UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLUMBIA
CENTER FOR BIOLOGICAL
DIVERSITY, et al.,
Plaintiffs,
Case No. 1:19-cv-00408 (TNM)
v.
DONALD J. TRUMP, et al.,
Defendants.
RIO GRANDE INTERNATIONAL
STUDY CENTER, et al.,
Plaintiffs,
Case No. 1:19-cv-00720 (TNM)
v.
DONALD J. TRUMP, et al.,
Defendants.
MEMORANDUM OPINION
A year ago, the President asked Congress to allocate $5.7 billion to build 253 miles of
barriers along the Nation’s southern border. CBD Am. Compl. ¶ 93 (“CBD Compl.”), CBD ECF
No. 16; RGISC Am. Compl. ¶ 53 (“RGISC Compl.”), RGISC ECF No. 33. After extensive
negotiations and a 35-day Government shutdown, Congress responded by appropriating only
$1.375 billion in the 2019 Consolidated Appropriations Act to construct a wall in one sector of
the southern border. Pub. L. No. 116-6, div. A, 133 Stat. 13 (2019). The Administration then
turned to alternative sources of funding.
Plaintiffs—who include nonprofit organizations, residents along the southern border, and
the Carrizo/Comecrudo Nation of Texas—filed two lawsuits claiming that the Administration’s
alternative means of funding are unlawful. The Government moved to dismiss both cases under
Rules 12(b)(1) and 12(b)(6) of the Federal Rules of Civil Procedure. Defs.’ CBD Mot. Dismiss
(“Defs.’ CBD Mot.”), CBD ECF No. 22; Defs.’ RGISC Mot. Dismiss (“Defs.’ RGISC Mot.”),
RGISC ECF No. 34. The Court held joint oral argument on these motions and now addresses the
Government’s motions together. 1 For the reasons explained below, the Court will grant in part
and deny in part the Government’s Motions to Dismiss.
I. BACKGROUND
At the beginning of 2019, the Department of Homeland Security (“DHS”) started
reporting an “unprecedented” increase in illegal crossings along the United States’ southern
border. See Letter from Secretary of Homeland Security Kirstjen M. Nielsen to the U.S. Senate
and House of Representatives (Mar. 28, 2019), https://www.dhs.gov/sites/default/files/
publications/19_0328_Border-Situation-Update.pdf (“Nielsen Letter”). In 2018, DHS reported
“apprehending 50,000–60,000 migrants a month.” Id. But in February 2019, it “apprehended or
encountered more than 75,000, the highest in over a decade.” Id.
The rapid surge of migrants included an increase in “vulnerable populations.” Id.; see
also Press Release, U.S. Customs and Border Protection (“CBP”), CBP Releases Fiscal Year
2019 Southwest Border Migration Stats (Mar. 5, 2019),
https://www.cbp.gov/newsroom/national-media-release/cbp-releases-fiscal-year-2019-southwest-
border-migration-stats (reporting a 300% increase in 2019 of the number of family units crossing
the southwest border). But CBP also reported that it arrested a higher number of criminal
migrants with outstanding warrants and seized larger quantities of illegal drugs than in previous
1
The Court also received supplemental briefing from the parties on whether Plaintiffs met the zone of interests test
for their claims. See CBD ECF Nos. 48, 49, 51; RGISC ECF Nos. 67, 69, 71. Although this Opinion discusses the
two cases together, the Court has carefully considered the arguments and factual allegations made by the individual
Plaintiffs and addresses them separately as necessary below.
2
years. See U.S. Customs and Border Protection, CBP Enforcement Statistics FY 2019,
https://www.cbp.gov/newsroom/stats/cbp-enforcement-statistics-fy2019.
This extraordinary influx of migrants placed an enormous strain on DHS’s resources.
DHS reported that its “facilities [were] overflowing, agents and officers [were] stretched too
thin, and the magnitude of arriving and detained aliens ha[d] increased the risk of life-threatening
incidents.” See Nielsen Letter. This drain on DHS’s resources forced them to “begin releasing
large numbers of aliens.” Id. It feared it was facing a “system-wide meltdown.” Id.
Still, Congress’s 2019 Consolidated Appropriations Act (“CAA”) allocated only $1.375
billion to construct a border wall within the Rio Grande Valley Sector. See CAA § 230(a). It
attached geographic restrictions to this appropriation, CAA § 231, and required DHS to “confer”
with “local elected officials” in affected areas “[p]rior to use of any funds” appropriated in the
CAA “for the construction of physical barriers” within the cities in the Rio Grande Valley
Sector, CAA § 232. Though this appropriation fell far short of the President’s request, he signed
the CAA into law. See CBD Compl. ¶ 117; RGISC Compl. ¶ 65. But that was not all he did.
That same day, the President issued a Proclamation declaring that “a national emergency
exists at the southern border of the United States.” See Presidential Proclamation on Declaring a
Nat’l Emergency Concerning the S. Border of the United States (“Proclamation”), 84 Fed. Reg.
4949 (Feb. 20, 2019). The Proclamation explained that the southern border “is a major entry
point for criminals, gang members, and illicit narcotics.” Id. Since the situation at the border
has “worsened in certain respects in recent years,” the President proclaimed that the border
situation “threatens core national security interests” and makes it “necessary for the Armed
Forces to provide additional support to address the crisis.” Id. Based on this finding, the
3
Proclamation authorized the Secretary of Defense to exercise his authority under 10 U.S.C.
§ 2808 to respond to the national emergency. Id.
Section 2808 is one of several statutes that the President may invoke upon declaration of
a national emergency that invests executive officials with special authority to address that
emergency. 2 See 10 U.S.C. § 2808; 50 U.S.C. § 1631. Under § 2808, the Secretary of Defense
“may undertake military construction projects” or authorize the military departments to
undertake military construction projects “without regard to any other provision of law.” See 10
U.S.C. § 2808(a). But the statute contains two prerequisites: (1) that the national emergency
“requires use of the armed forces”; and (2) that the military construction projects are “necessary
to support such use of the armed forces.” Id. Following the Proclamation, the Secretary of
Defense invoked his § 2808 powers to authorize use of $3.6 billion in “unobligated military
construction funds” for eleven border wall projects in California, Arizona, New Mexico, and
Texas. See Notice of Decision by the Department of Defense to Authorize Border Barrier
Projects Pursuant to 10 U.S.C. § 2808 (“2808 Notice”) at 2, CBD ECF No. 37; RGISC ECF No.
49. 3
The Administration also published a “fact sheet” identifying additional sources of
funding for border wall construction. CBD Compl. ¶ 91; RGISC Compl. ¶ 69. This included:
a) $601 million from the Department of Treasury’s Treasury Forfeiture Fund (“TFF”), 31
U.S.C. § 9705(g)(4)(B), see CBD Compl. ¶ 1; RGISC Compl. ¶ 69; and
b) $2.5 billion from the Department of Defense’s (“DoD”) fund for “Support for
Counterdrug Activities,” 10 U.S.C. § 284. The Defense Secretary transferred these funds
2
The Proclamation also granted executive officials authority under 10 U.S.C. § 12302 to order members of the
Ready Reserve to active duty. See Proclamation; 10 U.S.C. § 12302.
3
All page citations refer to the pagination generated by the Court’s CM/ECF system.
4
to the counterdrug account using his “general transfer” authority under § 8005 of the
2019 Department of Defense Appropriations Act. CBD Compl. ¶ 1; RGISC Compl. ¶ 89.
Treasury Forfeiture Fund. The TFF collects proceeds from “seizures and forfeitures
made pursuant to any law.” 31 U.S.C. § 9705(a). Section 9705 allows the Treasury to make
specific uses of those proceeds. See id. Under the TFF, the Treasury Secretary may allocate
“unobligated balances” remaining in the fund to any “obligation or expenditure in connection
with the law enforcement activities of any Federal agency.” 31 U.S.C. § 9705(g)(4)(B). In
January 2020, CBP announced that it would allocate $340 million of TFF funds to border barrier
projects in the Rio Grande Valley Sector in Texas and another $261 million to “real estate
planning activities for future year barrier construction . . . along the southwest border.” See
Notice Regarding Use of the Treasury Forfeiture Funds 1–2, RGISC ECF No. 68 (“TFF
Notice”).
10 U.S.C. § 284. Under § 284, the DoD can, when requested, “provide support for the
counterdrug activities . . . of any other department or agency of the Federal Government,” 10
U.S.C. § 284(a), including “[c]onstruction of roads and fences and installation of lighting to
block drug smuggling corridors across international boundaries of the United States,” 10 U.S.C.
§ 284(b)(7). In November 2019, DHS requested DoD help block eleven drug-smuggling
corridors. Defs.’ RGISC Mot. at 35–36. DoD responded by approving six border barrier
projects. Id. at 36.
Department of Defense Appropriations Act, § 8005. The DoD funded these § 284
projects, in part, by authorizing transfer of $2.5 billion from other DoD appropriations to its
counterdrug account through its general transfer authority under § 8005 of the 2019 Department
of Defense Appropriations Act. See Defs.’ Notice of Statement 5, CBD ECF No. 26-2. This
5
general transfer authority permits DoD to transfer funds to “higher priority items, based on
unforeseen military requirements, than those for which originally appropriated and in no case
where the item for which funds are requested has been denied by the Congress.” Pub. L. No.
115-245, 132 Stat. 2981 (2018).
The Center for Biological Diversity (“CBD”) and two other nonprofit organizations sued,
arguing that the President’s Proclamation was ultra vires and that the Federal Defendants’
actions under §§ 2808 and 8005 violate the CAA, the Administrative Procedure Act (“APA”),
and the Constitution, or alternatively, are ultra vires acts. See generally CBD Compl. The Rio
Grande International Study Center (“RGISC”)—along with three residents who live along the
border, the Carrizo/Comecrudo Nation, and three nonprofit organizations—separately sued
alleging that the President and executive officials’ acts under the National Emergency Act,
§§ 2808, 284, and 9705 were unconstitutional and ultra vires or, in the alternative, violations of
the APA and the CAA. 4 See generally RGISC Compl.
* * *
Plaintiffs are not the first to raise these challenges. Twice in the last year, other federal
district courts have granted injunctions against the Administration over similar allegations
involving the border wall, only to have those injunctions swiftly stayed by higher courts.
In the Northern District of California, the Sierra Club alleged that the Administration’s
plans to fund border barrier construction “(1) violate Congress’s most-recent appropriations
legislation, (2) are unconstitutional, (3) exceed Defendants’ statutory authority—in other words,
4
Unless otherwise noted, “CBD” refers to all Plaintiffs in Center for Biological Diversity, et al. v. Trump et al., 19-
cv-00408: Center for Biological Diversity, Defenders of Wildlife, and the Animal Legal Defense Fund. “RGISC”
refers to all Plaintiffs in Rio Grande International Study Center, et al. v. Trump et al., 19-cv-00720: Rio Grande
International Study Center, Ramiro R. Ramirez, Carrizo/Comecrudo Nation of Texas, Elsa Hull, Joseph Hein, Labor
Council for Latin American Advancement, California Wilderness Coalition, and GreenLatinos.
6
are ultra vires—and (4) violate NEPA [the National Environmental Policy Act].” Sierra Club v.
Trump, 379 F. Supp. 3d 883, 908 (N.D. Cal. 2019). The district court granted Sierra Club a
preliminary injunction on its claim “that the reprogramming of $1 billion under Section 8005 to
the Section 284 account for border barrier construction [was] unlawful.” Id. at 918. The
Government, it concluded, had failed to prove that the border wall was a project that met the
statutory requirements of § 8005. Id. at 912–15.
But the court refused to grant a preliminary injunction against the DoD’s use of § 2808.
Id. at 921–22. Sierra Club failed to show a likelihood of irreparable harm, since DoD had not yet
identified where it would use § 2808 funds for border wall construction. Id. The court also
rejected Sierra Club’s claim that DHS’s NEPA waivers were invalid, finding that DHS could
waive NEPA requirements, even if funding for DHS projects came through the DoD. Id. at 922–
23. The district court later granted partial summary judgment for Sierra Club and issued an
injunction on Sierra Club’s § 8005 claim. Sierra Club v. Trump, No. 19-cv-00892, 2019 WL
2715422, at *3 (N.D. Cal. June 28, 2019). It decided that its ruling “obviate[d] the need to
independently assess the lawfulness of Defendants’ invocation of Section 284.” Id.
The Government sought an emergency stay of this injunction, which the Ninth Circuit,
over the vigorous dissent of Judge N. Randy Smith, denied. Sierra Club v. Trump, 929 F.3d 670,
677 (9th Cir. 2019). The majority opinion characterized Sierra Club’s claim as “at its core, one
alleging a constitutional violation[.]” Id. at 688–89. Sierra Club alleged that the Government
had no authority under § 8005 to reprogram DoD funds for border wall construction. Id. at 689.
If this proved true, it meant “Defendants [were] acting outside of any statutory appropriation and
[were] therefore spending funds contrary to Congress’s appropriations decisions” in
contravention of the Constitution’s Appropriations Clause. Id. In other words, a statutory
7
violation was a de facto constitutional violation. Under this theory, the court concluded that
Sierra Club had two avenues to challenge the Government’s actions: either “through an equitable
action to enjoin unconstitutional official conduct” or through the APA. 5 Id. at 694. The panel
agreed with the district court’s conclusion that DoD could not reprogram funds through § 8005
and found that DoD’s attempt to “spend these funds therefore violates the Appropriations
Clause[.]” Id.
