The principal question before us is whether the Environmental Protection Agency [EPA] properly vetoed modifications in Ford Motor Company’s [Ford] existing National Pollutant Discharge Elimination System [NPDES] permit which were proposed by the Michigan Water Resource Commission [MWRC] pursuant to the Federal Water Pollution Control Act of 1972 [FWPCA] §§ 101, et seq., 33 U.S.C. §§ 1251, et seq. Ford has petitioned for review of EPA’s veto of the permit modifications. We hold that the veto of EPA was invalid because it was not based upon any published regulation or guideline or on any express statutory provision.
I
In order fully to understand the issues, a review of the pertinent provisions of the FWPCA is necessary. Congress declared that the objective of the Act'was “to restore and maintain the chemical, physical and biological integrity of the Nation’s waters” § 101(a), 33 U.S.C. § 1251(a). One of ,the national goals of the Act was to eliminate by 1985 “the discharge of pollutants into navigable waters.” § 101(a)(1). Furthermore, Congress proclaimed by the Act its policy to have the States participate in the prevention, reduction and elimination of pollution. § 101(b). Congress also stressed the need for public participation “in the development, revision and enforcement of any regulation, standard, effluent limitation, plan or program established by the Administrator or any State” and required the publication of “regulations specifying minimum guidelines for public participation in such processes.” § 101(e).
The Supreme Court in EPA v. State Water Resources Control Bd., 426 U.S. 200, 204-05, 96 S.Ct. 2022, 2024-25, 48 L.Ed.2d 578 (1976), noted one of the purposes of the Act:
First, the Amendments are aimed at achieving maximum “effluent limitations” on “point sources,” as well as achieving acceptable water quality standards. A point source is “any discernible, confined and discrete conveyance . from which pollutants are or may be discharged.”9 An “effluent limitation” in
turn is “any restriction established by a State or the Administrator on quantities, rates, and concentrations of chemical, physical, biological, and other constituents which are discharged from point sources . . . including schedules of *663compliance.”10 Such direct restrictions
on discharges facilitate enforcement by making it unnecessary to work backward from an overpolluted body of water to determine which point sources are responsible and which must be abated. In addition, a discharger’s performance is now measured against strict technology-based 11 effluent limitations — specified
levels of treatment — to which it must conform, rather than against limitations derived from water quality standards to which it and other polluters must collectively conform.12
The EPA Administrator was required after consultation with the appropriate federal and state agencies and other interested persons, to adopt regulations providing guidelines for effluent limitations no later than October 18, 1973 and annually thereafter. § 304(b)(2), 33 U.S.C. § 1314(b)(2). Once these guidelines were provided they were to be followed when NPDES permits were issued and were “to serve as the basis of the administrator’s veto of objectionable permits.” CPC Int'l, Inc. v. Train, 515 F.2d 1032, 1039 (8th Cir. 1975). Compare E. I. duPont deNemours & Co. v. Train, 430 U.S. 112, 133, n. 24, 97 S.Ct. 965, 51 L.Ed.2d 204 (1977).
The EPA Administrator also was authorized to promulgate effluent limitations for classes and categories of existing point sources which necessarily serve as a basis for denial of a permit. See § 301, 33 U.S.C. § 1311; E. I. duPont deNemours & Co. v. Train, supra; and American Iron and Steel Inst. v. EPA, 526 F.2d 1027, 1041 (3d Cir. 1975).
The Court in the duPont case explained at 130 of 430 U.S., at 976 of 97 S.Ct. the function of the § 304(b) guidelines and at the same time their relation to § 301 regulations:
As we noted earlier, § 304(b) requires EPA to identify the amount of effluent reduction attainable through use of the best practicable or available technology and to “specify factors to be taken into account” in determining the pollution control methods “to be applicable to point sources . . . within such categories or classes.” These guidelines are to be issued “[f]or the purpose of adopting or revising effluent limitations under this Act.” As we read it, § 304 requires that the guidelines survey the practicable or available pollution control technology for an industry and assess its effectiveness. The guidelines are then to describe the methodology EPA intends to use in the § 301 regulations to determine the effluent limitations for particular plants, [footnote omitted]
Congress also provided a plan for implementing water quality standards, which addressed the problem of concentration of pollutants in particular bodies of water, to meet the purposes and goals of the FWPCA.
