UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLUMBIA
UMC DEVELOPMENT, LLC, et al.,
Plaintiffs,
v. No. 13-cv-0899 (DLF)
DISTRICT OF COLUMBIA, et al.,
Defendants.
MEMORANDUM OPINION
Plaintiffs UMC Development, LLC, and Jacksophie GSCH, LLC, brought this suit in
2013 against the District of Columbia, its Mayor, and a Not-for-Profit Hospital Corporation
(NFPHC) created under D.C. law. Second Am. Compl. ¶¶ 9–13, Dkt. 88. According to UMC,
the District unlawfully foreclosed on land that UMC eventually expected to own and in which
UMC had made significant investments. Id. ¶¶ 2–6. UMC filed its latest complaint following a
series of D.C. and federal court proceedings. It alleges violations of the Takings Clause, the Due
Process Clause, and District of Columbia law, and it seeks, among other things, just
compensation for the taking of its alleged property and injunctive relief rescinding the
foreclosure and transferring title to the property to UMC. See id. ¶¶ 85–156. Before the Court
are two motions to dismiss filed by the District of Columbia and NFPHC. D.C.’s Mot., Dkt. 93;
NFPHC’s Mot., Dkt. 94. For the reasons that follow, the Court will grant the motions.
I. BACKGROUND
The Court divides its discussion of the factual and procedural background into two parts.
First, it discusses the formation of the relevant contractual relationships and the foreclosure that
ultimately prompted this lawsuit. Second, it summarizes the procedural history. In considering
the defendants’ motions to dismiss, the Court accepts as true all material allegations in the
complaint. See Muir v. Navy Fed. Credit Union, 529 F.3d 1100, 1105 (D.C. Cir. 2008).
A. The Facts
1. Greater Southeast Investments, L.P., Capitol Medical Center, LLC, and
Capitol Medical Center Realty
In 2007, the District of Columbia attempted to save a failing hospital in the Anacostia
neighborhood by contracting with, and providing funding to, a private company that would
acquire and rehabilitate the hospital. Second Am. Compl. ¶¶ 14–16, 20–21. To permit the
transfer of funds, the Council of the District of Columbia enacted the East of the River Hospital
Revitalization Emergency Amendment Act of 2007, which authorized the District to enter into a
limited-partnership agreement with Specialty Hospital of Washington-GSE Holdings, LLC
(SHW-GSE), a wholly owned subsidiary of Specialty Hospitals of America, LLC (SHA). Id.
¶¶ 19–22. The District, the sole limited partner, then provided $49 million in equity capital to
the partnership, which became known as Greater Southeast Investments, L.P. (GSI). Id. ¶ 22.
SHW-GSE served as the sole general partner. Id. ¶ 21.
The partnership agreement significantly limited the District’s authority over GSI’s
dealings. The District could not, for example, “take part in the operation, management, or
control of the Partnership [or] transact any business in the Partnership’s name.” D.C.’s Mot. Ex.
1 ¶ 5.2, at 12, Dkt. 93-1. But SHW-GSE’s authority over GSI was not unlimited either. Most
importantly, SHW-GSE could not “cause the Partnership to sell, transfer or otherwise dispose of
any property or assets in a single transaction or series of related transactions” without “obtaining
the prior written approval” of the District. Id. Ex. 1 ¶ 4.2, at 5.
Around the same time, SHW-GSE’s parent company, SHA, established two limited
liability companies to further its development plans. Second Am. Compl. ¶ 24. It created
2
Capitol Medical Center, LLC (CMC) to operate the hospital. And it created CMC Realty to own
the real property, including the land surrounding the hospital. Id.
On November 7, 2007, GSI loaned $49 million to CMC and CMC Realty after executing
a series of loan agreements and notes secured by a Deed of Trust. Id. ¶¶ 25, 27. The Deed of
Trust provided that GSI could foreclose on the secured property in the event that CMC or CMC
Realty defaulted. Id. ¶ 28; D.C.’s Mot. Ex. 2 ¶ 5.1(e), Dkt. 93-2. GSI and the two CMC
companies also executed an Acquisition Loan Agreement that prohibited the CMCs from
“[d]ispos[ing], convey[ing], transfer[ing], licens[ing] the use of, or encumber[ing], or
permit[ting] the conveyance, transfer or encumbrance of, any part of the Property” without GSI’s
“prior approval (which may be given or withheld in [its] sole and absolute discretion).” D.C.’s
Mot. Ex. 3 ¶ 11, Dkt. 93-3. It is undisputed that, together, these contracts prohibited the transfer
of any part of the relevant property without the District’s prior approval.
2. UMC Development, LLC
A few days before these contracts were executed, SHW-GSE contracted with Jacksophie
GSCH, LLC to form a joint venture—later named UMC Development, LLC—to acquire and
develop the land surrounding the hospital. Second Am. Compl. ¶ 30; D.C.’s Mot. Ex. 4, Dkt. 93-
4. CMC Realty also signed the Operating Agreement for the joint venture “for the purpose of
confirming its obligations under [the Agreement].” D.C.’s Mot. Ex. 4 at 25. The Operating
Agreement stated, “It is presently anticipated that CMC Realty . . . shall initially acquire title to
the [l]and upon the closing of the Asset Purchase Agreement.” Id. ¶ 3. It went on to state that
CMC Realty was to cooperate with Jacksophie to subdivide the property by obtaining multiple
assessment and tax lots from the D.C. Office of Tax and Revenue. Id. According to the
Operating Agreement, “promptly following [the] assignment of separate . . . lots . . ., SHW-GSE
and CMC [Realty] shall convey title to the [d]evelopment [l]ots to [UMC].” Id.