In dissent, Judge Smith criticized the majority for “turning every question of whether an
executive officer exceeded a statutory grant of power into a constitutional issue.” Id. at 707
(N.R. Smith, J., dissenting) (emphasis in original). According to Judge Smith, the panel invented
a constitutional violation where none existed. Relying on Dalton v. Specter, 511 U.S. 462
(1994), he explained that a claim that an executive official violated a statute is statutory, not
constitutional. Id. at 709–12. Sierra Club’s claim “entirely rises or falls on whether the DoD
complied with the limitations in § 8005.” Id. at 710. To treat this as a constitutional violation
“would turn our current system of administrative review on its head, directing courts in this
circuit to deem unconstitutional any reviewable executive actions . . . that exceed
a statutory grant of authority.” Id. at 712 (quoting Dalton, 511 U.S. at 472) (emphasis and
alteration in original).
Treating the claim as statutory rather than constitutional, Judge Smith concluded that
Sierra Club lacked a cause of action to challenge § 8005. Id. at 709. It had no implied cause of
action under § 8005 because “there is no express suggestion that Congress intended a direct
judicial remedy for a § 8005 violation[.]” Id. at 712 (cleaned up). It had no APA claim because
5
Since the Ninth Circuit characterized Sierra Club’s claim as constitutional, rather than statutory, the court found
that Sierra Club fell within the zone of interests of the Appropriations Clause and did not consider whether Sierra
Club could separately satisfy the zone of interests test for § 8005. Sierra Club, 929 F.3d at 703.
8
Sierra Club fell outside the zone of interests of § 8005 since the statute only “protects Congress
and those who would have been entitled to the funds as originally appropriated” and did not
protect Sierra Club’s “aesthetic, recreational, and generalized environmental interests.” Id. at
715. Finally, even if Sierra Club could allege constitutional violations, Judge Smith concluded
that it had no equitable constitutional cause of action because “an avenue for challenging the
DoD’s reprogramming action exists under the APA—just not for these Plaintiffs.” Id. at 716.
The court should thus not “resort to the extraordinary step of implying an equitable cause of
action for these Plaintiffs.” Id.
On appeal, the Supreme Court disagreed with the Ninth Circuit’s decision and issued an
emergency stay. Trump v. Sierra Club, 140 S. Ct. 1, 1 (2019). The Court found that the
Government had “made a sufficient showing at this stage that the plaintiffs have no cause of
action to obtain review of the Acting Secretary’s compliance with Section 8005.” Id. By
granting the stay, the Court implicitly found a fair prospect that it would reverse the decision
below. 6
In another case, El Paso County argued that the Administration’s plan to fund border
barrier construction “exceed[ed] the Executive Branch’s lawful authority under” the CAA, the
Appropriations Clause, § 2808, § 284, and the National Emergency Act. El Paso Cty. v. Trump,
408 F. Supp. 3d 840, 844 (W.D. Tex. 2019). On summary judgment, the district court relied on
the Supreme Court’s stay in Sierra Club to reject the County’s argument “that the DoD Secretary
exceeded his statutory authority under § 284,” finding the claim “unviable.” Id. Still, it granted
summary judgment for the County and issued an injunction because it concluded that the
6
For the Supreme Court to issue an emergency stay, the petitioner must establish “(1) a reasonable probability that
[the] Court will grant certiorari, (2) a fair prospect that the Court will then reverse the decision below, and (3) a
likelihood that irreparable harm will result from the denial of a stay.” Maryland v. King, 567 U.S. 1301 (2012)
(cleaned up).
9
Administration’s funding plan “violates the CAA generally and specifically violates § 739.” 7 Id.
at 856.
Again, the Government sought an emergency stay. El Paso Cty. v. Trump, No. 19-51144,
slip. op. at 1 (5th Cir. Jan. 8, 2020). The Fifth Circuit granted the stay because, “among other
reasons, [there was a] substantial likelihood that Appellees lack[ed] Article III standing.” Id. at
2. 8
Plaintiffs now raise many of these same claims in their own challenge to the
Government’s plan to fund border wall construction.
II. STANDARD OF REVIEW
To survive a motion to dismiss under Rule 12(b)(1), a plaintiff must establish the
predicates to jurisdiction, including standing, by a preponderance of the evidence. See Lujan v.
Defs. of Wildlife, 504 U.S. 555, 561 (1992). When ruling on this motion, a court must “assume
the truth of all material factual allegations in the complaint and construe the complaint liberally,
granting plaintiff the benefit of all inferences that can be derived from the facts alleged.” Am.
Nat’l Ins. Co. v. FDIC, 642 F.3d 1137, 1139 (D.C. Cir. 2011) (cleaned up). If a court determines
that it lacks jurisdiction for any claim, it must dismiss that claim. Fed. R. Civ. P. 12(b)(1),
12(h)(3).
To establish jurisdiction, each plaintiff must meet the “irreducible constitutional
minimum of Article III standing: injury-in-fact, causation, and redressability.” Shaw v. Marriott
7
Since resolution of the CAA claim granted the County full relief, the court did not address El Paso County’s other
constitutional, NEA, and APA claims. El Paso Cty., 408 F. Supp. 3d at 856.
8
Just a few weeks ago, another district court granted the State of Washington’s request to enjoin the diversion of
funding for construction of a naval base to the border wall. See State of Washington v. Trump, --- F. Supp. 3d ---,
No. 2:19-cv-01502, 2020 WL 949934, at *1 (W.D. Wash. Feb. 27, 2020). It is unclear whether the Government will
appeal this decision.
10
Int’l, Inc., 605 F.3d 1039, 1042 (D.C. Cir. 2010) (internal quotations omitted). Individual
plaintiffs must establish that “(i) they have suffered a concrete and particularized injury in fact,
(ii) that was caused by or is fairly traceable to the actions of the defendant, and (iii) is capable of
resolution and likely to be redressed by judicial decision.” Food & Water Watch, Inc. v. Vilsack,
808 F.3d 905, 914 (D.C. Cir. 2015) (internal citations omitted). Organizations too may establish
standing either on their own behalves, id. at 919, or on behalf of their members, Interstate Nat.
Gas Ass’n of Am. v. FERC, 494 F.3d 1092, 1095 (D.C. Cir. 2007).
At the motion to dismiss stage, plaintiffs need only “state a plausible claim” that they
meet the requirements for standing. Food & Water Watch, 808 F.3d at 913 (internal citations
omitted). The “plaintiff’s burden to demonstrate standing grows heavier at each stage of the
litigation.” Osborn v. Visa Inc., 797 F.3d 1057, 1063 (D.C. Cir. 2015).
Even if a court has jurisdiction, to survive a motion to dismiss under Rule 12(b)(6), a
complaint must contain sufficient factual allegations that, if true, “state a claim to relief that is
plausible on its face.” Bell Atl. Corp. v. Twombly, 550 U.S. 544, 570 (2007). A court must “treat
the complaint’s factual allegations as true and must grant the plaintiffs the benefit of all
inferences that can be derived from the facts alleged.” L. Xia v. Tillerson, 865 F.3d 643, 649
(D.C. Cir. 2017) (cleaned up). But courts need not accept the truth of legal conclusions or
“threadbare recitals of the elements of a cause of action, supported by mere conclusory
statements.” Ashcroft v. Iqbal, 556 U.S. 662, 678 (2009) (cleaned up). The court must consider
only “the facts alleged in the complaint, any documents either attached to or incorporated in the
complaint and matters of which [the court] may take judicial notice.” Hurd v. District of
Columbia, 864 F.3d 671, 678 (D.C. Cir. 2017) (alterations in original).
11
III. ANALYSIS
A. Jurisdiction
1. All Plaintiffs, except the Labor Council for Latin American Advancement
(“LCLAA”) and GreenLatinos, plausibly alleged standing.
Before proceeding to the merits of the case, the Court “must satisfy itself that the parties
have standing to raise the challenges they advance.” Pub. Citizen v. FTC, 869 F.2d 1541, 1545
(D.C. Cir. 1989). The Government makes three concessions on Plaintiffs’ standing. First, in Rio
Grande International Study Center v. Trump, the Government concedes that CalWild has
“pleaded representational standing on behalf of members who recreate near El Centro Project 1”
to challenge the Defense Secretary’s use of counterdrug funding under 10 U.S.C. § 284. Defs.’
RGISC Reply 23, RGISC ECF No. 47. Next, it admits that RGISC pleaded organizational
standing to “challenge the construction of one of the § 2808 projects, Laredo Project 7.” Defs.’
Suppl. Br. 2–3 (“Defs.’ § 2808 Br.”), RGISC ECF No. 56. Finally, in Center for Biological
Diversity v. Trump, the Government does not challenge Plaintiffs’ standing to bring any but their
§ 8005 claim. Defs.’ CBD Mot. at 51. The Court agrees with these concessions.
The Government challenges standing for all other Plaintiffs and claims.
a. Hull, Ramirez, Hein, and the Carrizo/Comecrudo Nation of Texas have
plausibly alleged standing.
RGISC’s Complaint alleges that the border wall—funded by the designated statutory
authorities—will cause Plaintiffs harm. See RGISC Compl. ¶ 105–32. Joseph Hein, the owner
of a ranch 20 miles downstream from Laredo, Texas, alleges that CBP’s plans to build the border
wall in the Laredo Sector would “diminish [his] use and enjoyment of his land, reduce his
property’s value, and harm his business” since the wall will either cut off access to his ranch’s
sole water supply or “adversely impact the water quality.” RGISC Compl. ¶¶ 110–11. Elsa
Hull, a homeowner downstream from Laredo, claims that the wall in the Laredo Sector will “cut
12
off [her] access to the river, disrupt the wildlife she values observing, increase the risk of damage
to her property due to flooding, diminish her use and enjoyment of her land, and reduce her
property’s value.” Id. ¶¶ 112–13. Dr. Ramiro Ramirez and the Carrizo/Comecrudo Nation of
Texas claim that barrier construction in Hidalgo County, Texas, will desecrate and cut off access
to an ancestral cemetery. Id. ¶¶ 114–20. These Plaintiffs proffer that a favorable decision from
this Court will grant them relief. See RGISC Opp’n at 24, 26.
The Government’s objections to RGISC Plaintiffs’ standing largely rest on the continued
uncertainty surrounding the Government’s use of the funds from §§ 2808, 284, and the TFF.
RGISC alleges that the Government will use funds designated for border barrier construction
under these statutes to build barriers in sectors where Plaintiffs or Plaintiffs’ members live, work,
or recreate. See RGISC Compl. ¶¶ 105–32. The Government does not disagree that the wall—if
built as RGISC alleges—will injure Plaintiffs. Instead, it responds that there is no evidence that
it will use those sources of funding to build the barriers on or near the land used by Plaintiffs.
Defs.’ RGISC Mot. at 54–57; Defs.’ § 2808 Br. at 4–7; Mot. to Dismiss Hr’g Tr. 99:24–100:4
(Dec. 16, 2019).
But Plaintiffs point to authorities that suggest that the border barrier construction in their
sectors cannot occur, as the Government argues, without use of the TFF, § 2808, and § 284. See
RGISC Opp’n 23, RGISC ECF No. 39. Indeed, that has already proved true.
The Government’s designation and use of funds for border wall construction is constantly
evolving. In fact, since the Government first moved to dismiss RGISC’s case, the Government
has filed seven notices advising the Court of updated plans for border barrier funding and
construction. See RGISC ECF Nos. 46, 49, 51, 55, 59, 68, 70. These changes affect Plaintiffs’
standing. The Government’s initial motion argued that RGISC and Joseph Hein lacked standing
13
because the Defense Secretary had not yet decided whether to “undertake or authorize any
barrier construction projects under § 2808, let alone a specific project in the Laredo Sector where
RGISC operates and where Mr. Hein owns a ranch.” Defs.’ RGISC Mot. at 59. Two months
later, the Government withdrew that argument after the Secretary authorized use of § 2808 funds
in Laredo Project 7. Defs.’ § 2808 Br. at 2–3.
Similarly, at oral argument, the Government suggested the Court dismiss all claims
related to use of the TFF, since CBP had not yet decided where to use those funds. See Hr’g Tr.
at 99:20–100:9. But, one month later, CBP announced that it would use a portion of the funds in
Hidalgo County, a half mile from the Carrizo/Comecrudo Nation’s ancestral cemetery. See TFF
Notice at 2; RGISC Suppl. Br. 25 (“RGISC ZOI Br.”), RGISC ECF No. 69.
Plaintiffs’ bar at the motion to dismiss stage is low. They must only “plausibly allege”
standing. See Food & Water Watch, 808 F.3d at 913. Given the quickly evolving nature of the
challenged actions, the Court finds that these Plaintiffs have plausibly alleged that they will
likely suffer injury because of the agency’s actions.
This may change at later stages of litigation. A “court’s determination that a plaintiff has
established standing at the motion to dismiss stage by alleging sufficient facts in her pleadings is
only the first step, because that finding does not obviate the court’s responsibility to ensure that
the plaintiff can actually prove those allegations when one or both parties seek summary
judgment.” Scenic Am., Inc. v. U.S. DOT, 836 F.3d 42, 48 (D.C. Cir. 2016) (emphasis in
original); see also Cal. Cattlemen’s Ass’n v. U.S. Fish & Wildlife Serv., 369 F. Supp. 3d 141, 145
& n.3 (D.D.C. 2019).
14
b. LCLAA and GreenLatinos lack standing.
LCLAA and GreenLatinos failed to establish either representational standing or standing
in their own right. Neither organization has pleaded a “concrete and demonstratable injury to its
activities” to establish its own standing. See Food & Water Watch, Inc., 808 F.3d at 919
(cleaned up); Defs.’ RGISC Mot. at 60–64. And neither has alleged facts that any members are
harmed by the border wall construction. See Defs.’ RGISC Mot. at 65–67.
LCLAA and GreenLatinos do not disagree. Rather, they argue that because the
Government has conceded that CalWild has standing, this “satisfies the standing inquiry for all
of the organizational plaintiffs.” RGISC Opp’n at 30. In other words, they do not independently
need to show standing.
