through this channel as the
channel is the preferential pathway.
41. Because DNAPL is heavier than water, it does not always follow groundwater flow.
Rather DNAPL will migrate down until it reaches a layer of earth that it cannot penetrate, such
as clay or rock. It will then follow these geologic formations, displacing the groundwater
5
therein. DNAPL therefore flows toward and into geologic depressions or sinks where it will
accumulate and collect until it spills over the edges of the sinks.
42. A dense clay geologic layer underneath the MGP Site, Clinton Street, and the J&L Site
acts as a floor upon which DNAPL travels.
43. Some contaminates have migrated into low permeability materials, such as silts and
clays, making it difficult to remediate and causing ongoing contamination for decades.
44. The J&L property has its own on-site contamination, likely from former on-site tooling
activities. These contaminates include petroleum, PCBs, chlorinated solvents, and metals.
45. Napthalene contamination is present on both the MGP and J&L sites.
46. Both LNAPL and DNAPL contamination are present on the MGP and J&L sites.
47. Contaminates originating from both sites may have intermingled on the downgradient
J&L property.
48. Site investigation and sampling efforts to date have been fragmented and separated by
large periods of time. This limits the ability to understand past and present subsurface
contamination and migration and the ability to predict future trends.
49. To better monitor contamination, all monitoring wells should be sampled on the same
day(s). This will provide better data to predict groundwater flow and contaminate movement.
50. Based upon data collected to date, it cannot be concluded that DNAPL is in dynamic
equilibrium. This means DNAPL contamination and its migration remains unpredictable.
51. MGP contaminates have migrated onto the J&L site and are present in excess of the
VGES.
52. Investigation and sampling to date has generated little information regarding
environmental conditions under Clinton Street.
53. New development, demolition and re-building, or heavy equipment driving on the sites
could impact migration of DNAPL and dissolved phase contamination. This is because the
DNAPL contamination is not very deep below the ground surface. Thus, excavation and heavy
construction or deconstruction activities can mobilize DNAPL that is otherwise not mobile.
6
54. Redevelopment of the MGP and J&L sites raises concerns of mobilizing contamination,
altering contaminate migration direction, and creating the need for special handling of any
excavated materials.
55. Reconstruction of Clinton Street in the area of the MGP Site is likely at some future
date. Servicing and replacing underground utilities in this area is also likely at some future date.
56. DEC’s Investigation and Remediation of Contaminated Properties Procedure Section 4.1
states that when it is demonstrated that remediation is not feasible, or that it will not
remediate a site any faster than natural attenuation, the Waste Management Divsion Site
Management Section (SMS) may allow long term monitoring of natural attenuation instead of
active remediation, provided that public health and the environment are protected.
57. All parties agree that active remediation is not feasible.
58. The chosen remedy for the site as set forth in ANR’s CAP is based upon ANR’s
Investigation and Remediation of Contaminated Properties Procedure (IROC).
59. ANR’s CAP includes land use restrictions and long term monitoring of natural
attenuation of contaminates. The land use restrictions include reclassification of groundwater
in the area affected, implementation and recording of deed restrictions in the land records to
prevent contact with contaminated media by subsurface construction or utility work, and vapor
intrusion into buildings overlying the area of contamination. These actions will mitigate the
risks to public health or the environment and allow natural attenuation to degrade the
contaminant mass while the contamination is monitored.
60. The Black River is a sensitive receptor. As of the time of the last sampling in 2009,
there was no indication that MGP contamination had or was impacting the Black River. There
has not been sufficient sampling and data collection to date to predict whether MGP
contamination will reach the Black River.
61. Contaminate contact with humans is also a sensitive receptor.
62. Sampling frequency under the CAP is quarterly for the first two years, semi-annually in
years 3 and 4, and annually in year 5 and thereafter.
63. Contaminates of concern are so persistent and degrade so slowly that monitoring may
be required for 25 years or more.
7
64. Quarterly sampling in years 1 and 2 is necessary to generate baseline data as no
sampling has occurred since 2009.