3
In the same paragraph, the Operating Agreement referenced the Acquisition Loan
Agreement that prohibited both CMC and CMC Realty from transferring “any part of the
[p]roperty” without the prior approval of GSI—and, by extension, the District. D.C.’s Mot. Ex.
3 ¶ 11; see also D.C.’s Br. at 3–4. The Operating Agreement stated that “CMC [Realty]
acknowledges that it is funding the acquisition of the [l]and pursuant to the terms and conditions
of the Acquisition Loan.” D.C.’s Mot. Ex. 4 ¶ 3. And it stated that Jacksophie and SHW-GSE
“acknowledge and agree that it is presently their intent in accordance with the terms and
provisions of the Acquisition Loan to have [UMC] construct buildings and other structures on
the [d]evelopment [l]and . . . for medical uses complimentary to the [h]ospital.” Id.
UMC immediately invested significant resources into developing the land surrounding
the hospital. Second Am. Compl. ¶¶ 37–46. For example, it obtained the District’s approval for
the creation of multiple tax lots, it engaged a company to help develop comprehensive
redevelopment plans, it signed a lease agreement and received rental payments, and it attempted
to finalize deals with other potential tenants. Id.
UMC and Jacksophie (collectively, the Developers) allege that the District participated in
weekly meetings about the progress of their work, id. ¶ 47, that it actively encouraged them to
continue their development activities, and that it “assured [the Developers] that the District’s
approval for transfer of title would promptly be forthcoming,” id. ¶ 48. “At no point prior to
[July 2010] did the District indicate to the Developers that it did not intend to approve the
transfer of title from CMC Realty to the Developers.” Id.
Yet when CMC Realty requested that the District approve the transfer in 2008, it
withheld its consent and “requested that the Developers provide it with additional information
about their development plans.” Id. ¶ 50. It also failed to provide its consent after the
4
Developers wrote to it in 2010 “to make sure that [it] was still aware . . . that SHW-GSE and
CMC Realty were contractually obligated to convey title to the development lots to Jacksophie.”
Id. ¶ 69 (internal quotation marks omitted). Indeed, the District “never formally responded to
CMC Realty’s request to transfer title to the [d]evelopment [l]and.” Id. ¶ 51.
3. The 2010 Foreclosure
Unfortunately, chronic mismanagement of the hospital led the District to conclude in
early 2010 that the hospital was in “imminent danger of financial insolvency.” Id. ¶ 65 (internal
quotation marks omitted). In April 2010, the District “unilaterally purported to declare a default
under the Deed of Trust,” alleging that the CMC companies “had failed to make required loan
payments in 2009, had failed to disclose material facts to GSI, had committed fraud against GSI,
and had made material misrepresentations to GSI.” Id. ¶ 67. On June 3, 2010, the District filed a
Notice of Foreclosure that stated that the District was the “Holder of the Note” secured by the
Deed of Trust. Id. ¶ 72, 74–75. On July 9, 2010, the District purchased the hospital and land
“for a mere fraction of their actual market value” at a foreclosure auction at which it was the only
bidder. Id. ¶ 78–79.
According to the Developers, it is no surprise that the District was the only bidder in light
of the participation requirements that the District itself imposed. Id. For example, all bidders
other than the District had to post a $1,000,000 deposit subject to forfeiture “in the event a final
settlement did not occur within thirty days.” Id. ¶ 78(a). The District also reserved the right to
block any sale and retain the purchaser’s deposit if, “at any point prior to settlement,” the
purchaser failed to demonstrate its ability to operate the hospital “on terms satisfactory” to the
District. Id. ¶ 78(b) (internal quotation marks omitted). And the District “indicated that it would
announce entirely new transactional terms—known only to the District—at the auction itself.”
Id. ¶ 78(c). The parties do not dispute, at least at this stage, that GSI, not the District, was the
5
holder of the note, and that the District had no authority under the GSI partnership agreement (or
otherwise) to unilaterally foreclose on the hospital and the land. See id. ¶ 75–76.
Three days after the foreclosure sale, the District transferred the purchased assets to
NFPHC, an instrumentality of the District that was created through the enactment of the Not-for-
Profit Hospital Corporation Establishment Emergency Act of 2010. Id. ¶¶ 13, 80.
B. Procedural History
This is not the first time the facts of this case have been litigated. There have been at
least six lawsuits related to the D.C. hospital. Omnibus Order on Summ. J., Capital Behavioral
Health, LLC v. District of Columbia, No. 2011 CA 9881B (D.C. Super. Ct. Apr. 11, 2014),
NFPHC’s Mot. Ex. H at 9, Dkt. 94-9. For example, just before the date of the foreclosure
auction, the CMC companies sued the District in D.C. Superior Court and moved for a temporary
restraining order to prevent the foreclosure. That motion was denied on July 6, 2010, Order,
CMC Realty, LLC v. Capitol Medical Cent., LLC, No. 2010 CA 4571B (D.C. Super. Ct. July 6,
2010), D.C.’s Mot. Ex. 5, Dkt. 93-5, and the CMCs eventually settled their claims against the
District, see Joint Notice and Stipulation of Dismissal, CMC Realty, LLC v. District of Columbia,
No. 2010 CA 4571B (filed Nov. 10, 2011). It is undisputed that UMC failed to intervene in that
litigation or to otherwise challenge the foreclosure.
On May 31, 2013, the Developers filed this lawsuit against the District and its Mayor in
D.C. Superior Court. UMC Dev., LLC v. District of Columbia, 982 F. Supp. 2d 13, 15 (D.D.C.