Not so. Though the D.C. Circuit has stated that “if one party has standing in an action, a
court need not reach the issue of standing of other parties when it makes no difference to the
merits of the case,” see Ry. Labor Execs.’ Ass’n v. United States, 987 F.2d 806, 810 (D.C. Cir.
1993) (emphasis added), that does not mean the Court must give all Plaintiffs an automatic
“pass” when one meets the standing requirements. It means that the Court, in its discretion, need
not analyze standing for each individual plaintiff when it will not affect the case. Id. Here, the
Court declines to exercise that discretion since LCLAA and GreenLatinos have completely failed
to establish organizational standing. These Plaintiffs will be dismissed from the case.
c. CBD Plaintiffs have standing to challenge the Defense Secretary’s action
under § 8005.
The Government suggests that CBD Plaintiffs lack standing to challenge the Secretary of
Defense’s § 8005 transfer of funds. Defs.’ CBD Mot. at 51–53. Plaintiffs cannot show an
injury, the Government contends, because they have “no legally protected interest in the
transferred funds” and the use of § 8005 “does not directly result in the border barrier
15
construction Plaintiffs claim will injure them.” Id. at 52.
Plaintiffs claim no interest in the transferred funds. CBD Opp’n 27, CBD ECF No. 31.
Their injury is based on the effects of the border wall construction, not on an entitlement to the
DoD funds. They have undoubtedly pleaded that this construction will cause injury. See CBD
Opp’n Ex. 3, CBD ECF No. 31-3. So the only question is whether the Defense Secretary’s §
8005 transfer caused this injury.
Plaintiffs’ injuries must be “fairly traceable” to Defendants’ actions. Lujan, 504 U.S. at
560. But that action need not be “the very last step in the chain of causation” for Plaintiffs to
have standing. Bennett v. Spear, 520 U.S. 154, 168–69 (1997). While it is easier for Plaintiffs to
establish standing when an action directly caused their injury, they may still establish causation
by showing that “the injury does not result from ‘the independent action of some third party not
before the court.’” Exhaustless Inc. v. FAA, 931 F.3d 1209, 1212 (D.C. Cir. 2019) (quoting
Lujan, 504 U.S. at 560, 562).
CBD has met that burden. CBD alleges that the Defense Secretary used § 8005 to
transfer $2.5 billion from other appropriated DoD funds to the DoD’s counterdrug account. See
CBD Opp’n at 29 (citing Decl. of Kenneth Rapuano ¶¶ 4–5 (“First Rapuano Decl.”), Defs.’ CBD
Mot. Ex. 1, CBD ECF No. 22-1; Second Decl. of Kenneth P. Rapuano ¶¶ 6–7 (“Second
Rapuano Decl.”), CBD ECF No. 25-1). Then, the next day, he transferred these funds to another
account to help DHS with barrier construction using § 284. Id. (citing First Rapuano Decl. ¶ 6;
Second Rapuano Decl. ¶ 9). The funds that the Defense Secretary routed through the
counterdrug account using § 8005 are directly traceable to the funds allocated for border wall
construction under § 284. Not only was the same amount of money transferred in and out of the
counterdrug account within one day, but the Secretary of Defense—who is a named Defendant—
16
took both actions. See id. There is no concern that an independent party took the action that
injured Plaintiffs. CBD Plaintiffs, then, have satisfactorily pleaded injury, causation, and
redressability to establish standing at the motion to dismiss stage. 9
2. The Court Lacks Jurisdiction Over Plaintiffs’ Ultra Vires Challenges to the
President’s Emergency Declaration Because They Present Non-Justiciable
Political Questions.
The President declared a national emergency under the National Emergency Act
(“NEA”), 50 U.S.C. § 1621. See Proclamation. The NEA authorizes the President to declare an
emergency to make certain “special or extraordinary” statutory powers available. 50 U.S.C.
§ 1621. CBD and RGISC each allege that the President’s Proclamation was ultra vires.
According to RGISC, the Proclamation was unlawful because “no colorable emergency within
the meaning of the NEA exists to invoke the statute.” RGISC Compl. ¶ 135. CBD, on the other
hand, concedes that an emergency may exist, but argues that the President exceeded his authority
under the NEA because he used that authority “as a political negotiating tactic.” CBD Compl.
¶ 149; see Hr’g Tr. at 27:21–25. Either way, the Government responds that to resolve these
claims, the Court would need to answer a non-justiciable political question. Defs.’ CBD Mot. at
43–48; Defs.’ RGISC Mot. at 44–48. The Court agrees.
The political question doctrine is a “narrow exception” to the general rule that the
“Judiciary has a responsibility to decide cases properly before it, even those it would gladly
avoid.” Zivotofsky ex. rel. Zivotofsky v. Clinton, 566 U.S. 189, 194 (2012) (cleaned up). The
doctrine precludes judicial review of claims that “revolve around policy choices and value
determinations constitutionally committed for resolution to the halls of Congress or the confines
of the Executive Branch.” Japan Whaling Ass’n v. Am. Cetacean Soc., 478 U.S. 221, 230
9
The Government does not argue that CBD’s § 8005 claim lacks redressability. The Court agrees that CBD has
sufficiently shown that the equitable relief requested would redress its injuries. See generally CBD Opp’n Ex. 3.
17
(1986). So the availability of judicial review turns not on whether the case concerns political
decisions, but on whether the Court must weigh in on “policy choices and value determinations.”
Id. The Court’s analysis, then, must account for not only what political action Plaintiffs
challenge, but also what question each Plaintiff raises about that action. See bin Ali Jaber v.
United States, 861 F.3d 241, 245 (D.C. Cir. 2017) (quoting Baker v. Carr, 369 U.S. 186, 211
(1962)).
In the D.C. Circuit, this analysis proceeds through a three-step inquiry. Al-Tamimi v.
Adelson, 916 F.3d 1, 8 (D.C. Cir. 2019). First, the Court must identify the questions that
Plaintiffs’ claims raise. Id. Second, the Court considers whether these issues present a political
question by using the factors that the Supreme Court identified in Baker v. Carr. Id. And
finally, the Court must determine whether these political questions are “inextricable from the
case.” Id. In other words, could the Court resolve the merits of Plaintiffs’ claims without
weighing in on the political questions?
Because CBD and RGISC take different approaches to challenge the same presidential
action—potentially raising different questions about the President’s conduct—the Court
considers each in turn.
a. RGISC’s challenge to the President’s Proclamation presents a non-
justiciable political question.
The NEA authorizes the President to “declare [a] national emergency.” 50 U.S.C.
§ 1621. RGISC insists no emergency exists, so the President had no authority to make his
Proclamation. RGISC Compl. ¶ 135. RGISC’s claim raises one obvious question: was the
President correct that a national emergency exists at the southern border?
The trouble is that this is a quintessential political question. Many Presidents have
declared national emergencies for many reasons. For instance, President Clinton invoked the
18
NEA to prohibit new investment in Burma because of the Burmese government’s “large-scale
repression of the democratic opposition,” Exec. Order No. 13,047, 62 Fed. Reg. 29,301 (May 22,
1997), and to prohibit importation of “all rough diamonds from Sierra Leone” because of Sierra
Leone’s “flagrant violation of the Lomé Peace Agreement,” Exec. Order 13,194, 3 C.F.R.
§ 13194 (Jan. 18, 2001). President George W. Bush and President Obama used the NEA to
block the property of certain persons “contributing to the conflict in Côte d’Ivoire,” Exec. Order
13,396, 71 Fed. Reg. 7,389 (Feb. 10, 2006), “undermining democratic processes or institutions in
Belarus,” Exec. Order 13,405, 71 Fed. Reg. 35,485 (June 20, 2006), “threatening the peace,
security, or stability of Yemen,” Exec. Order 13,611, 3 C.F.R. § 13611 (May 16, 2012), and
“contributing to the situation in Ukraine,” Exec. Order 13,660, 79 Fed. Reg. 13,493 (Mar. 10,
2014). President Bush also used the NEA to respond to Hurricane Katrina, Proclamation 7924,
70 Fed. Reg. 54,225 (Sept. 13, 2005), and the 9/11 attacks, Proclamation 7463, 3 C.F.R § 7463
(Jan. 1, 2002). Just last month, President Trump invoked the NEA to declare a national
emergency because of the COVID-19 outbreak. Proclamation 9994, 85 Fed. Reg. 15,337 (Mar.
18, 2020). Indeed, the Nation remains under at least 32 national emergencies declared by this
and former Presidents. See generally Emily E. Roberts, Declarations under the National
Emergencies Act, Part 1: Declarations Currently in Effect (Congressional Research Serv., 2019),
https://fas.org/sgp/crs/natsec/LSB10252.pdf.
Although presidential declarations of emergencies—including this Proclamation—have
been at issue in many cases, no court has ever reviewed the merits of such a declaration. See,
e.g., Defs.’ RGISC Mot. at 44 n.6 (collecting cases in which courts note that the President’s
declaration of an emergency is unreviewable). In part, this is because the declaration of a
national emergency raises questions about national security or foreign policy. And “[m]atters
19
intimately related to foreign policy and national security are rarely proper subjects for judicial
intervention,” since the Constitution commits those issues to the Executive and Legislative
Branches. See Haig v. Agee, 453 U.S. 280, 292 (1981); see Baker, 369 U.S. at 217 (noting that a
political question exists when there is a “textually demonstrable constitutional commitment of
[an] issue to a coordinate political department”).
Baker’s second factor even more strongly suggests that this is a political question. The
NEA provides no “judicially discoverable and manageable standards” to help the Court
determine whether the situation at the border is a “national emergency.” See Baker, 369 U.S. at
217. The NEA, in relevant part, states:
With respect to Acts of Congress authorizing the exercise, during the period of a
national emergency, of any special or extraordinary power, the President is
authorized to declare such national emergency. Such proclamation shall
immediately be transmitted to the Congress and published in the Federal Register.
50 U.S.C. § 1621. In other words, the statute simply allows the President to declare an
emergency to activate special emergency powers created by Congress. Nothing else
guides how the President should make this decision.
RGISC suggests that determining whether the President exceeded his authority under the
NEA is a simple matter of statutory interpretation—something that courts routinely do. RGISC
Opp’n at 39. To be sure, statutory claims are “less likely to present a political question—both
because statutory interpretation is generally committed to the judicial branch and because
statutory language is likely to include judicially manageable standards.” Al-Timimi, 916 F.3d at
12 n.6.
For instance, in Al-Timimi, the D.C. Circuit found that a claim under the Alien Tort
Statute was justiciable even though the court would need to determine whether Israeli soldiers
were committing genocide in a Palestinian village. Id. at 11. This question touched on intensely
20
sensitive political issues. But the court noted that it was a “purely legal issue” capable of judicial
review because “[g]enocide has a legal definition.” Id.
Though that claim was not barred by the political question doctrine, the court noted that a
statutory question would raise a non-justiciable political question if it “require[d] the court to
make an integral policy choice.” Id. at 12 n.6. For example, previously the Circuit refused to
consider an Antiterrorism and Effective Death Penalty Act claim because the court would need
to determine whether “terrorist activity ‘threatens the security of United States nationals or the
national security of the United States,’ an element of a claim under the [Act].” Id. (citing El-
Shifa Pharm. Indus. Co. v. United States, 607 F.3d 836, 843 (D.C. Cir. 2010)) (cleaned up).
Another time, the Circuit declined to resolve a statutory claim under the Federal Tort
Claims Act when appellants asked it to determine “whether military action was ‘wrongful’”—an
element of that statute. Id. (citing Schneider v. Kissinger, 412 F.3d 190, 196–97 (D.C. Cir.
2005)). In those cases, resolving the merits would have required the court to “reconsider[] the
wisdom of discretionary decisions made by the political branches in the realm of foreign policy
or national security.” See El-Shifa, 607 F.3d at 842. This the judiciary will not do.
So too here. This Court can no more determine whether illegal border crossings
“threaten[] core national security interests and constitute[] a national emergency,” see
Proclamation, than the D.C. Circuit could find that terrorist activity “threatens . . . the national
security of the United States.” Al-Timimi, 916 F.3d at 12 n.6 (citing El-Shifa, 607 F.3d at 843)
(cleaned up). Although RGISC’s ultra vires claim challenges the President’s statutory authority,
Congress provided no guidance to help courts assess whether a situation is dire enough to qualify
as an “emergency.” And with good reason. Cf. The Federalist No. 70, at 231 (Alexander
Hamilton) (Benediction Classics, 2017) (“Energy in the Executive is a leading character in the
21
definition of good government. It is essential to the protection of the community against foreign
attacks[.]”). Whether a crisis reaches the point of a national emergency is inherently a subjective
and fact-intensive inquiry. Any standard that the Court chose would require it to make “integral
policy choices” about this country’s national security, immigration, and counterdrug policies. 10
RGISC’s entire claim hinges on whether the Court agrees with the President or RGISC’s
assessment of the situation along the southern border. Because this political question is
inextricable from the merits of RGISC’s claim, the Court will dismiss RGISC’s NEA claim from
Count I of its Complaint.
b. CBD’s challenge to the President’s Proclamation presents a non-
justiciable political question.
Center for Biological Diversity tries to sidestep the political question doctrine by
conceding that the situation at the southern border may qualify as a “national emergency.” See
CBD Opp’n at 48; Hr’g Tr. at 27:21–25. It claims the President’s Proclamation is ultra vires for
a different reason: the President “unlawfully” used his authority under the NEA as a “political
negotiating tactic.” See CBD Compl. ¶ 149. In other words, even if the President’s actions fully
complied with the NEA’s requirements, his asserted reasons were an unlawful pretext for a
politically motivated decision.