65. Groundwater samples are analyzed for the contaminants of concern. If, however,
NAPL (free product) is encountered in a well, then the thickness of the NAPL will be measured
and no analysis performed.
66. The long term monitoring plan does allow for proposals to decrease the number of
wells being sampled and/or decreasing the sampling frequency after year 4. Such proposal may
be made every 5 years.
67. Sample analysis 8260 detects all volatile organic compounds, including naphthalene
and chlorinated solvents. Sample analysis 8015 does not detect chlorinated solvents.
68. Napthalene is common to both the MGP and J&L sites, whereas chlorinated solvents
are only found in J&L site contamination.
69. Monitoring well NW-4 is located on the eastern side of the J&L site close to the Black
River. This well is intended to monitor for any contamination migrating to the Black River. Site
specific contamination from both the MGP and J&L sites could migrate from each site toward
the Black River and be detected in this well.
70. As part of the groundwater monitoring program there are three sentinel wells; MW-04-
14, MW-04-16 and NW-4. These wells are clean, meaning they have yet to detect any
contamination from the MGP site.
71. As set forth in ANR’s CAP, the estimated cost for each groundwater monitoring well to
be installed and monitored over a 30 year period is approximately $50,000. This includes
installation, sampling and analysis, and reporting.
72. Prior to the coordinated merits hearing, ANR and SRCD filed a stipulation regarding the
Environmental Division appeal and the Civil Division enforcement action. This Stipulation
relocated NW-04 to a nearby location to accommodate SRDC’s redevelopment interests and
specifies deed restrictions for a portion of SRDC’s property.
73. The deed restrictions within the CAP relate to a portion of SRDC’s property, a section of
Clinton Street impacted by MGP contamination, and the entire MGP Site. The restrictions do
not prohibit development or construction activity, but rather prevent the installation of
8
drinking water wells, require appropriate precautions to protect human health during
excavation or other subsurface work, and require appropriate precautions to ensure against
vapor intrusion from the subsurface contaminate plume into overlying buildings.
74. The CAP further requires Bradford to petition to reclassify affected groundwater from
Class III to Class IV.
Conclusions of Law
The parties’ environmental consultants provided opinions as to the scope of
contamination at the MGP Site and the suggested remedial measures. These opinions were all
similar in concept, however, they differed as to the number and placement of wells and the
duration for sampling and monitoring. While the environmental consultants have slightly
differing opinions as to NAPL and dissolved phase contamination sources and how the
contamination is migrating, they all agree that MGP contamination has migrated to the J&L site.
Furthermore, they all agree that sampling to date has been too sporadic and the resulting data
insufficient to know whether the contamination is stable and in a state of dynamic equilibrium.
Thus, additional sampling and analytical data is necessary to better understand the extent of
the contamination and to predict how the MGP contamination may migrate in the future, any
natural attenuation of the contaminate plume, and any possible effect on sensitive receptors.
Based upon the evidence, we conclude that NAPL and dissolved phase contamination in
groundwater on the MGP and J&L sites poses a threat to public health from contact or
ingestion and that the sites will remain contaminated for the foreseeable future. Furthermore,
NAPL fate and transport is complex and there is insufficient data to date to know whether
contaminate levels are stable and in equilibrium. Lastly, we conclude that because the Black
River is a sensitive receptor located groundwater downgradient from the contamination,
monitoring is appropriate to ensure the contamination does not threaten the river. While
Bradford’s environmental consultant opined that it is not possible for MGP contamination to
reach or impact the Black River, we conclude that this opinion is not supported with sufficient
scientific data.
Deference
9
We first address arguments from both ANR and Bradford regarding what degree of
deference is to be afforded to ANR in determining the appropriateness of the CAP and the
remedy in the Civil Enforcement matter. As a general rule, Courts defer to an agency’s
interpretation of its own regulations. In re ANR Permits in Lowell Mountain Wind Project, 2014
VT 50, ¶ 17. Deference is inappropriate, however, where the proposed interpretation would
result in unjust, unreasonable, or absurd consequences. In re Verburg, 159 Vt. 161, 165 (1992).