2013). They alleged, among other things, wrongful foreclosure, breach of contract, unjust
enrichment, and violations of the Due Process Clause and the Takings Clause. Id. After the
defendants removed the case to this Court, the previously assigned judge declined to exercise
supplemental jurisdiction over the D.C. claims, remanded those claims to D.C. Superior Court,
and severed and dismissed without prejudice the two constitutional claims. Id. at 20–21. The
6
Developers then filed an amended complaint in this Court that reasserted their constitutional
claims against the District, its Mayor, and NFPHC, First Am. Compl., Dkt. 33, and the Court
stayed the proceedings pending resolution of the D.C. claims, Dec. 5, 2013 Order, Dkt. 45.
Both the D.C. Superior Court and the D.C. Court of Appeals held that the Developers
lacked standing to prosecute their D.C. claims, all of which derived from the District’s
foreclosure. UMC Dev., LLC v. District of Columbia, 120 A.3d 37, 39 (D.C. 2015). The D.C.
Court of Appeals reasoned that “UMC Development’s interest (and by extension Jacksophie’s
interest) [in the land] was a contingent future interest that could not mature into an actual present
interest without the District’s consent to the transfer of title from CMC Realty to the developers.”
Id. at 45. It then explained that it could not “trace the developers’ loss of their contingent future
interest to the foreclosure.” Id. Instead, the Developers lost their interest because “the District
never consented to transfer title to the developers.” Id. It stressed that, “[e]ven after the
foreclosure, the District still could have” “given UMC Development title directly.” Id. The D.C.
Court of Appeals reversed the Superior Court only “to the extent that [its] order dismissed the
developers’ claims with prejudice,” id. at 49, because the standing “defect” was “one of subject
matter jurisdiction” and “[s]uch defects may only result in a dismissal without prejudice,” id. at
48.
Returning to this Court, the developers moved to file a second amended complaint. Mot.
for Leave to File Second Am. Compl., Dkt. 62. The undersigned was then assigned to the case
and granted the motion over objection. Feb. 1, 2018 Minute Order. The Second Amended
Complaint now seeks declaratory and injunctive relief as well as damages based on nine counts:
a Due Process Clause violation, a Takings Clause violation, wrongful foreclosure, specific
performance of the UMC Development Operating Agreement, tortious interference with
7
prospective economic advantage, third-party breach of the GSI partnership agreement, unjust
enrichment, constructive trust, and quantum meruit. Second Am. Compl. ¶¶ 85–156. As in their
previous complaints, all of the Developers’ claims derive from, in the words of the Developers,
“the District’s wrongful foreclosure on the [hospital] and its surrounding real property . . . and
the improprieties that tainted those proceedings.” Id. ¶ 1. NFPHC and the District, on behalf of
itself and its Mayor, have since filed separate motions to dismiss on a variety of grounds,
including lack of jurisdiction.
II. LEGAL STANDARD
A court must dismiss a complaint under Federal Rule of Civil Procedure 12(b)(1) if it
lacks subject matter jurisdiction. See Fed. R. Civ. P. 12(b)(1), (h). As the party invoking federal
jurisdiction, the plaintiff bears the burden of establishing jurisdiction, including standing to sue
and supplemental jurisdiction. Spokeo v. Robins, 136 S. Ct. 1540, 1547 (2016). At the pleading
stage, a court must “accept all of the factual allegations in the complaint as true,” Jerome Stevens
Pharm., Inc. v. FDA, 402 F.3d 1249, 1253 (D.C. Cir. 2005) (alteration adopted and internal
quotation marks omitted), and it must construe the complaint “with sufficient liberality to afford
all possible inferences favorable to the pleader on allegations of fact,” Settles v. U.S. Parole
Comm’n, 429 F.3d 1098, 1106 (D.C. Cir. 2005). But to assure itself of jurisdiction, the court
may also “consider . . . undisputed facts evidenced in the record” and even “undisputed facts plus
the court’s resolution of disputed facts.” Coal. for Underground Expansion v. Mineta, 333 F.3d
193, 198 (D.C. Cir. 2003) (internal quotation marks omitted).
III. ANALYSIS
The Court divides its analysis into two parts. First, it explains that the Developers’
federal claims fail for lack of jurisdiction. Second, it explains that issue preclusion bars
8
consideration of their D.C. claims and even if it did not, the Court would decline to exercise
supplemental jurisdiction over them.
A. The Federal Claims
Under Article III of the Constitution, federal courts may decide only “Cases” and
“Controversies.” U.S. Const. art. III. The familiar doctrine of standing “gives meaning to these
constitutional limits by identifying those disputes which are appropriately resolved through the
judicial process.” Susan B. Anthony List v. Driehaus, 573 U.S. 149, 157 (2014) (alteration
adopted and internal quotation marks omitted). It “serves to prevent the judicial process from
being used to usurp the powers of the political branches and confines the federal courts to a
properly judicial role.” Spokeo, 136 S. Ct. at 1547 (internal quotation marks and citations
omitted).
As the party invoking federal jurisdiction, the plaintiff bears the burden of establishing
the “irreducible constitutional minimum” of standing. Id. (internal quotation marks omitted).
Specifically, the plaintiff must demonstrate that it has “(1) suffered an injury in fact, (2) that is
fairly traceable to the challenged conduct of the defendant, and (3) that is likely to be redressed
by a favorable judicial decision.” Id. At the pleading stage, “the plaintiff must clearly allege
facts demonstrating each element.” Id. (alteration adopted and internal quotation marks
omitted). Moreover, because “standing is not dispensed in gross,” “a plaintiff must demonstrate
standing for each claim he seeks to press and for each form of relief that is sought.” Town of
Chester v. Laroe Estates, Inc., 137 S. Ct. 1645, 1650 (2017) (internal quotation marks omitted).