Though framed differently than RGISC’s argument, CBD’s claim presents a similar non-
justiciable political question. Rather than ask the Court to decide whether the President was
correct in declaring a national emergency, CBD asks the Court to consider whether the
President’s motives were pure in declaring the emergency. This again raises a political question
10
The Court will therefore not review any portion of the President’s emergency declaration, including his
determination that the emergency “requires the use of the armed forces.” See Proclamation. “In military matters in
particular, the courts lack the competence to assess the strategic decision to deploy force or to create standards to
determine whether the use of force was justified or well-founded.” El-Shifa, 607 F.3d at 844.
22
because of the “‘lack of judicially discoverable and manageable standards for resolving’ the
question.” Zivotofsky, 566 U.S. at 197 (quoting Baker, 369 U.S. at 217).
The NEA nowhere mentions the President’s motivations and thus provides no standards
for the Court to use to evaluate whether his motivations were “lawful.” Yet, citing Department
of Commerce v. New York, 139 S. Ct. 2551 (2019), CBD suggests that the Court can invalidate
an otherwise lawful action if the reasons justifying that action were a “sham.” Hr’g Tr. at 22. In
New York, the Supreme Court engaged in two separate inquiries to determine whether, first, the
Secretary of Commerce lawfully added a question to the census questionnaire, and, second,
whether his reasons for doing so were pretextual. 139 S. Ct. at 2573. So, CBD argues, even if
the emergency declaration itself were lawful, the President’s pretextual reasons could supply a
separate basis for review. Hr’g Tr. 24:8–14.
What CBD fails to account for is that New York arose in the APA context. As the
Supreme Court acknowledged in that case, there is a general rule against “inquiring into ‘the
mental processes of administrative decisionmakers.’” 139 S. Ct. at 2573 (quoting Citizens to
Pres. Overton Park, Inc. v. Volpe, 401 U.S. 402, 409 (1971)). “Judicial inquiry into executive
motivation represents a substantial intrusion into the workings of another branch of Government
and should normally be avoided.” Id. (cleaned up). Within the APA context, there is a “narrow
exception to [this] general rule” where there is a “strong showing of bad faith or improper
behavior,” since this behavior suggests arbitrary and capricious decisionmaking. Id. at 2573–74
(quoting Overton Park, 401 U.S. at 420) (emphasis added). But CBD cites nothing to suggest
that this exception extends beyond the APA context to ultra vires review to allow the Court to
second-guess the motives behind declarations of national emergencies.
23
Just as RGISC is asking the Court to second-guess the President’s determination that a
national emergency exists, CBD is asking the Court to investigate why the President invoked the
NEA. As with RGISC’s claim, this not only requires the Court to draw standards for “lawful
motivations” from whole cloth, but also forces the Court into the realm of discretionary policy
decisions. See Baker, 369 U.S. at 217 (noting that a political question is present when the court
cannot decide an issue “without an initial policy determination of a kind clearly for nonjudicial
discretion”). These policy decisions are for the political, not judicial, branches to resolve. “For
the judiciary to probe the reasoning which underlies this Proclamation would amount to a clear
invasion of the legislative and executive domains.” See United States v. George S. Bush & Co.,
310 U.S. 371, 380 (1940). The Court will therefore dismiss Count I of CBD’s Amended
Complaint.
c. The President will be dismissed as a party.
The Government argues that if the Court dismisses Plaintiffs’ NEA claims, President
Trump should no longer be a party to this case. Hr’g Tr. at 18:6–12. Both sets of Plaintiffs
named the President as a defendant and seek declaratory relief against him. CBD Compl. ¶ 18;
RGISC Compl. ¶ 17.
Granting direct relief against the President in any form is an extraordinary measure given
the President’s unique position in our system of government. See, e.g., Swan v. Clinton, 100
F.3d 973, 978 (D.C. Cir. 1996) (“[I]njunctive relief against the President personally is an
extraordinary measure not lightly to be undertaken.”). And the D.C. Circuit counsels that “[i]n
most cases, any conflict between the desire to avoid confronting the elected head of a coequal
branch of government and to ensure the rule of law can be successfully bypassed, because the
injury at issue can be rectified by injunctive relief against subordinate officials.” Id.
24
Plaintiffs admit that is the case here. Though CBD and RGISC could only obtain
equitable relief for their NEA claims by suing the President, both parties agree that injunctive
and declaratory relief for all their other claims will be available through other Defendants. Hr’g
Tr. at 13, 34.
RGISC suggests that despite these alternative avenues to relief, the Court should decline
dismissing the President at the motion to dismiss stage. Hr’g Tr. at 33. The Court disagrees.
The Supreme Court has noted repeatedly in the qualified immunity context that officers
against whom there is no viable claim should be dismissed at the “earliest possible stage in
litigation,” Hunter v. Bryant, 502 U.S. 224, 227 (1991), so they can avoid the “unwarranted
demands customarily imposed upon those defending a long drawn out lawsuit,” Siegert v. Gilley,
500 U.S. 226, 232 (1991). Pretrial matters, such as discovery, should be avoided if possible,
since “inquiries of this kind can be peculiarly disruptive of effective government.” Mitchell v.
Forsyth, 472 U.S. 511, 526 (1985) (quoting Harlow v. Fitzgerald, 457 U.S. 800, 817 (1982)).
Though the doctrine of qualified immunity does not apply here, the principles
undergirding it are instructive. The doctrine counsels against retaining executive officials in a
lawsuit longer than necessary because litigation disrupts “effective government.” Id. Here also,
retaining the President as a defendant, even when all Plaintiffs agree that they can obtain the
relief they seek through the other Defendants, prolongs these disruptive effects for no reason.
Since Plaintiffs may obtain relief for all remaining claims through the other Defendants, the
Court will dismiss the President as a party to this lawsuit. See Doe v. Trump, 319 F. Supp. 539,
542 (D.D.C. 2018) (dismissing the President before summary judgment because dismissal would
“have little or no substantive effect on this litigation” since “Plaintiffs [could] still obtain all of
the relief that they [sought] from the other Defendants”).
25
3. The Court Lacks Jurisdiction Over Plaintiffs’ NEPA Claims Because the
Secretary of Homeland Security Waived NEPA for These Barrier Projects.
The National Environmental Policy Act (“NEPA”), 42 U.S.C. §§ 4321 et seq., is the
“basic national charter for protection of the environment.” 40 C.F.R. § 1500.1(a). CBD and
RGISC allege that the Government violated NEPA by failing to conduct environmental impact
reports, solicit public engagement, and properly coordinate between agencies to engage in the
“NEPA process.” See CBD Compl. ¶¶ 182–93; RGISC Compl. ¶¶ 163–68. The Government
responds that the Court lacks jurisdiction to hear CBD and RGISC’s claims because the
Secretary of Homeland Security waived NEPA for the challenged border projects. Defs.’ CBD
Mot. at 53–55; Defs.’ RGISC Mot. at 51–52.
The Court agrees with the Government here. The Secretary waived NEPA for the
challenged border wall construction. And because he had the authority to do so under the Illegal
Immigration Reform and Immigrant Responsibility Act (“IIRIRA”), 11 the Court will dismiss
Plaintiffs’ NEPA claims. See N. Am. Butterfly Ass’n v. Nielsen, 368 F. Supp. 3d 1, 8 (D.D.C.
2019) (“It is undisputed that the DHS Secretary’s October 2018 Waiver Determination, if validly
exercised, deprives the Court of jurisdiction to hear plaintiff’s NEPA . . . claims.”); see also In
re. Border Infrastructure Envtl. Litig., 915 F.3d 1213, 1221 (9th Cir. 2019) (“[A] valid waiver of
the relevant environmental laws under section 102(c) is an affirmative defense to all the
environmental claims.”).
Through IIRIRA, Congress tasked the Secretary of Homeland Security to “take such
actions as may be necessary” to install “physical barriers” on the border “to deter illegal
crossings in areas of high illegal entry into the United States.” IIRIRA § 102(a). To allow DHS
11
Pub. L. No. 104-208, Div C, Title I, Subtitle A, § 102(a)–(c), 110 Stat. 3009–554 (1996); Pub. L. No. 109–13,
Div B, Title I, § 102, 119 Stat. 306 (2005); Pub. L. No. 109–367, § 3, 120 Stat. 2638 (2006); Pub. L. No. 110–61,
Div E, Title V, § 564, 121 Stat. 2090 (2007).
26
to undertake construction expeditiously, Congress gave the Secretary “authority to waive all
legal requirements” when he determines it is “necessary to ensure expeditious construction of the
barriers[.]” IIRIRA § 102(c)(1).
DHS requested that the DoD, under § 284, assist with its barrier construction projects,
finding this “necessary” to install barriers along the southern border. See First Rapuano Decl.
¶ 3. Later, relying on his authority under IIRIRA, the Secretary of Homeland Security waived
NEPA for those barrier projects. See Determination Pursuant to Section 102 of IIRIRA, 84 Fed.
Reg. 17,185–87 (Apr. 24, 2019); 84 Fed. Reg. 21,798–801 (May 15, 2019).
CBD and RGISC contend that these waivers were ineffective because IIRIRA permits the
Secretary of Homeland Security to waive “all legal requirements” only for “construction of the
barriers . . . under this section.” See RGISC Opp’n at 52–53 (citing IIRIRA § 102(c)); CBD
Opp’n at 58 (same). Here, they say, DHS is not building barriers under IIRIRA (i.e., “this
section”). See RGISC Opp’n at 53; CBD Opp’n at 58. Rather, DoD is constructing barriers
under § 284. See RGISC Opp’n at 53; CBD Opp’n at 58.
That is not fully accurate. DHS is building barriers pursuant to IIRIRA. So the DHS
Secretary is allowed to waive NEPA. To be sure, DHS is not working alone to erect the barriers
envisioned under IIRIRA. But nothing in the text of the statute orders that it do so. The statute
grants DHS broad authority to “take such actions as may be necessary” to construct the barriers,
see IIRIRA § 102(a)—which, here, included requesting assistance from DoD. Congress permits
DoD to aid other agencies, like DHS, in constructing “fences . . . to block drug smuggling
corridors across international boundaries of the United States.” 10 U.S.C. § 284(a), (b)(7).
When these two interests coincide—such as in the sectors where the agencies are using
§ 284 funding—nothing in IIRIRA prohibits agency cooperation. Since DHS is constructing
27
barriers under IIRIRA, though with the aid of DoD, the Secretary was well within his statutory
authority to waive NEPA’s requirements. The Court thus lacks jurisdiction to review CBD and
RGISC’s NEPA claims. Accord N. Am. Butterfly Ass’n, 368 F. Supp. 3d at 8.
B. APA Claims
Since the Court has jurisdiction to hear Plaintiffs’ remaining claims, the Court now turns
to the Government’s contention that CBD and RGISC lack a cause of action under the APA.
First, the Government argues that Plaintiffs’ § 2808 and § 9705 claims fail to meet the APA’s
threshold requirements for review of agency action. Next, the Government suggests that CBD
and RGISC fall outside the zone of interests of all their statutory claims. Finally, the
Government urges that Plaintiffs fail to state a claim under the APA. The results here are a
mixed bag—the Court will dismiss some of Plaintiffs’ APA claims, but others may proceed.
1. Plaintiffs’ Claims Generally Meet the APA’s Threshold Requirements for
Review of Agency Action.
Agency action is presumptively reviewable under the APA unless a statute
precludes judicial review, the action “is committed to agency discretion by law,” or the action is
not final. See Transactive Corp. v. United States, 91 F.3d 232, 236 (D.C. Cir. 1996) (citing
5 U.S.C. § 701(a)(1), (a)(2)). The Government does not contest that Plaintiffs may use the APA
to challenge the agencies’ actions under § 284, § 8005, or the CAA (even if it believes these
APA claims fail for other reasons, see infra III.B.2 & III.B.3). But it does claim that Plaintiffs
cannot use the APA to challenge Defendants’ authorization of border wall construction under
§ 2808 and § 9705 because those decisions were “committed to agency discretion by law.” 12 See
Defs.’ CBD Mot. at 57–60; Defs.’ RGISC Mot. at 69–73.
12
The Government withdrew its argument that no “final agency action” existed for funding under § 2808 once the
Defense Secretary allocated those funds to Laredo Sector construction. See Defs.’ § 2808 Br. at 3.
28
Consider first § 2808. When a national emergency “requires the use of the armed
forces,” § 2808 allows the Secretary of Defense to “undertake military construction projects” that
“are necessary to support such use of the armed forces.” 10 U.S.C. § 2808(a). The Government
zeroes in on the phrase “necessary to support . . . armed forces.” Defs.’ CBD Mot. at 57–59;
Defs.’ RGISC Mot. at 69–70. It suggests the Court has no “standard to apply,” because the
Secretary had no factors to consider before authorizing construction. Defs.’ CBD Mot. at 58–59;
Defs.’ RGISC Mot. at 70–71. Determining whether military construction is “necessary,” the
Government urges, is an “inescapably discretionary judgment.” Defs.’ RGISC Reply at 36–37;
see also Defs.’ CBD Mot. at 59.
Not so. “The exception for agency action ‘committed to agency discretion by law’ is a
‘very narrow’ one, reserved for ‘those rare instances where statutes are drawn in such broad
terms that in a given case there is no law to apply.’” Hi-Tech Furnace Sys. v. FCC, 224 F.3d
781, 788 (D.C. Cir. 2000). The Court must weigh whether the statute provides any “statutory
reference point” by which it can judge the Secretary’s actions. See Milk Train, Inc. v. Veneman,
310 F.3d 747, 752 (D.C. Cir. 2002). It considers “both the nature of the administrative action at
issue and the language and structure of the statute that supplies the applicable legal standards for
reviewing that action.” Sierra Club & Valley Watch, Inc. v. Jackson, 648 F.3d 848, 855 (D.C.
Cir. 2011).