Section 303(a), 33 U.S.C. § 1313(a) provides for state-adopted water quality standards including those state standards adopted prior to the FWPCA, which standards meet the requirements of the FWPCA unless otherwise determined by the EPA Administrator. For instance, on September 21, 1973 the State of Michigan, pursuant to the FWPCA, approved new water quality standards which went into effect on December 12, 1973. Michigan Water Quality Standards, Michigan Administrative Code *664Part 4; Rule 323.1041, et seq. Because EPA took no action on the Michigan standards, they became the federal water quality standards in that state. See § 303(c)(3), 33 U.S.C. § 1313(c)(3).
Moreover, the EPA Administrator, after issuing notice and holding a public hearing, has authority to establish more restrictive effluent limitations to “discharges of pollutants from a point source or group of point sources” which (even though the effluent limitations under § 301(b)(2) (best available control technology) are applied to the point sources) would still be interfering “with the attainment or maintenance of that water quality in a specific portion of the navigable waters . . . ”. § 302(a) and (b), 33 U.S.C. § 1312(a) and (b).
The Supreme Court in the State Water Resources case also explained a second purpose of the FWPCA, 426 U.S. at 205, 96 S.Ct. at 2025:
Second, the Amendments establish the National Pollutant Discharge Elimination System (NPDES)13 as a means of achiev-
ing and enforcing the effluent limitations. Under NPDES, it is unlawful for any person to discharge a pollutant without obtaining a permit and complying with its terms.14 An NPDES permit
In effect, the NPDES terminates operation of the Refuse Act permit program. §§ 402(a)(4), (5), 402(k), 33 U.S.C. §§ 1342(a)(4), (5), 1342(k) (1970 ed., Supp. IV).
serves to transform generally applicable effluent limitations and other standards — including those based on water quality — into the obligations (including a timetable for compliance) of the individual discharger, and the Amendments provide for direct administrative and judicial enforcement of permits. §§ 309 and 505, 33 U.S.C. §§ 1319, 1365 (1970 ed., Supp. IV). With few exceptions, for enforcement purposes a discharger in compliance with the terms and conditions of an NPDES permit is deemed to be in compliance with those sections of the Amendments on which the permit conditions are based. § 402(k), 33 U.S.C. § 1342(k) (1970 ed., Supp. IV). In short, the permit defines, and facilitates compliance with and enforcement of, a preponderance of a discharger’s obligations under the Amendments.
EPA is empowered by Congress to issue these permits. § 402, 33 U.S.C. § 1342. However, the Act also provides that these permits may be issued by the States. If a State desires to administer the program pursuant to the Congressional policy of State control over water pollution, EPA must first approve the State’s permit program. See § 402(b). Once the Administrator’s approval is given, the State may issue NPDES permits as long as the permits meet the requirements of the FWPCA. Among its duties under the permit program, the State must “provide an opportunity for public hearing before a ruling on each such application [for a permit]” and provide the Administrator with “notice of each application [including a copy thereof] for a permit.” § 402(b)(3) and (4). On October 17, 1973 the EPA Administrator approved the permit program of the State of Michigan. 39 F.R. 26061 (July 16,1974).
In addition to EPA’s possible withdrawal of its approval of a State’s permit program under § 402(c), EPA also retains a veto power over a State’s issuance of an individual permit. Section 402(d)(2)(B) provides:
No permit shall issue ... if the Administrator within ninety days of the date of transmittal of the proposed permit by the State objects in writing to the issuance of such permit as being outside the guidelines and requirements of [the Act], [Emphasis added]
The aggrieved party has ninety days from the date of denial of the permit under § 402 in which to seek review of the Administrator’s action, by petition therefor filed in the appropriate United States Court of Appeals. § 509(B)(1)(F), 33 U.S.C. § 1369(b)(1)(F). '
*665II
Ford operates a stamping plant in Monroe, Michigan. Each day the plant produces 40,000 steel automobile wheels, 16,000 bumpers and numerous coil springs. The plant discharges into the Raisin River less than one mile above the river’s point of entry into Lake Erie, various metals, such as chromium, copper, nickel and zinc.
On June 30, 1971 Ford applied for a NPDES discharge permit for its Monroe plant.1 On the application form at the place noted for intake sources, Ford indicated that it planned to pump 147 million gallons [MGD] of water per day from Lake Erie, treat 10 MGD for the plant millwater supply, and discharge the excess (137 MGD) into a plant-owned canal, a dilution water canal, which in turn discharges the water into the Raisin River. Later, in November 1973, Ford revised its permit application.