The Developers argue that the District violated the Takings Clause and the Due Process
Clause of the Fifth Amendment. The Court will address each argument in turn.
9
1. The Takings Claim
The Takings Clause of the Fifth Amendment, which applies to the States through the
Fourteenth Amendment, Phillips v. Washington Legal Found., 524 U.S. 156, 163 (1998),
provides that “private property” shall not “be taken for public use, without just compensation,”
U.S. Const. amend. V. To establish standing to sue under the Clause, a plaintiff must have a
protected property interest in the relevant property. Rumber v. District of Columbia, 595 F.3d
1298, 1300–01 (D.C. Cir. 2010) (per curiam) (holding that the lack of a property interest
deprives a plaintiff of standing to bring a takings claim); see also id. (“The property-owning
businesses, not their employees or stakeholders, are the proper parties to bring suit opposing
condemnation.”). Because the Constitution does not create property interests, courts must look
to “existing rules or understandings that stem from an independent source such as state law” to
determine whether a protected property right exists. Webb’s Fabulous Pharmacies, Inc. v.
Beckwith, 449 U.S. 155, 161 (1980) (internal quotation marks omitted); see also Lucas v. S.C.
Coastal Council, 505 U.S. 1003, 1030 (1992). “[A] mere unilateral expectation or an abstract
need is not a property interest entitled to protection.” Webb’s Fabulous Pharmacies, 449 U.S. at
161.
The Developers maintain that they are entitled to “just compensation” for the District’s
“uncompensated taking of private land for public use.” Second Am. Compl. ¶ 95. They allege
that they had “rightful ownership of the [d]evelopment [l]and,” id. ¶ 96, and were “entitled to
hold fee simple title to the [d]evelopment [l]and,” id. ¶ 98. They also allege that Jacksophie “had
formed a reasonable, investment-backed expectation that it would derive fair returns from its
investments in the [d]evelopment [l]and.” Id. ¶ 97. None of these allegations withstand
scrutiny.
10
The “dimensions” of the Developers’ property interest are defined by reference to state
law, Roth v. King, 449 F.3d 1272, 1284 (D.C. Cir. 2006) (internal quotation marks omitted), and
the D.C. courts have already ruled that the Developers did not have “rightful ownership” of the
land, Second Am. Compl. ¶ 96. They had only a “contingent future interest that could not
mature into an actual present interest without the District’s consent to the transfer of title from
CMC Realty to the developers.” UMC Dev., 120 A.3d at 45.
Whether this contingent future interest amounts to a constitutionally protected property
interest is a question of federal law. See Roth, 449 F.3d at 1285; see also Foggy Bottom Ass’n v.
D.C. Office of Planning, 441 F. Supp. 2d 84, 89 n.3 (D.D.C. 2006) (“A property interest is the
same under the Fifth Amendment due process clause as under the Fifth Amendment takings
clause.”). As the Ninth Circuit has explained, “the relevant inquiry [under the Takings Clause] is
the certainty of one’s expectation in the property interest at issue.” Engquist v. Oregon Dep’t of
Agric., 478 F.3d 985, 1002 (9th Cir. 2007), aff’d on other grounds, 553 U.S. 591 (2008). That is
why interest on a principal is generally considered protected property. Webb’s Fabulous
Pharmacies, 449 U.S. at 161, 164–65 (interest on interpleader funds); Phillips, 524 U.S. at 159–
60 (interest on client funds held by an attorney in connection with the practice of law). In
Webb’s Fabulous Pharmacies, for example, the Supreme Court held that interest on interpleader
funds deposited in the registry of a county court was the protected property of creditors. In so
holding, it stressed “[t]he usual and general rule . . . that any interest on [a] fund follows the
principal and is to be allocated to those who are ultimately to be the owners of that principal.”
Webb’s Fabulous Pharmacies, 449 U.S. at 162. And it explained that the creditors there “had
more than a unilateral expectation.” Id. at 161.
11
On the other hand, the Supreme Court has ruled in the context of government
entitlements that “a benefit is not a protected entitlement if government officials may grant or
deny it in their discretion” because “[t]o have a property interest in a benefit, a person clearly
must have more than an abstract need or desire and more than a unilateral expectation of it”;
“[h]e must, instead, have a legitimate claim of entitlement to it.” Town of Castle Rock v.
Gonzales, 545 U.S. 748, 756 (2005) (internal quotation marks omitted). Following this
guidance, the D.C. Circuit has held that an order changing the government payment eligibility of
certain attorneys appointed to represent indigent clients did not implicate a protected property
right. Roth, 449 F.3d at 1285–86. It explained that the attorneys’ “desires for compensated
appointments amount to nothing more than ‘expectations,’ not ‘entitlements’” because there was
never “a statute or rule, or even a practice, securing to attorneys a right to compensated [court]
appointments.” Id. at 1285. Similarly, the D.C. Circuit has explained in the land-use context,
that whether zoning-related decisions implicate a protected property interest depends on
“whether the [relevant] statute or regulation places substantial limits on the government’s
exercise of its licensing discretion.” George Washington Univ. v. District of Columbia, 318 F.3d
203, 207 (D.C. Cir. 2003) (internal quotation marks omitted).