Furthermore, no deference is given to agency litigation positions that are wholly unsupported
by regulations, rulings, or administrative practices. Bowen v. Georgetown Univ. Hosp., 488 U.S.
204, 212–13 (1988). These principals are equally applicable whether the matter is a de novo
appeal of agency action or a civil enforcement action.
In a de novo appeal, the ultimate decision appealed (here the CAP) is not entitled to
deference per se, but the Agency’s prior regulatory interpretations may be. Lowell Mountain
Wind Project, 2014 VT 50, ¶ 11 (noting that with a de novo statutory review no deference is
owed to the “permit decision” on appeal but deference is given to agency interpretation of
regulations and statutes it implements within its area of expertise). Thus, this Court will not
defer to ANR’s CAP. We will, however, defer to ANR’s technical guidance documents. The
Agency has established procedures for the remediation of contaminated properties within a
document entitled “Investigation and Remediation of Contaminated Properties Procedure”
(IROC) admitted at trial as exhibit ANR-4. The IROC is a technical guidance document which
interprets the Agency’s regulatory authority and process as it relates to the remediation of
contaminated properties. The IROC is thus entitled to deference from the Court. The parties
dispute whether we must give deference to the CAP itself. As noted above, in a de novo appeal
before the Environmental Division, it would be improper to give deference to the CAP.
Whether, in the context of the civil enforcement action some degree of deference is owed to
the CAP as an Agency decision made within its area of expertise is a question we need not
answer because whether we defer to the CAP or not we reach the same result based on the
provisions of Title 10 Chapter 159 and the IROC.
The Corrective Action Plan
10
The parties and their experts generally agree on the overall remedial approach outlined
within ANR’s revised CAP dated September 26, 2013 and last revised on May 12, 2014. We
therefore conclude that the requirements of the revised CAP, Exhibit ANR-17B and as further
depicted on Exhibit ANR 35, are necessary and reasonable and in accord with the IROC. (See
IROC, Ex. ANR-4 at 31–32 (describing use of long-term monitoring as an acceptable site
management technique)). Where noted below, however, we require certain modifications to
the revised CAP to reflect the agreement of the parties at trial, or the evidence presented
through the parties expert witnesses.
As noted above, the CAP includes two main elements: land use restrictions and long-
term monitoring. First, the land use restrictions and Bradford’s obligation to pursue
reclassification of groundwater as described and set forth in Exhibit ANR-17B, Section 4.2.1 are
reasonable and necessary based on the evidence presented at trial and the procedures in the
IROC. (See IROC, Ex. ANR-4 at 34–36). Bradford shall provide ANR with separate proposed
deed restrictions within 60 days of this Order for the entire Site and the impacted portion of
Clinton Street. The Town shall cooperate in good faith with Bradford in developing the deed
restriction for Clinton Street. SRDC has agreed to the deed restrictions for the J&L property.
(See ANR and SRDC Stipulation). Furthermore, within 60 days of this Order, Bradford shall
provide ANR with a draft petition to reclassify groundwater from Class III to Class IV as required
by the CAP.
With respect to the CAP’s long term monitoring program, Bradford asserts that fewer
wells are required and challenges whether monitoring must continue until contamination levels
fall below enforcement standards. SRDC does not challenge the number of wells required
under the revised CAP, however, SRDC asserts that increased sampling frequency and a few
years of sampling and data collection are necessary to determine whether the MGP
contamination is in a steady state or migrating. According to the IROC the purposes of the long
term monitoring program are:
To identify time variant trends in environmental conditions and/or in the
operation of remedial systems.
To understand environmental conditions and tracking the fate and transport
and/or attenuation of contamination.
11
To determine if and when action must be taken to further control the release,
reduce risks to receptors, improve remedial system performance, conduct
further site investigation, or discontinue corrective actions.