In August, 1974 EPA questioned among other things, Ford’s proposed use of the entire Raisin River as a “mixing zone.” Under Michigan Water Quality Standards Rule 1043(n) a “mixing zone” is “a region of a water body wh’ch receives a wastewater discharge of a different quality than the receiving waters, and within which the water quality standards as prescribed by these rules do not apply.” The State of Michigan does not allow use of more than 25% of the stream as a mixing zone “unless it can be demonstrated [to the MWRC] that designation of a greater area or volume of streamflow will allow passage of fish and fishfood organisms so that effects on their immediate and future populations are negligible or not measurable.” Rule 1082 of the Michigan Water Quality Standards.
EPA, based on a bioassay conducted by the MWRC in April, 1973, also questioned Ford’s ability during the Raisin River’s low flow period, to meet the water quality standard concentration limits.
In September, 1974 EPA again questioned the use of the entire width of the Raisin River as a mixing zone and suggested that Ford use only one-half of the river. MWRC soon responded to the EPA suggestion and revised the mixing zone to include “the total flow in the River Raisin from the point of discharge to the Detroit Edison Power Plant intake” (which intake is about 900 feet distant from the Ford discharge). MWRC stated that “[t]he effluent restrictions placed on the Ford Motor Company Monroe Plant discharge are more restrictive than the promulgated guidelines.”
On December 20,1974 the State of Michigan, pursuant to the approval of MWRC, issued Ford the NPDES permit on its Monroe Plant. The permit included the mixing zone as suggested to EPA by MWRC, supra. EPA did not veto the permit and it became effective.
On July 11, 1975 MWRC at Ford’s suggestion, sent to EPA a proposed modification of Ford’s Monroe Plant permit. Among other things, MWRC proposed use of flow augmentation for Ford to meet water quality standards. Ford, in its brief to this Court, stated:
The term “flow augmentation” as described in the proposed permit refers to the mixing of the treated effluent from the plant with other waters (from a mixing canal on the plant property [which water was obtained from Lake Erie]) in order to reduce the concentration of pollutants to levels specified in the permit and to assure compliance with the concentration limits in the water quality standard for the river into which the effluent is ultimately discharged.
The proposed modification was succinctly stated by Jeffrey G. Miller, EPA Deputy Assistant Administrator for Water Enforcement:
The relevant facts are that the best practicable technology will achieve necessary reduction in pounds of pollutants discharged but that the resulting concentration in the volume of process effluent is still greater than concentration limits *666specified in the Michigan Water Quality Standards. The State proposes to allow flow augmentation (dilution) to meet the water quality standard concentration limitations. Monitoring for compliance with the BPT limitations is to be done prior to dilution. Monitoring for compliance with the water quality standards concentration limitations is to be done at the downstream edge of the mixing zone. The mixing zone for purposes of evaluating compliance with the State’s water quality standards is defined as the total flow in the Raisin River from the point of discharge to the Detroit Edison Power Plant intake, a distance of approximately 900 feet. The State concedes that a mixing zone generally should not include an entire river but claims that Michigan biologists are confident that fish passage will be assured if the concentration limits are not exceeded.
Initially, in August, 1975 in a telephone conversation between Harry J. Clemens of EPA’s Region V Permit Branch and Carl Schafer of EPA’s Washington headquarters, EPA believed that use of flow augmentation in the mixing zone and receiving water was proper so long as the best practicable control technology [BPT] currently available was being applied and that the flow augmentation was not being used to “dilute to meet [the best available technology economically achievable]”. In fact, in the next three communications between EPA and MWRC, no objections were raised with respect to the use of flow augmentation.