This case law demonstrates that whether a protected property interest exists turns on “the
certainty of the plaintiff’s expectation that [it] would receive the property.” Engquist, 478 F.3d
at 1004. In this case, the Developers’ interest, which was wholly dependent on a particular
exercise of the District’s discretion, was too contingent to create an entitlement worthy of
constitutional protection. The Developers had only a “unilateral expectation” that they would
receive title, and unfortunately for them, “a mere unilateral expectation . . . is not a property
interest entitled to protection.” Webb’s Fabulous Pharmacies, 449 U.S. at 161.
12
Finally, to the extent the Developers seek to establish a property interest on the basis of
their “investment-backed expectation,” they confuse the question whether a plaintiff has a
cognizable property interest with the question whether the government has taken that property
interest. See, e.g., Ruckelshaus v. Monsanto Co., 467 U.S. 986, 1000 (1984) (distinguishing two
questions: “(1) Does [the plaintiff] have a property interest protected by the Fifth Amendment’s
Taking Clause . . .?” and “(2) If so, does [the government’s] use of the [alleged property] effect a
taking of that property interest?”); see also Full Value Advisors, LLC v. SEC, 633 F.3d 1101,
1109 (D.C. Cir. 2011) (similar). In the context of regulatory takings, courts consider several
factors, including whether a government action “interfere[d] with reasonable investment-backed
expectations,” to determine whether there has been a compensable taking of an already
established property interest. Ruckelshaus, 467 U.S. at 1005 (internal quotation marks omitted).
In other words, the existence of a “reasonable investment-backed expectation” does not create a
property interest; it merely weighs in the analysis of whether the government has taken an
established property interest. The Court declines to convert the Developers’ investment-backed
hope of realizing some future profit into a constitutionally protected property interest.
2. The Due Process Claim
The Developers’ due process claim fares no better. The Due Process Clause of the Fifth
Amendment provides that no person shall “be deprived of life, liberty, or property, without due
process of law.” U.S. Const. amend. V. To establish a cognizable injury in fact, “a plaintiff
must show that he or she suffered an invasion of a legally protected interest that is concrete and
particularized and actual or imminent, not conjectural or hypothetical.” Spokeo, 136 S. Ct. at
1548 (internal quotation marks omitted). To be “particularized,” the injury must be “personal,
individual, distinct, and differentiated—not generalized or undifferentiated.” Pub. Citizen, Inc.
v. Nat’l Highway Traffic Safety Admin., 489 F.3d 1279, 1292 (D.C. Cir. 2007).
13
To establish redressability, a plaintiff must show that it is “likely, as opposed to merely
speculative, that [the] injury will be redressed by a favorable decision.” U.S. Ecology, Inc. v. U.S.
Dep’t of Interior, 231 F.3d 20, 24 (D.C. Cir. 2000) (alteration adopted and internal quotation
marks omitted). When applying this standard, “[c]ourts have been loath to find standing when
redress depends largely on policy decisions yet to be made by government officials.” Id. at 24.
“When redress depends on the cooperation of a third party, ‘it becomes the burden of the
appellant to adduce facts showing that those choices have been or will be made in such manner
as to produce causation and permit redressability of injury.’” Id. at 24–25 (alteration adopted)
(quoting Lujan v. Defs. of Wildlife, 504 U.S. 555, 562 (1992)).
The Developers argue that the District violated the Due Process Clause by issuing a
“deficient” notice that misrepresented the District’s authority to foreclose, Second Am. Compl.
¶ 87, and by “rigg[ing]” the foreclosure sale to “favor the District and to deny innocent holders
of legitimate interests in the [d]evelopment [l]and their just due,” id. ¶ 88. Because of these
actions, the Developers allegedly “lost (1) their right to earn rental income and other returns from
the [l]and; (2) their substantial investments and development plans for the [l]and; (3) their
property interest in obtaining title to the [l]and; and (4) the opportunity to participate in the
foreclosure auction and receive their share of any surplus from the auction.” Pl.’s Opp’n at 13,
Dkt. 96. To remedy this harm, they contend that the foreclosure should be “set aside” and the
Developers’ “preexisting rights . . . reinstated.” Second Am. Compl. ¶ 93. These injuries fail to
establish standing.
Even assuming the first three asserted injuries are cognizable injuries in fact, the Court
cannot remedy them by setting aside the foreclosure and reinstating the Developers’ “preexisting
rights.” Id. ¶ 93. To be sure, the Developers expected to receive title to the land, and they
14
invested significant time and money based on that expectation. But “disappointment at having
invested—and perhaps lost—time and money in [a] proposed project, without more, is not
enough to establish standing.” Miami Bldg. & Const. Trades Council, AFL/CIO v. Sec’y of Def.,
493 F.3d 201, 206 (D.C. Cir. 2007) (internal quotation marks omitted). The contracts alleged in
the Second Amended Complaint required the District to consent to any transfer of title, and the
District never provided that consent—despite multiple requests and reminders to do so. It
follows that, even if the Court were to “set aside” the foreclosure, the District would still have
the right not to permit the transfer of any property interest and thus to thwart UMC’s ability to
obtain title and realize any profit.
According to the Developers, the District assured them that it would transfer title to the
land, and “[i]t is surely reasonable to assume that the government will keep its word.” Pl.’s
Opp’n at 22. But the Developers concede that the District “had yet to approve the transfer at the
time of the foreclosure.” Id. at 21. And although they, at times, suggest that the District had a
“legal obligation[]” to permit the transfer, id. at 22, they do not sufficiently explain “how, or
under what theory, [they] would be entitled” to compel the District to exercise its discretion in
that way. U.S. Ecology, 231 F.3d at 25 (internal quotation marks omitted). At most, the
Developers cite general duties of good faith and fair dealing and an exhibit to the GSI
partnership agreement providing, “Upon request and subject to the approval rights of the
[g]eneral [p]artner and [l]imited [p]artner, the [p]artnership will release from the lien any portion
of the [p]roperty required to make . . . [a]dditional [d]evelopment financeable, such approval not
to be unreasonably withheld.” D.C.’s Mot. Ex. 1 ¶ 8.1, at 22; see also Pl.’s Opp’n at 37. This
provision, however, does not plausibly strip the District of its substantial discretion under ¶ 4.2
of the agreement to refuse to provide its “prior written approval” for the transfer of any property.