To determine when site management activity completed status is appropriate.
(IROC, Ex. ANR-4 at 32). Thus, each proposed monitoring well will be included in the program
so long as it is in furtherance of these purposes. For the majority of the monitoring wells ANR,
Bradford, and SRDC are in agreement that the inclusion of the wells in the monitoring program
is necessary to meet the purposes described in the IROC.
Bradford, however, objects to specific monitoring wells as follows. Bradford asserts that
monitoring well JL-101, the northerly most well on the J&L property, should be relocated to a
nearby southeasterly location as shown by pink highlight on Exhibit ANR-35. Bradford offers
that this relocated position would be a better location to monitor for contamination migrating
toward the Black River and that if placed in this location, JL-101 would obviate the need for well
NW-4. Bradford is opposed to NW-4 because of its concern that if contamination is detected
within this well, it may not be possible to determine its source as originating from the MGP Site
or J&L site.
Bradford also objects to NW-04-14, a sentinel well1, arguing it is too far removed from
MGP contamination and will not act as an early warning well. Furthermore, Bradford is
concerned about the possibility of residual contamination from a 70,000 gallon UST tank
formerly on the J&L site located by the chip shed, which at one time contained petroleum
products. Thus, Bradford argues that if contamination is shown in the well, it will be difficult to
know whether it is from the MGP Site, for which it is responsible, or the J&L site, which it
arguably is not. Lastly, NW-04-14 would be expensive to install and sample and therefore does
not meet CAP guidelines. As for sentinel well NW-04-16, Bradford advances the same concerns
but argues that well NW-04-16 is located even closer to the location of the former chip shed,
which would create a greater probability of residual contamination interfering with
contamination readings.
1
A sentinel well is a groundwater monitoring well situated between a sensitive receptor downgradient and the
source of a contaminant plume upgradient. Contamination should be first detected in the sentinel well which
serves as a warning that contamination may be moving closer to the receptor.
12
As we conclude above, there is insufficient data collected to date to confidently predict
the migration of MGP contamination on or across Bradford’s Site, Clinton Street, or the J&L
property. No party argues that JL-101, NW-4, MW-04-14, or MW-04-16 will be unsuccessful in
detecting contaminate migration to the north or toward the Black River, should that occur.
Bradford’s concerns go more to the possibility of non-MGP contamination being detected in a
well. Based upon the expert’s testimony, this concern can be addressed through additional
sampling and expanded analyses of the samples. Absent a compelling reason to alter proposed
monitoring well locations, we will honor SRDC’s understanding and agreement with ANR on the
placement of monitoring wells on its property, which apparently will minimize adverse impacts
on SRDC’s plans to redevelop its property. Based upon the evidence before the Court at this
time, we find no compelling reason to alter monitoring well locations JL-101, NW-4, MW-04-14,
or MW-04-16.
With respect to NW1 and NW2, expert testimony debated the need for both wells or
whether a single well in this area would be sufficient. While ANR asserts that it prefers both
wells, ANR also acknowledged that a single well at the NW1 location would be an acceptable
alternative. The compelling testimony of both SRDC’s and Bradford’s experts affirmed that
having two wells so near each other in this location was not necessary to further the purposes
of the IROC, and that a single monitoring well would suffice. Thus, we will eliminate NW2.
When pressed at trial, ANR’s expert witness agreed with the expert witnesses of
Bradford and SRDC that the goals of the IROC and the CAP are met without inclusion of
monitoring well NW-3. That well is therefore also eliminated from the monitoring program. As
for MW-14, Bradford argues that it is outside the preferred pathway and useless, as opposed to
ANR and SRDC’s suggestion that it is a good location to identify the southern end of the
contamination plume. Thus, we conclude that it is necessary and reasonable to keep MW-14.