On October 1, 1975 however, in a letter from Dale S. Bryson, the Region V EPA Deputy Director Enforcement Division, to Roy Schrameck, MWRC’s Division Permit Coordinator, EPA again questioned whether fish passage on the river was possible due to the large size of the mixing zone, and requested studies from MWRC pursuant to Rule 1082 of the Michigan Water Quality Standards to demonstrate fish passage in the river. More importantly, EPA expressed displeasure with the use of flow augmentation to meet the water quality standards. Mr. Bryson said:
The plan to allow the company to treat their metal plating wastes to the BPT level and then dilute with cooling water and possibly flow augmentation to meet water quality standards is in conflict with the intent of the Federal 1972 Amendments and EPA Policy. Dilution should not be utilized unless additional treatment is unavailable or economically unreasonable. Treatment at the BPT level is not usually the point at which additional treatment is considered economically unreasonable. Therefore, please submit any documentation which purports to demonstrate that additional treatment is unreasonable and that flow augmentation is the only available approach. This should be done on a process by process and parameter by parameter basis and should also include the anticipated effect this additional pumpage would have on entrainment and impingement impacts on the fish population in the surrounding nursery and spawning areas and migratory routes.
Despite the above letter, on October 7, 1975 Robert J. Courchaine, Chief Engineer of MWRC formally submitted to EPA (Bry-son) the proposed modifications on Ford’s Monroe Plant permit which included a control of heavy metal concentration that would assure uninterrupted fish passage “accomplished on a continuing basis by low-flow augmentation, an acceptable water quality management tool.” Mr. Courchaine emphasized that the proposed permit modifications required filtration as an additional BPT treatment step.2
*667On October 17, 1975 Paul Zugger, Assistant Regional Engineer of the Bureau of Water Management of MWRC wrote Harry Clemens of EPA, informing him that the chlorine limit in Ford’s permit would be revised to facilitate fish passage in the mixing zone.
On October 20, 1975 Bryson of EPA wrote a letter to Miller of EPA requesting information “as soon as possible as to the national policy” on flow augmentation. Bryson said that his office was opposed to the use of “flow augmentation to achieve lower concentration in the effluent to comply with their Water Quality Standards.”
On November 3, 1975 Mr. Courchaine of MWRC, pursuant to Bryson’s letter to MWRC on October 1, 1975, requested from Ford “documentation to justify the use of flow augmentation” which would “show why treatment beyond [the] present proposal, BPT plus filtration, to meet water quality standards is economically and/or technically unfeasible.”
In response to Bryson’s request of October 20, 1975 concerning the subject of flow augmentation to achieve water quality standards, Miller on January 14, 1976 sent to Bryson his written memorandum, which memorandum concluded that flow augmentation at the Ford Plant was unacceptable. Miller stated:
You ask whether the proposed flow augmentation to meet water quality standards is a valid approach and whether it might set a national precedent for dis-chargers in any area where sufficient water is available for dilution pumping.
To the extent that concentration limitations alone do not control the actual amount of pollutants discharged, they may be generally considered as protection against localized acutely toxic conditions that would endanger aquatic life or serve as a barrier to free passage to up-river reaches. This being the case, achievement of concentration limits per se becomes a requirement for diffusion of the discharge and the specification of a mixing zone indicates the degree of diffusion required.
An important element of the case in question, and any similar case, is that BPT reductions or, ultimately, the BAT reductions of pollutant pounds discharged or any more stringent reductions required by load allocations must be met before flow augmentation may be allowed.
In the instant case, the upstream concentration of pollutants expressed as pounds based on total river flow plus the BPT allowance of pounds of pollutants discharged after dilution exceed the in-stream concentration limitations. We, therefore, do not see flow augmentation as being consistent with the requirements of the in-stream concentration limits contained in the water quality standards.
As regards to national policy and the establishment of precedent, it would not appear that any policy guideline can be laid down either flatly prohibiting or approving flow augmentation to achieve a given water quality standard, nor that the decision for or against such dilution in a given case can be cited as a precedent for a general position.
Please note that there is a definite distinction between the effluent concentration limits and the in-stream concentration limits specified in water quality standards. It must be clear however, that BPT or any more stringent limitation of pounds derived from load allocation of assimilative capacity or other water quality standards must be met before the question of flow augmentation to achieve diffusion oriented limitations can be considered.
Therefore, on January 22, 1976 Mr. Bry-son of EPA informed Mr. Courchaine of MWRC by letter that MWRC’s proposed permit modifications on the Ford Monroe Plant were denied. Bryson stated that *668“[t]reatment to BPT supplemented by dilution to meet water quality standards is not compatible with the requirements of [the FWPCA].” Attached to the letter was Miller’s memorandum of January 14, 1976, supra, as justification for EPA’s action.3 EPA stated to MWRC that Miller’s memorandum made “two important points about the inconsistency of the proposed permit with national policy.” These two points were stated as follows:
1. Flow augmentation is not consistent with the requirements of the in-stream concentration limits contained in water quality standards.