Section 2808 appears to provide several “statutory reference points.” For instance, the
Court can evaluate whether the border barrier qualifies as “military construction.” CBD Opp’n
at 55; RGISC Opp’n at 73. Congress defined the phrase “military construction” in § 2801 as
“any construction, development, conversion, or extension of any kind carried out with respect to
a military installation, whether to satisfy temporary or permanent requirements, or any
29
acquisition of land or construction of a defense access road.” 10 U.S.C. § 2801(a). Answering
whether the border wall qualifies as “military construction,” then, is a simple matter of statutory
interpretation, something that is well within the judiciary’s competence. See El-Shifa, 607 F.3d
at 858 n.5.
Neither is the phrase “necessary to support [the] armed forces” so broadly drawn that
“there is no law to apply.” Hi-Tech Furnace Sys., 224 F.3d at 788. Though the Defense
Secretary undoubtably has significant discretion under this statute, it is not limitless. Ultimately,
the inquiry into whether something “supports the armed forces” and is “necessary” is objective.
Had Congress wished, it could have committed this decision to the Secretary’s subjective
discretion. For instance, in Webster v. Doe, the Supreme Court determined that a statute was
“committed to agency discretion by law,” because it “allow[ed] termination of an Agency
employee whenever the Director ‘shall deem such termination necessary or advisable in the
interests of the United States’, not simply when the dismissal is necessary or advisable to those
interests.” 486 U.S. 592, 600 (1988) (emphasis on original); see also e.g., IIRIRA § 102(c)
(“[T]he Secretary of Homeland Security shall have the authority to waive all legal requirements
such Secretary, in such Secretary’s sole discretion, determines necessary to ensure expeditious
construction of the barriers and roads under this section.” (emphasis added)). No such language
appears in § 2808 committing the decision fully to the Secretary’s discretion.
But even if the statute provides “standards to apply,” a decision may still be “committed
to agency discretion by law,” and thus unreviewable, if those standards are not “judicially
manageable.” See Legal Assist. for Vietnamese Asylum Seekers v. Dep’t of State, 104 F.3d 1349,
1353 (D.C. Cir. 1997). Here, the Government suggests that § 2808’s standards are not
“judicially manageable” because the statute “calls for sensitive judgments that Congress plainly
30
intended military officials to make[.]” Defs.’ RGISC Reply at 37; see also Defs.’ CBD Mot. at
59. And on this point, the Court agrees. This portion of Plaintiffs’ § 2808 claim does not meet
the APA’s threshold requirements.
In NFFE v. United States, the D.C. Circuit declined to review claims that the Defense
Secretary’s base closing and realignment decisions were arbitrary and capricious because the
Secretary’s decisions were “committed to agency discretion by law.” 905 F.2d 400, 405 (D.C.
Cir. 1990). Though the court recognized that the Act was not “devoid of criteria”—in fact, the
Act provided “nine specific criteria to be considered in making base closing decisions”— “the
rub [was] that the subject matter of those criteria is not ‘judicially manageable.’” Id. Evaluating
the Secretary’s decision would require the court to pass judgment on the “Secretary’s assessment
of the nation’s military force structure and the military value of the bases.” Id. at 406. This, the
judiciary is “ill-equipped” to do. Id.; El-Shifa, 607 F.3d at 844 (“In military matters in particular,
the courts lack the competence to assess the strategic decision to deploy force or to create
standards to determine whether the use of force was justified or well-founded.”).
Though the Court can objectively determine whether the Defense Secretary is using funds
from § 2808 to engage in “military construction” and whether that construction supports the use
of the armed forces, the statute lacks judicially manageable standards to determine whether the
military construction is “necessary.” That decision crosses the line into military policy, since
review of that decision “would necessarily involve second guessing the Secretary’s assessment
of . . . the military value” of the military construction. See NFFE, 905 F.2d at 406. The Court
therefore will not review whether the Secretary erred in determining, under § 2808, that the
border barrier construction was “necessary.”
31
Next, the Government suggests that the Treasury Secretary’s exercise of authority under
§ 9705 is “committed to agency discretion by law.” It is not. The TFF allows the Treasury
Secretary to expend funds “in connection with the law enforcement activities of any Federal
agency[.]” See 31 U.S.C. § 9705(g)(4)(B). The Government argues that the “broad authority”
granted to the Treasury Secretary to administer the TFF precludes judicial review. Defs.’ RGISC
Mot. at 72–73.
But even if the Secretary’s discretion is broad, it is not limitless. Here again, there is a
distinction between the Court venturing into areas “committed to agency discretion”—such as
how best to use TFF funds—and the Court applying statutory interpretation principles to
determine whether the Secretary’s actions follow Congress’s dictates. The Treasury Secretary
may not use TFF funds for any purpose he chooses. It restricted his use of these particular funds
to expenditures connected to “law enforcement activities of any Federal agency.” 31 U.S.C.
9705(g)(4)(B). “This limitation affords a ‘statutory reference point’ by which the court is able to
review the Secretary’s” decision to use TFF funds for border wall construction. See Milk Train,
Inc. v. Veneman, 310 F.3d 747, 752 (D.C. Cir. 2002). Although the Court cannot venture into
whether it was a wise policy choice to use TFF funds to construct the border wall, it can
competently determine whether the construction qualifies as “law enforcement activities of any
Federal agency.”
2. Plaintiffs Fall Outside the Zone of Interests of All Challenged Statutes, Except
the CAA.
The APA’s threshold requirements ensure that an agency action is properly before the
Court. The “zone of interests” test ensures that the proper plaintiffs are challenging that agency
action. See Phys. for Soc. Respon. v. Wheeler, 359 F. Supp. 3d 27, 38 (D.D.C. 2019) (“[T]he
[zone of interests] test is mainly concerned with which private party may sue to challenge an
32
agency action, not whether any party may sue at all.”). Here, the Government contends that
Plaintiffs are the wrong parties to allege violations of the 2019 Consolidated Appropriations Act
and §§ 2808, 284, 9705, and 8005. Defs.’ Suppl. Mem. Addressing Zone of Interests 7–14
(“Defs.’ ZOI Br.”), CBD ECF No. 48; RGISC ECF No. 67. Except for the CAA, the Court
agrees. The Court will thus dismiss all APA claims related to §§ 2808, 284, 9705, and 8005.
Not every plaintiff can challenge every agency action. APA review is limited to a
plaintiff whose interests “arguably” fall “within the zone of interests to be protected or regulated
by the statute that he says was violated.” Match-E-Be-Nash-She-Wish Band of Pottawatomi
Indians v. Patchak, 567 U.S. 209, 224 (2012) (internal citations omitted). In other words, the
Court must consider whether these Plaintiffs’ interests “systematically, not fortuitously,” align
with the interests Congress had “in mind” when enacting these statutes. Hazardous Waste
Treatment Council v. Thomas, 885 F.2d 918, 924, 927 (D.C. Cir. 1989).
Consider Hazardous Waste, where the D.C. Circuit explained that a trade association for
hazardous waste treatment companies, HWTC, did not fall within the zone of interests of the
Resource Conservation and Recovery Act (“RCRA”). Id. at 924. HWTC posited that its interest
in more stringent treatment standards aligned with the RCRA’s purpose of protecting health and
the environment. Id. But the Circuit discerned that although HWTC’s interests aligned with the
statute’s in that case, this was a fortuitous, not systematic, alignment. Id. at 924–25. HTWC’s
true interest was not in environmental protection—it was “in making money.” Id. at 924. True,
HTWC supported stricter treatment standards in that case, but this was because it was pursuing a
regulation that helped it “get[] more revenue by increasing the demand for [its] particular
treatment services.” Id. The Circuit speculated that its interests would not align if the EPA
pursued regulations under the RCRA that “might be less profitable.” Id. at 924–25. In other
33
words, HTWC was not really policing the RCRA’s interests. Its monetary interests just
happened to coincide momentarily with environmental interests.
Put another way, the zone of interests test requires Plaintiffs to be “reasonable—indeed,
predictable—challengers of the Secretary’s decisions[.]” See Match-E-Be-Nash-She-Wish, 567
U.S. at 227. If their suit is “more likely to frustrate than to further statutory objectives,”
Plaintiffs cannot fall within the zone of interests. Hazardous Waste, 885 F.2d at 922 (quoting
Clarke v. Sec. Indus. Ass’n, 479 U.S. 388, 397 n.12 (1987)).
a. Sections 2808, 284, and 9705
Recall that § 2808 allows the Secretary of Defense to authorize military construction
during a national emergency. 10 U.S.C. § 2808(a). It permits the Secretary to undertake this
construction “without regard to any other provision of law” as long as the construction is
“necessary” to support the use of the armed forces. Id. This military defense statute, the
Government argues, cannot in any way align with RGISC or CBD’s environmental, property,
business, cultural, and recreational interests. Defs.’ ZOI Br. at 10. Instead, the statute seems to
disregard those interests by permitting the DoD to undertake military construction even if it
means trampling on a host of regulations that would normally protect RGISC’s interests. Defs.’
ZOI Br. at 9–10.
Likewise, § 284 allows DoD to assist other agencies seeking to “block drug smuggling
corridors across international boundaries of the United States.” 10 U.S.C. § 284(a), (b)(7). And
under § 9705 the Treasury Secretary can allocate the proceeds of forfeited funds to support law
enforcement activities. 31 U.S.C. § 9705(g)(4)(B). The Government contends that Plaintiffs
have not pointed to anything in these statutes that suggests that Congress meant to protect
34
environmental, recreational, property, or other interests in the land affected by these transferred
funds. Id. at 10–13.
Though RGISC seems to acknowledge that these statutes on their face do not reflect its
asserted interests, it responds that this is not dispositive. 13 RGISC ZOI Br. at 21. Citing Patchak
v. Salazar, 632 F.3d 702 (D.C. Cir. 2001), and Match-E-Be-Nash-She-Wish, 567 U.S. at 227,
RGISC argues that its interest in the property affected by the Secretaries’ actions is enough to
place it within the statutes’ zone of interests. RGISC ZOI Br. at 21–23.
But those cases do not stand for the idea that anyone who experiences adverse effects
from agency action will always fall within a statute’s zone of interests. Rather, those decisions
found that—even though Congress did not intend to protect or benefit plaintiffs—their interests
aligned with the statute’s interests.
Take the Supreme Court’s opinion in Match-E-Be-Nash-She-Wish. There, the
Department of the Interior took property into trust for an Indian tribe to build a casino. 567 U.S.
at 211–12. An owner of nearby property, asserting “economic, environmental, and aesthetic
harms from the casino’s operation,” claimed that the “Secretary lacked authority under § 465 to
take title to the land.” Id. at 212. The Government argued that this landowner fell outside the
statute’s zone of interests because the plaintiff’s interests related to the “land’s use as a casino,”
while “the statute focuses on land acquisition.” Id. at 225 (emphasis in original). But the
Supreme Court disagreed.
The zone of interests test, it explained, simply asks whether the interests raised by the
plaintiffs “fall within the zone protected or regulated by the statute.” Id. at 227 (cleaned up).
13
CBD does not argue that it falls within the zone of interests for §§ 2808, 284, or 8005. Instead, it argues that
these statutes are “intertwined” with its claim under the CAA for which, it argues, it does fall within the zone of
interests. See CBD ZOI Br. at 14–16. The Court will therefore address CBD’s arguments separately. See infra at
III.B.2.c.
35
Plaintiffs fall outside that zone if their “interests are so marginally related to or inconsistent with
the purposes implicit in the statute that it cannot reasonably be assumed that Congress intended
to permit the suit.” Id. at 225 (quoting Clarke, 479 U.S. at 399). Turning to the language of that
statute, the Court determined that the plaintiff “satisfie[d] that standard, because [the statute] has
far more to do with land use than the Government . . . acknowledge[d].” Id. at 225–26. In fact,
“from start to finish, the decision whether to acquire the [property] under § 465 involved
questions of land use.” Id. at 227. In other words, based on the language and context of that
statute, both the statute and the property owner had related interests: the use of the acquired land.
Id.; see also Patchak, 632 F.3d at 705 (holding that the zone of interests “analysis focuses, not on
those who Congress intended to benefit, but on those who in practice can be expected to police
the interests that the statute protects” (emphasis added)).
Not so with RGISC. RGISC says that, like the plaintiff in Match-E-Be-Nash-She-Wish, it
has an interest in the land. RGISC ZOI Br. at 21–22. It thus reasons that it must also fall within
the zone of interests of §§ 2808, 284, and 9705, since these statutes negatively impact the land
along the border. Id. But Match-E-Be-Nash-She-Wish does not automatically place any plaintiff
with an interest in the land affected by a statute within that statute’s zone of interests. The use of
the land was at the heart of the statute at issue in Match-E-Be-Nash-She-Wish. 567 U.S. at 227.
The Court here must consider the language of §§ 2808, 284, and 9705 to determine whether
these statutes contemplate RGISC’s asserted interest. RGISC’s interest in the land is much
further removed from statutes dealing with the use of funds in DHS and Treasury accounts. See
Grocery Mfrs. Ass’n v. EPA, 693 F.3d 169, 179 (D.C. Cir. 2012) (noting that a “food group’s
interest in low corn prices is much further removed from a provision about cars and fuel than a
neighboring land owner’s interest is from a statute about land acquisition”).
36
Nothing in §§ 284 or 9705 reflects an interest in land use. These statutes govern how and
when the Executive Branch may use certain funds—the counterdrug account and TFF. 14 They
do not focus on the acquisition or use of property, as the statute at issue in Match-E-Be-Nash-
She-Wish did. Instead, they solely address the agencies’ use of funds for various law
enforcement activities. So a general claim to an interest in the property where these funds are
expended is not enough to place RGISC within the zone of interests of these statutes. RGISC’s
conservationist, environmental, recreational, and economic interests in the use of the TFF and
counterdrug account funds are “so marginally related to or inconsistent with the purposes
implicit in the statute that it cannot reasonably be assumed that Congress intended to permit the
suit.” Clarke, 479 U.S. at 399.