Required Groundwater Monitoring Wells
The Court therefore concludes that ANR’s well array consisting of the wells listed on
pages 18 and 19 of the Revised CAP, Exhibit ANR-17B, and as depicted on Exhibit ANR 35, are
necessary and reasonable with the following modifications:
13
1. Wells GMW-2, GMW-4, MW-10S, JL-103, JL-4, MW-12, MW-13, MW-14, MW-6,
MW-9S, JL-101, MW-04-14, MW-04-16 remain as shown and described.
2. Wells NW-2 and NW-3 are eliminated.
3. NW-4 (NW-4S/4D) – Pursuant to the Stipulation between ANR and SRDC, this well is
to be relocated to facilitate the potential redevelopment of the SRDC property. The
new location is shown on Exhibit ANR-35. This well will consist of a nested shallow
well (NW-4S) and a deep well (NW-4D). There is some concern that if contamination
is detected within this well, it may not be possible to know whether its source is
MGP or J&L site contamination. Both Bradford and SRDC are free to present
evidence of the source of any such contamination in response to the sample analysis
results. The most important determination, however, will be whether the potential
exists that MGP contamination is migrating towards the Black River, and if it does,
whether further steps are needed to protect that sensitive receptor.
Monitoring Frequency
The revised CAP sets forth an initial 5 year period for groundwater sampling and
analysis. Specifically, quarterly sampling is required in the first two years to gather baseline
data and to account for any seasonal fluctuations. Semi-annual sampling and analysis is
required for the next two years followed by annual sampling in year 5. After year 5, the CAP
requires annual sampling for the next 25 years. The CAP allows for Bradford to periodically
request, based upon collected data, less frequent sampling and the elimination of wells from
the sampling program. ANR selected the 30 year monitoring period because it is likely that
MGP contaminates, especially naphthalene, will continue to exceed the VGES of 20 ppb for
more than 30 years.
Bradford argues that because the MGP ceased operations in 1951, any release occurred
long ago and even though environmental contamination is apparent, based upon sampling and
data generated to date, the contamination plume is stable. Thus, Bradford argues that a 2 year
quarterly monitoring program is sufficient to understand seasonal impacts and that statistical
analysis can be used to predict long term stability. If this approach does not support
contaminate stability, then Bradford agrees that longer term monitoring is appropriate.
14
SRDC agrees that without seasonal groundwater fluctuations, 2 years of quarterly
sampling will likely be sufficient. If, however, there is seasonal fluctuation, SRDC argues that 8
years of quarterly monitoring may be required to understand contamination conditions.
As part of ANR’s rebuttal, ANR agreed that quarterly sampling and analysis for the first 2
years would provide enough data for Bradford to make a formal request to modify the CAP
(Section 4.2.2.6) to reduce the number of wells to be sampled in the future. According to ANR,
Bradford would be required to continue semi-annual sampling, analysis, and reporting with
sampling occurring in the late fall and late spring while ANR considers Bradford’s request to
modify the CAP. The parties propose that once Bradford files a request to modify the CAP, ANR
must respond in writing within 30 days, and thereafter, Bradford would then have 30 days to
reply to ANR’s response.
We conclude that it is reasonable to require Bradford to perform quarterly sampling,
analysis and reporting for the first 2 years and that based upon this data Bradford could then
make a formal request to modify the CAP to reduce the number of wells to be sampled in the
future. Bradford will be required to continue semi-annual sampling, analysis, and reporting,
with sampling occurring in the late fall and late spring, while ANR considers Bradford’s request
to modify the CAP. Once Bradford files a request to modify the CAP, ANR must respond in
writing within 30 days, and thereafter, Bradford will then have 30 days to reply to ANR’s
response. ANR must then issue a written decision on Bradford’s request within 45 days; this
decision will be appealable to this Court. The CAP is otherwise unmodified with respect to
sampling frequency, reporting and requests for modification of the CAP.2
The CAP’s long term groundwater monitoring program is based upon the hypothesis
that the LNAPL, DNAPL, and dissolved phase contaminate plumes are in a state of dynamic
equilibrium, meaning that NAPL accumulations are essentially stable. The data upon which this
hypothesis is based are several years old, from different monitoring points and times, and thus
insufficient. It is therefore necessary to collect more data on an ongoing basis to further
analyze this hypothesis.