15
D.C.’s Mot. Ex. 1 ¶ 4.2, at 5. And the Developers’ failure to allege a plausible, legally
enforceable right to obtain the District’s consent is particularly problematic in light of the D.C.
Circuit’s admonishment that courts should be reluctant to “find standing when redress depends
largely on policy decisions yet to be made by government officials.” U.S. Ecology, 231 F.3d at
24; see also Miami Bldg., 493 F.3d at 205. Without more, the Court cannot conclude that it is
“likely, as opposed to merely speculative, that [the Developers’] injur[ies] will be redressed by a
favorable decision.” U.S. Ecology, 231 F.3d at 24 (alteration adopted and internal quotation
marks omitted).
Apart from their alleged loss of rental income, investments, and an interest in obtaining
title, the Developers also allege that they were deprived of “the opportunity to participate in the
foreclosure auction and receive their share of any surplus from the auction.” Pl.’s Opp’n at 13.
This theory, too, fails. As a threshold matter, the Developers were not entitled to any surplus
from the auction because they did not own the property. And as for the “opportunity to
participate in the foreclosure auction,” the Developers have failed to allege more than “a
generally available grievance about government.” Hollingsworth v. Perry, 570 U.S. 693, 706
(2013) (internal quotation marks omitted). It is well established that “[a] litigant raising only a
generally available grievance about government—claiming only harm to his and every citizen’s
interest in proper application of the Constitution and laws, and seeking relief that no more
directly and tangibly benefits him than it does the public at large—does not state an Article III
case or controversy.” Id. (internal quotation marks omitted). Divorced from the Developers’
alleged loss of investments and the other harms discussed above, the alleged loss of the
opportunity to participate in the foreclosure is simply “an asserted right to have the Government
16
act in accordance with law,” which is “not sufficient, standing alone, to confer jurisdiction on a
federal court.” Allen v. Wright, 468 U.S. 737, 754 (1984).
To be sure, the loss of the opportunity to compete or to pursue a benefit can be a
cognizable injury in fact. See CC Distributors, Inc. v. United States, 883 F.2d 146, 149–51 (D.C.
Cir. 1989). But to prevail under that theory of standing, the plaintiff must show that it was “able
and ready” to participate in the challenged event, here the foreclosure auction. Ne. Fla. Chapter
of Associated Gen. Contractors of Am. v. City of Jacksonville, 508 U.S. 656, 666 (1993); see also
Settles, 429 F.3d at 1102 (parolee established injury in fact from denial of opportunity to have a
representative at his parole hearing because he submitted a “declaration that had he been allowed
to take a representative to his parole hearing, he would have made arrangements to obtain one
and he believed that he would have been successful.” (alterations and internal quotation marks
omitted)). The Developers have not satisfied that standard here. There is no indication in the
record that the Developers ever expressed an interest in participating in the foreclosure, and they
chose not to intervene in a lawsuit challenging the foreclosure sale in advance. Cf. U.S.
AirWaves, Inc. v. FCC, 232 F.3d 227, 232 (D.C. Cir. 2000) (plaintiff established that it was
“ready, willing, and able” to bid in a government auction, in part because it “submitted bids in
the original . . . auction but dropped out before securing any licenses” (internal quotation marks
omitted)). On this record, the Court cannot conclude that the Developers’ interest was
sufficiently particularized to set it apart from all other citizens who share a generalized interest in
their government following legally mandated procedures. 1
1
The Developers also appear to be precluded from relitigating this standing theory. The same
theory was raised and contested by the same parties before the D.C. Court of Appeals; that court
rejected their argument for the same reason—they had alleged only a “generalized grievance”
that was insufficient to support standing, UMC Dev., 120 A.3d at 46 n.27—and applying issue
17
In any event, to bring a claim under either the procedural or substantive components of
the Due Process Clause, a plaintiff must establish a protected property interest. See Roberts v.
United States, 741 F.3d 152, 161 (D.C. Cir. 2014) (procedural due process claim); George
Washington Univ., 318 F.3d at 206 (substantive due process claim); see also Hettinga v. United
States, 677 F.3d 471, 479–80 (D.C. Cir. 2012) (affirming the dismissal of a due process claim for
failure to state a claim under Federal Rule of Civil Procedure 12(b)(6) where the plaintiffs failed
to establish a cognizable liberty or property interest). And “[a] property interest is the same
under the Fifth Amendment due process clause as under the Fifth Amendment takings clause.”
Foggy Bottom Ass’n, 441 F. Supp. 2d at 89 n.3; see also Roth, 449 F.3d at 1286. It follows that
the same failure to allege a protected property interest under the Takings Clause also dooms the
developers’ due process claim. The Court will therefore dismiss the Developers’ two federal
claims.
B. The D.C. Claims
The Court will also dismiss the Developers’ D.C. claims. First, the doctrine of issue
preclusion bars consideration of those claims. Second, even if issue preclusion does not apply,
the Court would decline to take supplemental jurisdiction over the claims.