This is even clearer for § 2808. The language there allowing the Defense Secretary to
disregard other laws when engaging in military construction suggests that the construction may
supersede any interest in the land itself. Section 2808 shows an intent to give the Secretary
maximum flexibility to respond to quickly evolving needs in a national emergency without
regard to the effects of that response. So rather than having interests aligned with the statute, by
seeking to enjoin the barrier construction, RGISC is frustrating the Secretary’s ability to respond
to an emergency. Hazardous Waste, 885 F.2d at 922 (quoting Clarke, 479 U.S. at 397 n.12).
Since RGISC’s interests “may be fundamentally inconsistent with the interests Congress had in
mind when it enacted the statute,” RGISC is a “peculiarly unsuitable proxy for those whom
14
Recall that § 284 states: “The Secretary of Defense may provide support for the counterdrug activities or
activities to counter transnational organized crime of any other department or agency of the Federal Government . . .
[including] [c]onstruction of roads and fences and installation of lighting to block drug smuggling corridors across
international boundaries of the United States.” 10 U.S.C. § 284(a), (b)(7). Section 9705 allows the Treasury
Secretary to use “unobligated balances” in the TFF “for obligation or expenditure in connection with the law
enforcement activities of any Federal agency or of a Department of the Treasury law enforcement organization.” 31
U.S.C. § 9705(g)(4)(B).
37
Congress intended to protect.” Id. at 927 (emphasis in original). This cannot place it within
§ 2808’s zone of interests. 15
b. 2019 Consolidated Appropriations Act
RGISC and CBD do, though, arguably fall within the zone of interests of the CAA. As
with the other statutes, the Government contends that this cannot be so because the CAA
“regulate[s] the relationship between Congress and the Executive Branch regarding federal
spending, and in no way protect[s] the public’s generalized interest in the expenditure of
appropriations.” Defs.’ ZOI Br. at 13. While Plaintiffs’ ability to fall within the CAA’s zone of
interests may be doubtful, “the benefit of any doubt goes to the plaintiff.” Match-E-Be-Nash-
She-Wish, 567 U.S. at 225.
Despite the Government’s argument, neither CBD nor RGISC assert a “generalized
interest in the expenditure of appropriations.” Defs.’ ZOI Br. at 13. Instead, Plaintiffs claim that
their “conservational, recreational, scientific, [and] aesthetic” interests are the same interests
protected by §§ 230–232 and 739 of the CAA. See CBD Suppl. Br. 10–11 (“CBD ZOI Br.”),
CBD ECF No. 49; see also RGISC ZOI Br. at 18.
The Court concludes that the CAA may indeed embrace the conservationist interests that
Plaintiffs seek to protect. Plaintiffs note that § 231’s prohibition on border barrier construction
within five wildlife refuges and parks and § 232’s requirement that DHS confer with local
15
In Sierra Club, the Ninth Circuit determined that Sierra Club satisfied the zone of interests test because it treated
Sierra Club’s statutory claim as a constitutional claim. 929 F.3d at 703. It thus determined that the proper question
was “whether Plaintiffs fall within the zone of interests of the Appropriations Clause, not of section 8005.” Id. The
Court disagrees with this approach. Plaintiffs’ claims here are statutory, not constitutional. As explained infra
III.D., the Supreme Court in Dalton explicitly held that “claims simply alleging that the President has exceeded his
statutory authority are not ‘constitutional’ claims, subject to judicial review.” 511 U.S. at 473 (emphasis added).
Since Plaintiffs allege that Defendants exceeded their statutory authority—not that they were acting pursuant to
constitutional authority or that the statutes themselves are unconstitutional—they have not stated constitutional
claims. See infra III.D. The proper question, then, is not whether their interests align with certain constitutional
provisions but whether they fall within “the zone of interests to be protected or regulated by the statute[s] that
[Plaintiffs say were] violated.” Match-E-Be-Nash-She-Wish, 567 U.S. at 224.
38
officials where it plans barrier construction hint “that Congress considered the [environmental]
impacts of building additional barriers along the southern border.” See RGISC ZOI Br. at 18. If
so, this conservational interest would align with Plaintiffs’. Though it is debatable whether the
CAA protects the interests that Plaintiffs assert, all that Plaintiffs must show is that they are
“arguably within the zone of interests” of the CAA. See Match-E-Be-Nash-She-Wish, 567 U.S.
at 2210. They have done so.
But, the Government retorts, the Court should not even consider the environmental
interests in §§ 231 and 232. Defs.’ Reply Suppl. Mem. Addressing Zone of Interests 11 (“Defs.’
ZOI Reply”), CBD ECF No. 51; RGISC ECF No. 71. The Government observes that Plaintiffs
do not allege violations of those provisions. Id. at 12. So, it concludes, the Court should
consider only whether CBD and RGISC fall within the zone of interests of the challenged
provisions: §§ 230 and 739. Id. at 11–12. Plaintiffs respond that §§ 230 and 739 are “integrally
related” to §§ 231 and 232 and thus these latter two provisions are relevant to the zone of
interests inquiry for §§ 230 and 739. CBD ZOI Br. at 11–13. Plaintiffs are correct.
Recently, the D.C. Circuit reiterated that when considering whether a plaintiff’s interests
fall within a statute’s zone of interests, a court should not “look at the specific provision said to
have been violated in complete isolation, but rather in combination with other provisions to
which it bears an ‘integral relationship.’” Indian River Cty. v. U.S. DOT, 945 F.3d 515, 530
(D.C. Cir. 2019) (quoting Nat’l Petrochemical & Refiners Ass’n v. EPA, 287 F.3d 1130, 1147
(D.C. Cir. 2002)) (cleaned up). Here, Plaintiffs have reasonably shown that §§ 230, 231, 232,
and 739 are all “integrally related.”
Sections 230, 231, and 232 contain Congress’s appropriation of funds to build a segment
of a border wall and restrictions on those funds. Though divided into different sections, the full
39
“context and purpose” of these provisions is to explain the permitted uses of the funds allocated
in § 230. See Indian River, 945 F.3d at 530. Section 739 also bears an “integral relationship” to
these provisions since it preserves the integrity of each appropriation in the CAA. This section—
which prohibits use of funds from “this or any other appropriations Act” to “increase . . . funding
for a program, project, or activity as proposed in the President’s budget request for a fiscal
year”—would be meaningless if not paired with other provisions of the CAA. Sections 230, 231,
and 232 of the CAA put flesh on § 739’s bare mandate. These sections thus bear an “integral
relationship” with the others.
Because CBD and RGISC’s environmental interests appear to align with at least some
interests protected in §§ 231 and 232, the Court cannot say with certainty that Plaintiffs’ interests
are “so marginally related to or inconsistent with the purposes implicit in the statute that it cannot
reasonably be assumed that Congress intended to permit the suit.” See Clarke, 479 U.S. at 399
(1987). CBD and RGISC may therefore assert APA claims for violating the CAA.
c. CBD fails the zone of interests test for §§ 2808 and 8005.
The Government also urges dismissal of CBD’s APA claims because it contends that
CBD does not fall within the zone of interests of §§ 2808 and 8005. Defs.’ ZOI Br. at 9–12.
Indeed, in reply, CBD does not even try to argue that it can fall within the zone of interests of
those statutes. Instead, it claims that since it falls within the zone of interests of the CAA, it
essentially gets a “pass” on meeting the zone of interests test for §§ 2808 and 8005. CBD ZOI
Br. at 14–15. This is because it claims that the Court must decide whether the Defense Secretary
violated §§ 2808 and 8005 for the Court to decide whether he also violated the CAA. Id. at 14
(“[The Court must] resolve defendants’ assertions that the provisions of [§§ 2808 and 8005]
provide alternative funding mechanisms that would essentially provide an exception [to the
CAA].”). But CBD cannot escape the zone of interests requirement so easily.
40
The Court need not determine whether Defendants unlawfully used §§ 2808 and 8005 to
decide whether they violated the CAA, an entirely different Act. CBD’s Complaint alleges that
the Defense Secretary’s and Army Corps of Engineers’ implementing actions under §§ 2808
and 8005 violated the CAA by (1) “exceeding and falling outside of the Act’s monetary and
geographic limitations, respectively, on border wall funding,” CBD Compl. ¶¶ 164, 175, and (2)
violating the CAA’s prohibition that “[n]one of the funds made available in this or any other
appropriations Act may be used to increase . . . funding for a program, project, or activity as
proposed in the President’s budget request for a fiscal year until such proposed change is
subsequently enacted in an appropriation Act, or unless such change is made pursuant to the
reprogramming or transfer provisions of this or any other appropriations Act,” id. ¶¶ 165, 176.
Neither of these two claims requires the Court to separately determine whether
Defendants violated §§ 2808 and 8005. Nor do they allege that the unlawfulness of Defendants’
actions under §§ 2808 or 8005 is what violates the CAA. These claims require the Court to
determine only whether Defendants (1) violated the geographical and monetary restrictions in
§ 230 of the CAA, and (2) used §§ 2808 and 8005 to increase funding for a project proposed in
the President’s budget. The Court can assume that Defendants lawfully used these provisions to
transfer funds to border projects and still consider whether doing so violated the CAA’s
provisions.
Since CBD does not even attempt to explain how it independently falls within the zone of
interests of §§ 2808 and 8005, the Court will dismiss those APA claims.
3. CBD and RGISC State a Claim for a Violation of the CAA § 739.
Even though Plaintiffs fall within the CAA’s zone of interests, the Government argues
that their claims should be dismissed for failure to state a claim. Defs.’ CBD Mot. at 66–69;
41
Defs.’ RGISC Mot. at 78–80. Mindful that the Court must “treat the complaint’s factual
allegations as true and must grant the plaintiffs the benefit of all inferences that can be derived
from the facts alleged,” L. Xia, 865 F.3d at 649 (cleaned up), the Court will not dismiss
Plaintiffs’ claim for a violation of § 739. The Court will, though, dismiss CBD and RGISC’s
claims for a violation of § 230.
Recall that § 230 makes $1.375 billion “available only” for “the construction of primary
pedestrian fencing, including levee pedestrian fencing, in the Rio Grande Valley Sector.” See
CAA § 230(a)(1). CBD claims that the Defense Secretary and Army Corps of Engineers
violated this provision by “exceeding and falling outside [§ 230’s] monetary and geographic
limitations.” CBD Compl. ¶¶ 164, 175. RGISC’s Complaint generally alleges that Defendants’
actions “violate[] the 2019 Consolidated Appropriations Act” without alleging violations of
specific sections of the CAA. See RGISC Compl. ¶¶ 157–160.
In neither Complaint do Plaintiffs allege that the Government violated § 230 by using the
$1.375 billion in a manner or geographic area not permitted under §§ 230, 231, and 232. Instead,
Plaintiffs suggest that Congress’s narrow appropriation of $1.375 billion for border wall
construction in the Rio Grande Valley Sector precludes all other border barrier construction
using other appropriated funds—even if those more general appropriations may also permit
border construction.
For support, Plaintiffs turn to Nevada v. DOE, 400 F.3d 9 (D.C. Cir. 2005). See CBD
Opp’n at 64 n.27; RGISC Opp’n at 67. There, Congress’s 2004 appropriations act gave Nevada
$1 million “to conduct scientific oversight responsibilities and participate in licensing activities
pursuant to the [Nuclear Waste Policy Act].” Id. at 12. Nevada claimed that it was also entitled
42
to other funds for its licensing and scientific oversight activities under another, more general,
provision in the appropriations act. Id. The D.C. Circuit disagreed.
It explained that, based on the general-specific canon of statutory interpretation, “an
appropriation for a specific purpose is exclusive of other appropriations in general terms which
might be applicable in the absence of the specific appropriation.” Id. at 16 (internal quotations
omitted). As an example, the court cited a GAO opinion, where the GAO concluded that “an
appropriation expressly for repairing jails in Alaska, made from a fund comprised of ‘fines,
forfeitures, [and] judgments,’ precluded the financing of repairs to an Alaskan jail with funds
appropriated from the Treasury for the more general purpose of ‘repairs, betterments, and
improvements of United States jails.’” Id. (citing 4 Comp. Gen. 476 (1924)) (alternation in
original). Since Congress had already allocated money for a “specific purpose . . . financing
‘scientific oversight’ and ‘licensing activities,’” Nevada could not increase that appropriation
through other funding sources. Id.
Plaintiffs similarly try to invoke the general-specific canon to allege a violation of § 230.
They suggest that the Government cannot use other general appropriations to construct border
barriers when Congress has already provided a specific appropriation for border barrier
construction in the Rio Grande Valley Sector. See CBD Opp’n at 64 n.27; RGISC Opp’n at 67.
But Plaintiffs misunderstand Nevada and the general-specific canon.
The general-specific canon may be invoked when “both specific and general provisions
cover the same subject,” Norwest Bank Minn. Nat’l Ass’n v. FDIC, 312 F.3d 447, 451 (D.C. Cir.
2002), and when the two provisions are in conflict, see Antonin Scalia & Bryan A. Garner,
Reading Law 183 (2012). When this occurs, “the specific provision is treated as an exception to
the general rule.” Scalia & Garner, supra, at 183. But “[o]nly [the general rule’s] application to
43
cases covered by the specific provision is suspended; it continues to govern all other cases.” Id.
at 184. In Nevada, since both the general and specific appropriation covered the same subject
(scientific oversight and licensing activities), the more specific appropriation created an
exception to the general one. 400 F.3d at 16.
The general-specific canon applies only when the two provisions “cover the same
subject.” Norwest Bank, 312 F.3d at 451 (emphasis added). Yet here no one alleges that the
Government is using general appropriations to inflate the specific appropriation to Rio Grande
Valley Sector barrier construction. Plaintiffs instead allege that the Government is using these
general appropriations to construct additional miles of border barriers never specifically funded
in the CAA. See CBD Opp’n at 63–64 RGISC Opp’n at 67. In other words, the Government is
using general appropriations to fund a different, though similar, subject. This is not the type of
claim where the general-specific canon applies.