2
Bradford summarily challenged the CAP’s ‘three-tiered Approach” to the long term monitoring. Based upon the
evidence before the Court, although this approach has not been previously utilized by ANR, it is consistent with the
IROC and we have no specific evidence to support modification or elimination of this approach from the CAP.
15
Bradford requests an order that it may cease groundwater monitoring in the event
there is sufficient data to demonstrate that contaminate levels are stable or declining. This
request is, at this time, based upon hypothetical facts. We will not issue an advisory opinion
based upon hypothetical facts. In re All Metals Recycling, Inc., No. 171-11-11 Vtec, slip op. at 8
n.5 (Vt. Super. Ct. Envtl. Div. Apr. 23, 2012) (Walsh, J.). While the monitoring program can be
reviewed and adjusted over time, at this time it cannot be eliminated at some specific future
date. Similarly, we leave ANR’s assertion that monitoring must continue until enforcement
standards are satisfied for future consideration once there is sufficient data to reliably predict
the status and nature of contamination.
The IROC states that “long term monitoring is a sufficient method of managing a site
until it established that the natural processes of dilution, dispersion, degradation, or other
mechanism(s) will reduce contaminant concentrations to levels that no longer exceed
applicable standards, and no longer are an unacceptable risk to sensitive receptors.” (IROC, Ex.
ANR-4 at 31). The use of land use controls, including the groundwater reclassification, is
intended to eliminate any unacceptable risk to humans as sensitive receptors. Thus, with those
controls in place and use of the groundwater prohibited, it is not clear that the VGES would still
be “applicable.” We conclude, however, that at this time Bradford’s and ANR’s disagreement
over the future end date is not appropriate for judicial determination as the Court has no facts
to base its decision on. See Parker v. Town of Milton, 169 Vt. 74, 77 (1998) (recognizing that
the judicial authority is limited to actual cases or controversies and not “mere speculat[ion]
about impact of some generalized grievance”). Bradford’s suggestion that under the revised
CAP it may be required to continue monitoring in excess of the time required under the
statutes, regulations, and the IROC is mere speculation and hypothesis.
Analytical Methodologies
The revised CAP requires analytical EPA Method 8021b and EPA Method 8270. ANR
selected these methods because they are the least costly methods capable of generating the
required data. Bradford proposes using EPA Method 8270d, a method with achieves a lower
detection limit, in place of EPA Method 8270, and EPA Method 8260b in place of EPA Method
8021b. ANR does not object to these substitutes. We conclude that Bradford may, at its
16
election and in a scientifically uniform manner, substitute EPA Method 8270d for Method 8270
and substitute EPA Method 8260b for Method 8021b.
ANR’s Cost Recovery
ANR seeks to recover its costs paid to The Johnson Company for site investigation and
analysis. ANR requested that Bradford perform additional site investigation work and Bradford
failed to timely do so. As a result, ANR retained The Johnson Company to do the additional
work. ANR offers that The Johnson Company’s work was necessary to understanding the Site
and contamination and to evaluate the potential impacts to public health and the environment.
See 10 V.S.A. § 6615(a)(4)(B). ANR paid $38,227.96 to The Johnson Company and Bradford
does not dispute this amount or its reasonableness. ANR additionally request that prejudgment
interest of 12% per annum be added to this cost. Prejudgment interest is typically awarded as
of right when damages are liquidated or reasonably certain. Birchwood Land Co., Inc. v.
Ormond Bushey & Sons, Inc., 2013 VT 60, ¶ 23, 194 Vt. 478; See V.R.C.P. 54(a) (“In an action
where monetary relief is awarded, the amount of the judgment shall include the principal
amount found to be due [and] all interest accrued on that amount up to and including the date
of entry of judgment . . . .”). ANR payments to The Johnson Company are summarized in Exhibit
ANR-19. Attached as Appendix 1 of ANR’s Proposed Finding of Fact and Post-Trial
Memorandum is ANR’s calculation of Prejudgment interest through July 31, 2-14.