1. Issue Preclusion
The doctrine of issue preclusion bars relitigation when “(1) the same issue was contested
by the parties and submitted for judicial determination in a prior case, (2) the issue was actually
preclusion would not work a basic unfairness to the Developers, who were fully incentivized to
litigate the theory before the D.C. Court of Appeals, see Canonsburg Gen. Hosp. v. Burwell, 807
F.3d 295, 301, 306 (D.C. Cir. 2015). As will be discussed, the doctrine of issue preclusion
applies to standing decisions of the D.C. Court of Appeals. See Scahill v. District of Columbia,
909 F.3d 1177, 1181–82 (D.C. Cir. 2018).
18
and necessarily determined by a court of competent jurisdiction in that prior case, and (3)
preclusion does not result in basic unfairness to the party bound by the first determination.”
Scahill, 909 F.3d at 1181 (alteration and internal quotation marks omitted). The D.C. Circuit has
explained that the doctrine serves the important goals of “protect[ing] against the expense and
vexation attending multiple lawsuits, conserv[ing] judicial resources, and foster[ing] reliance on
judicial action by minimizing the possibility of inconsistent decisions.” Nat’l Ass’n of Home
Builders v. EPA, 786 F.3d 34, 41 (D.C. Cir. 2015) (alteration and internal quotation marks
omitted).
There can be little doubt that the doctrine applies here. The parties contested the
Developers’ standing to bring the same seven D.C. claims before the D.C. courts, and the issue
was submitted for judicial determination. See generally UMC Dev., 120 A.3d. 37. The D.C.
Court of Appeals actually and necessarily decided that the Developers lacked standing, and to
decide that question, it “look[ed] to federal standing jurisprudence.” Id. at 42; see also id. at 47–
48; Scahill, 909 F.3d at 1181 (applying the doctrine of issue preclusion to a standing decision by
the D.C. Court of Appeals on a D.C. claim). Finally, applying the preclusion doctrine here does
not result in basic unfairness to the Developers because they were “on notice” that they had to
establish standing before the D.C. Court of Appeals, and they “had the same incentives to litigate
this standing issue before the D.C. Court of Appeals where [they] w[ere] challenging the same”
foreclosure at issue here. Scahill, 909 F.3d at 1182.
The Developers do not dispute that they seek to pursue the very same claims that the D.C.
courts considered in the previous proceeding. Instead, they argue that they should nevertheless
be allowed to proceed with their claims for three reasons. None are persuasive.
19
First, the Developers invoke the curable defect doctrine, arguing that new factual
allegations in their Second Amended Complaint cure the defect identified by the D.C. courts.
Pl.’s Opp’n at 23–24. It is true that the “curable defect exception allows relitigation of
jurisdictional dismissals when a precondition requisite to the court’s proceeding with the original
suit was not alleged or proven, and is supplied in the second suit.” Nat’l Ass’n of Home
Builders, 786 F.3d at 41 (internal quotation marks omitted). But the doctrine applies “only if a
material change following dismissal cured the original jurisdictional deficiency.” Id. A prior
court’s decision “cannot be used as a mere instruction manual on how [a plaintiff] might correct
defects in its claim of standing by doing a better job of pleading preexisting facts and arguing the
law more forcefully in a new case.” Id. at 43. The Developers here have not alleged a single
fact that postdates the D.C. proceedings. As a result, they cannot benefit from the curable defect
doctrine. 2
Second, the Developers argue that issue preclusion does not apply because their D.C.
complaint was dismissed “without prejudice” and “there has been no valid, final judgment on the
merits.” Pl.’s Opp’n at 24 (internal quotation marks omitted). But only claim preclusion, not
issue preclusion, requires a “final, valid judgment on the merits.” Nat. Res. Def. Council v. EPA,
513 F.3d 257, 260 (D.C. Cir. 2008). As the D.C. Circuit has explained, a “jurisdictional
dismissal does not involve an adjudication on the merits,” but it still “adjudicate[s] the court’s
2
The Court rejects the Developers’ suggestion that, because it granted the Developers leave to
amend their complaint in a minute order, issue preclusion cannot apply under the law of the case
doctrine. Pl.’s Opp’n at 23–24. The Court ruled only that the Developers had made a sufficient
showing under Federal Rule of Civil Procedure 15(a)(2) to warrant leave to amend because the
motion to amend raised complex issues and the interests of justice were best served by resolving
the issues raised with the benefit of full briefing. See Feb. 1, 2018 Minute Order; see also
Firestone v. Firestone, 76 F.3d 1205, 1208 (D.C. Cir. 1996) (“[I]t is an abuse of discretion to
deny leave to amend unless there is sufficient reason.”).
20
jurisdiction, and a second complaint cannot command a second consideration of the same
jurisdictional claims.” Nat’l Ass’n of Home Builders, 786 F.3d at 41 (internal quotation marks
omitted); see also id. (“Issue preclusion applies to threshold jurisdictional issues like standing.”).
Finally, the Developers argue that they did not have “a full and fair opportunity for
litigation of the relevant issues” because the “threshold dismissal by the D.C. courts was
unaccompanied by any hearing, any opportunity for leave to amend, and any development of a
factual record.” Pl.’s Opp’n at 25 (internal quotation marks omitted). There are only three
equitable exceptions to issue preclusion. Those exceptions apply when there has been “an
intervening change in controlling legal principles,” when a “party to be bound lacked an
incentive to litigate in the first trial, especially in comparison to the stakes of the second trial,”
and when “the prior proceedings were seriously defective.” Canonsburg Gen. Hosp., 807 F.3d at
306 (internal quotation marks omitted); see also id. (“There is no general public policy exception
to the operation of res judicata.” (internal quotation marks omitted)). Only the third exception
for a “seriously defective” proceeding has any relevance to the Developers’ argument, and that
exception requires a far more substantial showing than the Developers have made here. Indeed,
they have failed to show how the proceedings in the D.C. courts were defective, let alone
seriously defective. A hearing was unnecessary then (as now) because there were no facts in
dispute. And the Developers’ own litigation strategy is largely to blame for their other concerns.