In Nevada, the court prohibited supplementing a congressional appropriation with more
general appropriations—for instance, using the $2.5 billion from the § 284 fund to increase the
$1.375 billion allocated to Rio Grande Valley Sector barrier construction project. 16 The court
did not prohibit the use of funds from more general appropriations to finance similar, but
distinct, projects authorized by those funding sources. The prohibition on using general
appropriations for the border wall “only appli[es] to cases covered by the specific provision . . . it
continues to govern all other cases.” Scalia & Garner, supra, at 184.
16
CBD worries that permitting DoD to use § 8005 to fund border wall construction will “render the specific
monetary and geographic limitations placed on border wall construction by the CAA without effect.” CBD Opp’n at
64. For example, “while Congress expressly prohibited border wall construction within all of one, and a portion of
another National Wildlife Refuge . . . the government’s argument here would sanction the use of the [§ 8005] to
construct border walls on numerous protected federal borderlands . . . without restriction.” Id. But if the
Government tried to use § 8005 transfer authority to build border barriers within the geographic limitations of § 231,
it would be using a more general appropriation to increase a specific appropriation, which Nevada v. DOE prohibits.
500 F.3d at 16. The geographic and monetary restrictions in §§ 230–232 are therefore not rendered meaningless.
44
Since Plaintiffs’ Complaints do not allege that the Government has used general funds to
supplement the more specific appropriation to the Rio Grande Valley Sector project, they cannot
rely on the general-specific canon to assert a violation of CAA § 230. And since their claim rests
on this theory, they have not stated a claim for a violation of § 230.
Even though § 230 does not automatically prohibit use of general appropriations for
border wall construction, Congress still holds the reins of these more general appropriations.
And it has the authority, if it wishes, to ensure that the Executive Branch does not misuse these
more general appropriations statutes to finance items that it specifically chooses not to fund.
Thus, Congress included § 739 in the CAA, which states:
None of the funds made available in this or any other appropriations Act may be
used to increase, eliminate, or reduce funding for a program, project, or activity as
proposed in the President’s budget request for a fiscal year until such proposed
change is subsequently enacted in an appropriation Act, or unless such change is
made pursuant to the reprogramming or transfer provisions of this or any other
appropriations Act.
Plaintiffs allege that the Government violated this provision of the CAA and, here,
Plaintiffs have stated a claim. CBD and RGISC allege Defendants used funds from other
appropriations to increase funding for a “project” in the President’s budget: barriers along the
southern border. See CBD Compl. ¶ 176; RGISC Compl. ¶ 157–60. Though the Government
argues that this is not so, the Court must “treat the complaint’s factual allegations as true.” L.
Xia, 865 F.3d at 649. CBD and RGISC have thus stated a claim under the APA for a violation of
CAA § 739.
C. Ultra Vires Claims
1. Plaintiffs May Proceed Under an Ultra Vires Cause of Action.
The main thrust of RGISC’s Complaint is that the Administration acted ultra vires by
using §§ 2808, 284, and 9705 to fund border wall construction. RGISC Compl. ¶¶ 133–41.
45
CBD pleads ultra vires claims in the alternative to its APA claims. CBD Compl. ¶¶ 167–70,
178–81. The Government urges that both sets of claims must be dismissed. Defs.’ CBD Mot. at
69; Defs.’ RGISC Mot. at 81. According to the Government, “the Court can only reach the
merits of the ultra vires claims if APA review is unavailable.” Defs.’ CBD Mot. at 69; Defs.’
RGISC Mot. at 81. But even if the Court did address Plaintiffs’ claims, the Government
suggests Plaintiffs could not survive the heightened level of scrutiny attached to ultra vires
claims. Defs.’ CBD Mot. at 69; Defs.’ RGISC Mot. at 81–82.
CBD and RGISC counter that they have a separate equitable cause of action available to
them—whether styled as a “non-statutory” cause of action, see CBD Opp’n at 65, or a
“traditional equitable” action, see RGISC Opp’n at 61—even if they also have APA claims.
RGISC explains that—long before the enactment of the APA—the Supreme Court found that
when “an official violates the law to the injury of an individual the courts generally have
jurisdiction to grant relief.” Am. Sch. of Magnetic Healing v. McAnnulty, 187 U.S. 94, 108
(1902). This equitable cause of action, they claim, is still available to them because “enactment
of the APA did not repeal the review of ultra vires action recognized long before.” CBD Opp’n
at 65 (citing Chamber of Commerce of the U.S. v. Reich, 74 F.3d 1322, 1328 (D.C. Cir. 1996));
see RGISC Opp’n at 58 (citing Dart v. United States, 848 F.2d 217, 224 (D.C. Cir. 1988)).
RGISC and CBD also contend that their claims are not subject to the heightened level of
scrutiny that the Government tries to apply to their claims. CBD Opp’n at 66; RGISC Opp’n at
61–63. To be sure, RGISC and CBD admit that courts have applied a heightened level of
scrutiny to ultra vires claims in some circumstances. CBD Opp’n at 66; RGISC Opp’n at 62–63.
For instance, the Supreme Court in Leedom v. Kyne, 358 U.S. 184 (1958), permitted “narrow”
ultra vires review for claims “where Congress is understood generally to have precluded
46
review.” Griffith v. Fed. Labor Relations Auth., 842 F.2d 487, 492 (D.C. Cir. 1988). When
plaintiffs bring ultra vires claims where Congress has precluded review, they must show that “(i)
the statutory preclusion of review is implied rather than express; (ii) there is no alternative
procedure for review of the statutory claim; and (iii) the agency plainly acts in excess of its
delegated powers and contrary to a specific prohibition in the statute that is clear and
mandatory.” DCH Reg’l Med. Ctr. v. Azar, 925 F.3d 503, 509 (D.C. Cir. 2019) (internal
quotations omitted). But Plaintiffs argue they are not subject to this “narrow” ultra vires review
since Congress has not precluded review of §§ 2808, 284, 8005, or 9705. CBD Opp’n at 66;
RGISC Opp’n at 61–63.
The Government offers no meaningful response to this. Instead, in reply to RGISC, it
reiterates that “the APA is the proper framework” for RGISC’s claims and RGISC “should not
be allowed to bypass the strictures of the APA by seeking nonstatutory review.” Defs.’ RGISC
Reply at 40. It never tries to respond to RGISC’s argument that its claims are not subject to a
heightened scrutiny. The Government merely says that it relies on Leedom “to illustrate the
point that nonstatutory review requires a higher level of scrutiny[.]” Id. But it misses the point:
RGISC argues that Leedom does not apply to its claim because Congress has not precluded
review.
The Government’s response to CBD’s argument is even less adequate. It addresses
CBD’s argument in one sentence: “Plaintiffs’ ultra vires claim alleging § 2808 violations fail . . .
because the standard to state a nonstatutory ultra vires claim is higher than that [] under the APA,
and such claims ‘rarely succeed.’” Defs.’ CBD Reply 29, CBD ECF No. 33. It again makes no
effort to rebut CBD’s contention that heightened scrutiny does not apply here.
47
The Court doubts that Plaintiffs can bring an equitable claim when a statutory cause of
action is available to it. See Sierra Club, 929 F.3d at 716 (N.R. Smith, J., dissenting) (arguing
that the court should not take the “extraordinary step of implying an equitable cause of action”
when “an avenue for challenging the [agencies’] action exists under the APA—just not for these
Plaintiffs”). But this is the Government’s Motion to Dismiss and it bears the burden of
persuading the Court that Plaintiffs’ claims must be dismissed. See Intelsat USA Sales Corp. v.
Juch-Tech, Inc., 24 F. Supp. 3d 32, 48 n.10 (D.D.C. 2014) (“While it is a plaintiff's burden to
allege facts supporting the elements of its claim, all federal courts are in agreement that the
burden is on the moving party in a Rule 12(b)(6) motion to prove that no legally cognizable
claim for relief exists.” (cleaned up)). The Government has not done so with these claims.
Given the early stage of these proceedings and Plaintiffs’ colorable claim that they have an
equitable cause of action to bring their ultra vires claims, the Court will permit these claims to
proceed.
2. Plaintiffs Need Not Fall Within the Zone of Interests for Ultra Vires Claims.
The Government urges that the Court must dismiss Plaintiffs’ ultra vires claims for a
second reason: they fail to meet the zone of interests for the challenged statutes. Defs.’ ZOI Br.
at 4. In Lexmark, the Supreme Court “presume[d] that a statutory cause of action extends only to
plaintiffs whose interests fall within the zone of interests protected by the law invoked.” 572
U.S. at 129 (internal quotations omitted). But the Supreme Court has never squarely addressed
whether the zone of interests test applies to ultra vires claims. And the D.C. Circuit has
expressed doubt that it would. See Haitian Refugee Ctr. v. Gracey, 809 F.2d 794, 811 n.14 (D.C.
Cir. 1987).
In Haitian Refugee Center, the court announced—admittedly, in dicta—that,
48
Appellants need not, however, show that their interests fall within the zones of
interests of the constitutional and statutory powers invoked by the President in
order to establish their standing to challenge the interdiction program as ultra
vires. Otherwise, a meritorious litigant, injured by ultra vires action, would
seldom have standing to sue since the litigants’ interest normally will not fall
within the zone of interests of the very statutory or constitutional provision that he
claims does not authorize action concerning that interest.
Id.; see also Sierra Club, 929 F.3d at 700 (“[W]e are skeptical that there could be a zone of
interests requirement for a claim alleging that official action was taken in the absence of all
authority[.]”).
Though this dictum is not binding, the Court finds it persuasive. If the Government were
to use a Medicare statute, for example, to justify building the border wall on someone’s property,
it would make little sense to require that person to show that he was a Medicare beneficiary or
provider to argue that the Medicare statute did not permit border barrier construction. It is no
different here where Plaintiffs claim they are injured by the Government’s use of statutes that,
they say, it had no right to use for these purposes. CBD and RGISC thus need not satisfy the
zone of interests test for their ultra vires claims.
3. CBD and RGISC Have Stated Ultra Vires Claims.
The Government finally argues that Plaintiffs’ ultra vires claims must fail because
Plaintiffs have not stated a claim that the Government exceeded its authority under §§ 2808,
8005, 284, 9705, and the CAA. For the reasons already stated, Plaintiffs have stated a claim that
the Government exceeded its authority under § 739 of the CAA, but not § 230. See supra
III.B.3. For the reasons below, the Court finds that CBD has also stated ultra vires claims for
49
violations of §§ 2808 and 8005. RGISC has stated claims for violations of §§ 2808 and 284, but
not § 9705.
a. CBD has stated claims that the Government exceeded its statutory authority
under §§ 2808 and 8005.
CBD’s Complaint alleges that the Defense Secretary’s and Army Corps of Engineers’
“implementing actions to identify, transfer, and obligate emergency funds from military
construction housing to border wall construction,” exceeds the authority given to those
Defendants under the “plain language of [§ 2808].” CBD Compl. ¶¶ 163, 169. Particularly,
CBD contends that the Government is not engaging in “military construction” that is “necessary
to support [the] use of the armed forces” under the statute. 17 Id. ¶¶ 158–59. As defined in
§ 2801, “military construction” must be “carried out with respect to a military installation,”
which includes “a base, camp, post, station, yard, center, or other activity under the jurisdiction
of the Secretary of a military department.” 10 U.S.C. § 2801(a), (c)(4). CBD claims that “[t]he
vast majority, if not all, of the border wall construction that the proclamation would fund occurs
on lands that do not constitute a military installation, and in any event, the border wall is not a
military construction project and thus is not lawfully eligible for emergency military construction
transferred appropriations.” CBD Compl. ¶ 158. And it claims that the border wall in “no way
supports the armed forces.” Id. ¶ 159.
The Government makes two attacks on this claim. First, it suggests that CBD has no
claim because the “broad definition” of “military installation to include non-specified ‘other
activity,’ does not ‘foreclose’ the inclusion of border barrier construction.” Defs.’ CBD Mot. at
17
As explained in III.B.1, the Court will not consider whether the Defense Secretary complied with the § 2808’s
requirements that the construction is “necessary to support [] use of the armed forces.” 10 U.S.C. § 2808(a)
(emphasis added).
50
64. But, as above, the broad parameters of §§ 2808 and 2801 do not preclude review under those
statutes. See supra III.B.1.
Second, the Government argues that CBD’s claims that the lands “do not constitute a
military installation,” that the wall “is not a military construction project,” and that the wall does
not support the armed forces are “nothing more than conclusions unsupported by factual
allegations.” Defs.’ CBD Mot. at 65 (cleaned up). But CBD offers more than “mere
conclusions.” CBD’s Complaint explains that the Defense Secretary and the Army Corps of
Engineers allocated funds to border barrier construction under § 2808. CBD Compl. ¶ 125. It
alleges that this construction will occur in the “highest priority areas,” including the San Diego,
El Centro, Yuma, El Paso, and Laredo sectors. Id. ¶ 128. It alleges that the “vast majority” of
these lands are not military installations. Id. ¶ 158. And it alleges that the border wall is
supporting domestic law enforcement agencies, not the military. Id. at ¶ 160.
Whether CBD’s allegations are true is not currently before the Court. The Court must
“treat the complaint’s factual allegations as true and must grant the plaintiffs the benefit of all
inferences that can be derived from the facts alleged.” L. Xia, 865 F.3d at 649 (cleaned up). The
Court thus concludes that CBD has stated a claim that Defendants exceeded their statutory
authority under § 2808.