Bradford does not oppose ANR’s request for cost recovery or request for prejudgment
interest. We therefore conclude that ANR’s costs paid to The Johnson Company are reasonable
and Bradford shall reimburse ANR the $38,227.96 plus prejudgment interest of 12% per annum.
Within 7 days of this Decision, ANR shall file an updated prejudgment interest calculation
showing accrued interest to the date of this decision. Within 30 days of ANR filing the updated
Prejudgment interest calculation, Bradford shall pay to ANR the $38,227.96 plus the full
prejudgment interest up to the date of this decision.
Conclusion
We conclude that the deed restrictions and Bradford’s obligation to pursue
reclassification of groundwater as described and set forth in Exhibit ANR-17B, Section 4.2.1 are
reasonable and necessary. Bradford shall provide ANR with separate proposed deed
17
restrictions within 60 days of this Order for the entire Site and the impacted portion of Clinton
Street. The Town shall cooperate in good faith with Bradford in developing the deed restriction
for Clinton Street. SRDC has agreed to the deed restrictions for the J&L property. Within 60
days of this Order, Bradford shall provide ANR with a draft petition to reclassify groundwater as
required by the CAP.
The Court also concludes that ANR’s well array consisting of the wells listed on pages 18
and 19 of the Revised CAP, Exhibit ANR-17B, and as depicted on Exhibit ANR 35, are necessary
and reasonable with the following modifications:
1. Wells GMW-2, GMW-4, MW-10S, JL-103, JL-4, MW-12, MW-13, MW-14, MW-6,
MW-9S, JL-101, MW-04-14, MW-04-16 remain as shown and described.
2. Wells NW-2 and NW-3 are eliminated.
3. NW-4 (NW-4S/4D) – Pursuant to the Stipulation between ANR and SRDC, this well is
to be relocated to facilitate the potential redevelopment of the SRDC property. The
new location is show on Exhibit ANR-35. This well will consist of a shallow well (NW-
4S) and a deep well (NW-4D).
We require Bradford to perform quarterly sampling, analysis, and reporting for the first
2 years and, based upon this data, Bradford may then make a formal request to modify the CAP
to reduce the number of wells to be sampled in the future. While ANR considers Bradford’s
request to modify the CAP, Bradford will be required to continue semi-annual sampling,
analysis, and reporting with sampling occurring in the late fall and late spring. Once Bradford
files a request to modify the CAP, ANR must respond in writing within 30 days, and thereafter,
Bradford will have 30 days to reply to ANR’s response. ANR must then issue a written decision
on Bradford’s request within 45 days; this decision would be appealable to this Court. The CAP
is otherwise unmodified with respect to sampling frequency, reporting, and requests for
modification of the CAP.
Bradford may, at its election and in a scientifically uniform manner, substitute EPA
Method 8270d for Method 8270 and substitute EPA Method 8260b for Method 8021b.
18
Bradford’s request that the Court order that it may cease groundwater monitoring if
there is sufficient data to demonstrate that contaminate levels are stable or declining is denied
at this time.
Bradford shall reimburse ANR the $38,227.96 paid to The Johnson Company plus
prejudgment interest of 12% per annum. Within 7 days of this Decision, ANR shall file an
updated prejudgment interest calculation showing accrued interest to the date of this decision.
Within 30 days of ANR filing the updated Prejudgment interest calculation, Bradford shall pay to
ANR the $38,227.96 plus the full prejudgment interest up to the date of this decision.
This concludes the matter before the Court. A Judgment Order accompanies this Merits
Decision.
Electronically signed on December 22, 2014 at 04:00 PM pursuant to V.R.E.F. 7(d).
_________________________________________
Thomas G. Walsh, Judge
Superior Court, Environmental Division