As the D.C. Court of Appeals explained, “[I]n the four months that the District’s motion to
dismiss was pending in Superior Court . . ., the developers never asked to submit further briefing
on the issue of standing or for an evidentiary hearing.” UMC Dev., 120 A.3d at 44 n.23. They
also failed to “seek reconsideration . . . and ask for a hearing in conjunction with that motion.”
21
Id. The Developers may not subject the defendants and the courts to endless rounds of litigation
simply because they are dissatisfied with the first decision they received.
2. Supplemental Jurisdiction
Under 28 U.S.C. § 1367(a), district courts have “supplemental jurisdiction over all . . .
claims that are so related to claims in the action within [their] original jurisdiction that they form
part of the same case or controversy under Article III.” District courts may, however, “decline to
exercise supplemental jurisdiction over a claim” if “the claim raises a novel or complex issue of
State law,” it “substantially predominates over the claim or claims over which the district court
has original jurisdiction,” or “in exceptional circumstances, there are other compelling reasons
for declining jurisdiction.” Id. § 1367(c). Supplemental jurisdiction “is a doctrine of discretion,
not a plaintiff’s right.” Shekoyan v. Sibley Int’l, 409 F.3d 414, 423 (D.C. Cir. 2005) (quoting
United Mine Workers v. Gibbs, 383 U.S. 715, 726 (1966)). Courts must “consider and weigh in
each case . . . the values of judicial economy, convenience, fairness, and comity in order to
decide whether to exercise [supplemental] jurisdiction.” Carnegie-Mellon Univ. v. Cohill, 484
U.S. 343, 350 (1988). Typically, if “all federal-law claims are dismissed before trial, the balance
of factors . . . will point toward declining to exercise jurisdiction over the remaining state-law
claims.” Shekoyan, 409 F.3d at 424.
Even if the doctrine of issue preclusion did not bar consideration of the Developers’ D.C.
claims, the Court would decline to exercise supplemental jurisdiction. First, as the previously
assigned judge explained when she granted the Developers’ original motion to remand, the D.C.
claims predominate over the federal claims. The Developers’ “D.C. claims are four times as
numerous as their federal claims, and provide a far broader basis for relief.” UMC Dev., 982 F.
Supp. 2d at 20. They “present contract, property, tort, fiduciary duty, and equitable theories,
whereas the two federal claims invoke relatively narrow grounds for relief under the Fifth
22
Amendment.” Id. Second, the state law questions are novel and complex. They involve a web
of contracts between private and public entities, the rights of NFPHC, “a special governmental
instrumentality with its own authorizing legislation under the D.C. Code,” id., and difficult
questions of sovereign immunity and entitlement to equitable relief, id. at 20–21. Third, the state
law questions “implicate distinctly local policy interests, and may affect the District’s ability to
enter into similar public-private ventures in the future.” Id. at 21. Finally, as noted, the Court
will dismiss both of the Developers’ federal claims, and this is not the unusual case in which the
D.C. claims should nevertheless be allowed to proceed—especially when the Developers
originally sought remand, Pl.’s Opp’n at 10, 44, and have had a full opportunity to litigate their
D.C. claims in the D.C. courts, see Araya v. JPMorgan Chase Bank, N.A., 775 F.3d 409, 417
(D.C. Cir. 2014) (“[W]e have repeatedly held that a district court abuses its discretion when it
maintains jurisdiction over a removed case presenting unsettled issues of state law after the
federal claims have been dismissed.”).
The Developers respond that “the D.C. state courts have made clear that they are
disinclined to adjudicate the Developers’ D.C.-law claims on the merits,” and “only this Court
can ever reach and adjudicate the weighty merits questions posed in this case.” Pl.’s Opp’n at
44–45. But like the doctrine of issue preclusion, the doctrine of supplemental jurisdiction does
not allow dissatisfied litigants to circumvent the rulings of other courts. Here, principles of
comity favor dismissal of the D.C. claims because the D.C. courts have already ruled on them.
The Court therefore declines to take supplemental jurisdiction over the claims. 3
3
No party has argued that the D.C. claims should be remanded instead of dismissed, and the
Court concludes that dismissal is appropriate here. See Edmondson & Gallagher v. Alban
Towers Tenants Ass’n, 48 F.3d 1260, 1267 (D.C. Cir. 1995) (“Whether to remand or dismiss is a
matter normally left to the discretion of the district court.”); see also Deppner v. Spectrum
23
CONCLUSION
For the foregoing reasons, the Court grants the District’s and NFPHC’s Motions to
Dismiss. An Order consistent with this decision accompanies this Memorandum Opinion.
________________________
DABNEY L. FRIEDRICH
United States District Judge
August 13, 2019
Health Care Res., 325 F. Supp. 3d 176, 191 (D.D.C. 2018) (dismissing state-law claims after
considering the § 1367(c) factors and observing that § 1367(d) minimizes the risk of prejudice to
the plaintiff by “provid[ing] for a thirty-day grace period for refiling in state court after
dismissal,” and “stop[ping] the clock on any otherwise-applicable limitations period during the
pendency of the federal-court suit”).
24