CBD also states a claim under § 8005. CBD alleges that Defendants exceeded their
authority under § 8005 by transferring appropriated funds when “the item for which funds [were]
requested has been denied by the Congress.” CBD Compl. ¶ 174. The Complaint alleges that an
item—the additional mileage of the border wall—was denied by Congress in the CAA. Since
Defendants used § 8005 to funnel funds through the counterdrug account to assist DHS with
border construction, see CBD Compl. ¶ 124, CBD claims that this action was unlawful under
51
§ 8005. The Government disagrees with CBD’s characterization of the “item” and “denial.”
Defs.’ CBD Mot. at 65–66. But at this stage of the litigation, the Court is careful to accept
Plaintiffs’ allegations as true. Since CBD plausibly alleges that Defendants used § 8005 to fund
border wall construction and that Congress denied funds for this border wall project, CBD has
stated a claim that Defendants’ actions were ultra vires.
b. RGISC has stated claims that the Government exceeded its statutory
authority under §§ 2808 and 284.
Like CBD, RGISC alleges that the § 2808 does not authorize border wall construction
because it “is not ‘necessary to support [the] use of the armed forces’” and “is not a ‘military
construction project.’” RGISC Compl. ¶ 138. And, as with CBD, the Government responds that
RGISC’s claims are “nothing more than conclusions unsupported by factual allegations.” Defs.’
RGISC Mot. at 77–78. RGISC’s Complaint, though, alleges that the Administration will allocate
§ 2808 funds along the southern border, RGISC Compl. ¶ 92–93, 105, and explains that “the
hundreds of miles along the Mexico border on which Defendants intend to construct a wall do
not constitute a military [installation],” RGSIC Opp’n at 73. RGISC also contends that the
border wall will support civilian agencies, not the military. RGISC Opp’n at 72–73. Later on, it
may prove true that the Government did indeed use § 2808 funds exclusively on military
construction to support the armed forces. But RGISC’s allegations are plausible enough to
overcome a motion to dismiss, especially considering the shifting landscape of these border
barrier funding decisions. See supra III.A.1.a.
For similar reasons, RGISC has plausibly alleged at this stage that the funds transferred
from DoD’s counterdrug account violated the parameters of § 284. That section allows DoD to
“provide support for the counterdrug activities . . . of any other department or agency of the
Federal Government,” 10 U.S.C. § 284(a), including “[c]onstruction of roads and fences and
52
installation of lighting to block drug smuggling corridors across international boundaries of the
United States,” 10 U.S.C. § 284(b)(7). Based on the limited information that RGISC had at the
pleadings stage of litigation, it plausibly alleged that DoD and DHS would not be using the $2.5
billion transferred from this account to build fences at “particular drug smuggling corridors” in
violation of the statute. RGISC Compl. ¶ 139. The Court credits that allegation at this stage and
will not dismiss this claim.
c. RGISC has not stated a claim that the Government exceeded its statutory
authority under § 9705.
RGISC’s Complaint alleges that “[u]se of the Treasury Forfeiture Fund under 31 U.S.C.
§ 9705 to construct the border wall violates the Consolidated Appropriations Act of
2019. . . . The President cannot fund the border wall from the Treasury Forfeiture Fund because
31 U.S.C. § 9705 restricts use of those funds to specified purposes and construction of a border
wall does not meet the requirements of the statute.” RGISC Compl. ¶ 140. At first blush, it is
unclear whether RGISC’s claim is that the Treasury Secretary’s use of § 9705 exceeded his
statutory authority under the CAA or whether RGISC contends that using TFF funds for border
wall construction exceeds the bounds of the TFF. Assuming RGISC intended to bring a distinct
claim that the Treasury Secretary violated § 9705, the Court finds that RGISC has failed to state
a claim. 18
Nothing in RGISC’s Complaint or brief in opposition to the Government’s Motion to
Dismiss explains how the Treasury Secretary exceeded his authority under § 9705. The TFF
permits the Treasury Secretary to allocate “unobligated balances” remaining in the fund to any
“obligation or expenditure in connection with the law enforcement activities of any Federal
18
However, to the extent that RGISC only intended to bring a claim alleging a violation of the CAA, RGISC has
stated a claim for a violation of the CAA § 739. See supra III.B.3. The Court will therefore consider in this
litigation whether the Treasury Secretary’s use of TFF funds violated § 739 of the CAA.
53
agency.” 31 U.S.C. § 9705(g)(4)(B). The Government explained in its motion that construction
of border barriers is at least partially, not exclusively, a law enforcement activity: “Congress has
recognized that barriers prevent unlawful entries by aliens and smuggling of contraband across
the border, see Secure Fence Act of 2006, Pub. L. No. 109-367, §§ 2–3, 120 Stat. at 2638–39,
and thus help enforce the laws that prohibit such activities[.]” Defs.’ RGISC Mot. at 75.
In response, RGISC did not try to explain how the border barrier construction is not “in
connection with law enforcement activities.” Instead, it focused its argument on how the TFF’s
appropriations “cannot overrule the targeted limitations on border wall construction expressed in
the CAA.” RGISC Opp’n at 69. This is a claim that the Treasury Secretary violated the CAA,
not § 9705. Since RGISC makes no effort to explain how the use of TFF funds violated the
terms of § 9705, the Court will dismiss this claim for failure to state a claim.
D. Constitutional Claims
Finally, the Government urges the Court to dismiss CBD and RGISC’s constitutional
claims because “these counts merely recast Plaintiffs’ statutory claims in constitutional terms.”
Defs.’ CBD Mot. at 70 (citing Dalton v. Spector, 511 U.S. 462 (1994)); Defs.’ RGISC Mot. at 82
(same). The Court agrees that Dalton disposes of these claims.
In Dalton, state officials and shipyard employees tried to enjoin the Secretary of Defense
“from carrying out a decision by the President to close the Philadelphia Naval Shipyard.” 511
U.S. at 464. Under the Defense Base Closure and Realignment Act of 1990, an independent
commission would consider military base closure recommendations from the Secretary of
Defense and make a recommendation directly to the President. Id. at 465. The President would
then would either approve or disapprove the recommendation. Id. After the President approved
the closure of the Philadelphia Shipyard, the plaintiffs sought review under the APA, alleging
54
that the President’s decision was unlawful because the Secretary and commission violated the
substantive and procedural requirements of the Act. Id. at 466. The Supreme Court determined
that the plaintiffs could not seek review under the APA since they were challenging the
President’s decision, which is unreviewable under the APA. Id. at 470–71.
The Court then considered whether it could review a separate constitutional claim that the
President acted beyond his statutory authority. Id. at 471–72. After reviewing several prior
related cases, the Court found that no constitutional claim existed. There, “the claim raised [was]
a statutory one: The President [was] said to have violated the terms of the 1990 Act by accepting
procedurally flawed recommendations.” Id. at 474. The Court held that prior Supreme Court
cases “establish that claims simply alleging that the President has exceeded his statutory
authority are not ‘constitutional’ claims, subject to judicial review.’” Id. at 473; see Sierra Club,
929 F.3d at 712 (N.R. Smith, J., dissenting) (“[O]ur cases do not support the proposition that
every action by the President, or by another executive official, in excess of his statutory authority
is ipso facto in violation of the Constitution.” (quoting Dalton, 511 U.S. at 472) (emphasis and
alterations in original)).
Plaintiffs try to distinguish Dalton. First, RGISC suggests that “the holding in Dalton is
narrow and its facts are easily distinguishable from the instant case.” RGISC Opp’n at 56.
Particularly, it contends that the Court’s holding in Dalton hinges on the fact that the President’s
action there “concern[ed] unreviewable presidential discretion,” which is not present here. Id.
Although Dalton did involve a decision committed to the President’s discretion, the Court never
mentioned that fact when it determined there was no constitutional claim. See Dalton, 511 U.S.
at 471–74. Instead, it only mentioned the President’s broad discretion under the statute when it
considered whether it could infer a statutory claim against the President outside the APA
55
context. Id. at 474 (assuming “some claims that the President has violated a statutory mandate
are judicially reviewable outside the framework of the APA . . . [but] such review is not available
when the statute in question commits the decision to the discretion of the President”). 19 For that
reason, RGISC’s attempt to distinguish this case from Dalton on factual grounds fails.
Next, CBD seeks to narrow Dalton by saying that the Government is trying to “transmute
Dalton’s holding that statutory-based claims against the President are not automatically or even
presumptively also constitutional claims into a prohibition on the connection between such
claims.” CBD Opp’n at 67 (emphasis in original). But CBD is “transmuting” Dalton’s holding.
Dalton’s holding is not—as CBD characterizes—that statutory-based claims are not
“automatically” or “presumptively also constitutional claims.” Dalton’s holding is explicit:
“[C]laims simply alleging that the President has exceeded his statutory authority are not
‘constitutional’ claims, subject to judicial review.” 511 U.S. at 473 (emphasis added).
CBD’s Complaint alleges that “[t]he proclamation and agency implementing actions to
identify, transfer, and obligate appropriated funds violate 10 U.S.C. § 2808, DoD FY19 Defense
Appropriations Act, and 2019 Consolidated Appropriations Act.” CBD Compl. ¶ 197. In that
same paragraph, CBD contends that “Defendants’ unlawful transfer and obligation of
appropriated funds for border wall construction violates the Appropriations Clause.” Id. It also
alleges that the President failed to “faithfully execute” those statutes. Id. ¶ 201. Though CBD
insists that its constitutional claims are “specific and separate” from its statutory claims, CBD
19
RGISC cites a line from Chamber of Commerce v. Reich to support its “narrow holding” proposition. See RGISC
Opp’n at 56 (“Dalton’s holding merely stands for the proposition that when a statute entrusts a discrete specific
decision to the President and contains no limitations on the President’s exercise of that authority, judicial review of
an abuse of discretion claim is not available.” (quoting Chamber of Commerce of the United States v. Reich, 74 F.3d
1322, 1331 (D.C. Cir. 1996))). But RGISC pulls that quote from a section of the court’s opinion dealing with
whether the plaintiff had a statutory cause of action against the President outside the APA. See Reich, 74 F.3d at
1330–32 (quoting Dalton, 511 U.S. at 477). Its reference to Dalton cites only the statutory portion of the Supreme
Court’s analysis. Id. It does not discuss the constitutional portion of Dalton.
56
Opp’n at 67–68, the Court agrees with the Government that CBD is merely recasting its statutory
claims.
CBD builds its entire constitutional argument around the allegation that Defendants
unlawfully transferred and obligated appropriated funds. But CBD does not argue that §§ 2808
or 8005 themselves are unconstitutional—merely that Defendants misused those statutes to
circumvent the CAA. And nowhere does CBD dispute that agencies acted using statutory, not
constitutional, authority. At bottom, this is just an allegation that Defendants exceeded their
statutory authority. Similarly, CBD’s Take Care Clause claim essentially alleges that the
executive officials failed to correctly apply and follow § 2808, § 8005, and the CAA. This again
is another way of saying that the President and officials violated those statutes. Under Dalton,
CBD cannot recast these types of claims as constitutional. 511 U.S. at 471–72.
RGISC’s constitutional claims fare no better. RGISC’s Complaint alleges that the
President and executive officials violated the Appropriations Clause and the Constitution’s
Separation of Powers doctrine. RGISC Compl. ¶¶ 142–154. It suggests that its constitutional
claims are distinguishable from its statutory claims because Plaintiffs do not allege “that
Defendants exceeded their statutory authority; rather, Plaintiffs assert that the statutes invoked by
Defendants provide no defense for their unconstitutional actions.” RGISC Opp’n at 55.
But the statutes do provide a valid defense if the officials acted lawfully under each
statute. RGISC does not claim that the statutes themselves are unconstitutional. So if the
Government lawfully transferred and used appropriated funds as permitted by Congress through
§§ 284, 2808, and 9705, then Defendants’ actions could not violate the Appropriations Clause or
the Constitution’s Separation of Powers doctrine. As the Government points out, saying that the
statutes are “no defense” is essentially the same as saying “Defendants’ actions exceed the
57
authority the statutes at issue provide.” Defs.’ RGISC Reply at 43. As explained above, this
argument conflicts with Dalton.
Finally, RGISC suggests that it is not bringing a statutory claim because the President
relied on his constitutional—not just statutory—powers to proclaim a national emergency.
RGISC Opp’n at 55. The President declared a national emergency “by the authority vested in
me by the Constitution and the laws of the United States of America, including sections 201 and
301 of the National Emergencies Act (50 U.S.C. 1601 et seq.).” See Proclamation. RGISC
suggests that the phrase “by the authority vested in me by the Constitution” means that the
President was trying to rely on his Article II as well as statutory powers when he declared an
emergency. RGISC Opp’n at 55.
The Government responds, and the Court agrees, that this argument is meritless. See
Defs.’ RGISC Reply at 42. The reference to the Constitution “simply acknowledges the
President’s constitutional role as chief executive[.]” Id. The NEA requires that the President—
and not some other executive official—declare the national emergency. The Government makes
no claim of extra-statutory authority here, and the Court will not infer such a power on the
President’s behalf. RGISC cannot use this hail Mary argument to allege a constitutional
violation where only a statutory one exists.
IV. CONCLUSION
For these reasons, the Defendants’ Motions to Dismiss will be granted in part and denied
in part. Plaintiffs LCLAA and GreenLatinos will be dismissed as Plaintiffs. President Trump
will be dismissed from both cases as a Defendant. The Court will also dismiss Count II and IV
of Center for Biological Diversity’s Complaint, except for its CAA § 739 claims; it will also
dismiss Counts I, VI, VII, VIII. Counts II, III, and V of Rio Grande International Study Center’s
58
Complaint will be dismissed entirely. The Court will also dismiss RGISC’s § 9705 and NEA
claims under Count I. It will dismiss all of Count IV of RGISC’s Complaint, except for its CAA
§ 739 claim. Separate orders will issue.
2020.04.02
17:21:48_____
-04'00'
Dated: April 2, 2020 TREVOR N. McFADDEN, U.S.D.J.
59