2. BPT or any more stringent limitation of pounds derived from load allocation of assimilative capacity or other water quality standards must be met before the question of flow augmentation to achieve diffusion oriented limitations can be considered.
On April 20, 1976 pursuant to § 509(b)(1)(F) of the Act, 33 U.S.C. § 1369(b)(1)(F), Ford petitioned this Court to review the January 22, 1976 decision of EPA denying the permit modifications for the Monroe Plant.
Ill
Initially, EPA contends that actions taken by MWRC subsequent to its veto of the proposed permit modifications have mooted this case. Specifically, EPA argues that in May 1976 which was subsequent to the filing by Ford of its petition for review in this Court, MWRC decided not to continue to support the issuance of the NPDES permit on the Monroe Plant; agreed that EPA’s refusal to concur in issuance was reasonable; and ordered an adjudicatory hearing to reconsider the need for the permit modifications. Therefore, EPA concludes that judicial review at this time is not appropriate because no controversy exists. It asserts that only if MWRC and/or EPA later refuse to issue the permit modifications, after an adjudicatory hearing record has been developed, should this Court review the action of EPA.
The State of Michigan as an intervenor also requests that this Court defer ruling on EPA’s denial of the permit modifications until the administrative record can be developed through an adjudicatory hearing. The State concedes that it forwarded to EPA the proposed permit modifications without an adequate factual review.
The statute at § 509(b)(1)(F) is quite clear however, in conferring upon this Court jurisdiction to review the EPA Administrator’s action for denial of any permit under § 402. There is no dispute by any party that EPA denied Ford modification on its Monroe Plant permit under § 402(d)(2)(B). We hold therefore, that the Administrator’s action is properly before this Court subject to review. Mianus River Preservation Comm. v. Administrator EPA, 541 F.2d 899, 909 (2d Cir. 1976) and Shell Oil Co. v. Train, 415 F.Supp. 70, 77-78 (N.D.Cal.1976). Cf. E. I. duPont deNemours & Co. v. Train, supra, 430 U.S. at 137, 97 S.Ct. 965. The factual record in this case has been sufficiently developed that this Court can review adequately the action of EPA.
This Court is not reviewing the action of the State of Michigan to issue the revised permit with the proposed modifications, and the FWPCA does not foreclose the State from conducting further hearings in the matter. Nevertheless, Ford is entitled under the statute to have its day in court, and post-denial action by the State of Michigan (which obviously was reacting to EPA’s veto of the proposed permit modifications) neither changes the action already taken by EPA nor moots this case. An actual controversy still exists between Ford and EPA. Accordingly, we will proceed to the merits of this case.
*669IV
As noted above, the EPA Administrator has authority to refuse a NPDES permit proposed by the State if the Administrator, within ninety days of the State’s transmittal of the proposed permit, objects to it in writing “as being outside the guidelines and requirements” of the FWPCA. § 402(d)(2)(B).
Ford argues that this statute provides the Administrator with but narrow review powers over a proposed permit when a State is supervising its own permit program under the FWPCA. Ford contends that EPA is exercising control over the effluent limitations in individual States on a plant-by-plant basis, even though the permits as in the present case, are not inconsistent with the published guidelines and explicit statutory requirements under the Act.
Although the issue as to whether the proposed permit modifications are or are not outside the guidelines and requirements of the FWPCA is the main question to be decided in this case, there is little doubt that EPA has limited review powers over the issuance of a proposed permit submitted by a State pursuant to the State’s own NPDES permit program under § 402. The FWPCA does vest final review authority with the Administrator for permits issued by the states (see the duPont case, supra, at 137 n. 27, 97 S.Ct. 965) but since it was “believed that the states would shoulder the primary burden of issuing permits to individual dischargers,” the “EPA duties were to be restricted to assuring that the state followed the procedural guidelines and to reviewing individual permits of major significance.” Natural Resources Defense Council, Inc. v. Train, 166 U.S.App.D.C. 312, 329, 510 F.2d 692, 709 (1975). See 1972 U.S.Code Cong. & Ad.News, p. 3737. Cf. Mianus River Preservation Comm. v. Administrator, EPA, supra.
The permit involved raises an issue of “major significance,” namely, the use of low-flow augmentation to meet water quality standards. This issue may have a major impact on many dischargers in the United States.
We now proceed to determine whether under § 10 of the Administrative Procedure Act, the Administrator’s action was “arbitrary, capricious, an abuse of discretion or otherwise not in accordance with law.” 5 U.S.C. § 706(2)(A). See Buckeye Power, Inc. v. EPA, 481 F.2d 162, 171 (6th Cir. 1973); Appalachian Power Co. v. Train, 545 F.2d 1351, 1356 (4th Cir. 1976); and Sierra Club v. EPA, 176 U.S.App.D.C. 335, 344-45, 540 F.2d 1114, 1123-24 (1976), cert, denied, 430 U.S. 959, 97 S.Ct. 1610, 51 L.Ed.2d 811 (1977).
Under the “arbitrary and capricious” standard, the Supreme Court in Citizens to Preserve Overton Park v. Volpe, 401 U.S. 402, 416, 91 S.Ct. 814, 823-24, 28 L.Ed.2d 136 (1971) stated:
[T]he court must consider whether the decision was based on a consideration of the relevant factors and whether there has been a clear error of judgment. . Although this inquiry into the facts is to be searching and careful, the ultimate standard of review is a narrow one. The court is not empowered to substitute its judgment for that of the agency, [citations omitted]
Quoted with approval in Buckeye Power, Inc. v. EPA, supra, at 171.
Furthermore, EPA is held to a high standard of articulation. Id., quoting from Environmental Defense Fund, Inc. v. EPA, 150 U.S.App.D.C. 348, 360-61, 465 F.2d 528, 540-41 (1972).
Ford argues that EPA objected to the use of low-flow augmentation to meet water quality standards under the FWPCA solely upon EPA’s own ad hoc policy determination as to effluent limitations at the Monroe Plant. Ford further contends that there are no published regulations, guidelines or specific statutory requirements under the FWPCA prohibiting the use of low-flow augmentation to meet water quality standards. Ford concludes therefore, that EPA exceeded its veto authority when it denied Ford the permit modification because § 402(d)(2)(B) allows EPA to object only to the issuance of NPDES permits which are *670outside the guidelines and requirements of the FWPCA, and not upon the EPA’s private policy determination. In fact, Ford maintains that EPA’s action in the present case denied Ford as a permittee, its statutory right to a hearing on the issues related to the permit. Ford argues that although § 402(b)(3) provides the permittee a right to a hearing under a state’s permit program, EPA in effect renders this statutory right to a hearing a nullity when it declines to issue a NPDES permit for any policy reason, rather than upon “previously promulgated generic guidelines.” We believe that the main thrust of Ford’s argument is well taken.
It is clear from the record in this appeal that EPA had no prior well-established agency policy which prohibited the use of low-flow augmentation to meet water quality standards. In fact, in August 1975 two EPA officials appear to have indicated initially that flow augmentation was proper. When Bryson, the Region V EPA Deputy Director, in October 1975 requested from Miller of EPA a memorandum on flow augmentation, Bryson did not even know the national policy of the agency on flow augmentation. Miller’s response in a memorandum, the basis for EPA’s veto of the proposed permit modifications, did not cite any statutory provision, regulation or guideline. As already noted, Miller stated:
[I]t would not appear that any policy guideline can be laid down either flatly prohibiting or approving flow augmentation to achieve a given water quality standard, nor that the decision for or against such dilution in a given case can be cited as a precedent for a general position.
EPA’s November 1976 memorandum from the office of its General Counsel, on the subject of low-flow augmentation, contains this statement:
The [FWPCA] is silent on the question of whether this alternative is proper and legal as a method of meeting water quality standards based on concentrations.
Nonetheless, this memorandum stated that the EPA policy clearly discouraged the use of flow augmentation or dilution “as an alternative to treatment for meeting water quality standards,” developing its reasoning from analogies on the statutory requirements under § 102(b)(1) of the Act, 33 U.S.C. § 1252(b)(1), and § 110(a)(2)(B) of the Clean Air Act, 42 Ü.S.C. § 1857c-5(a)(2)(B). Such a position would undoubtedly be a good reason for publishing regulations or guidelines in the future on this subject, but it can hardly be a justification for vetoing the proposed permit modifications in the present case when the reasoning was adopted ten months after the veto. This Court can consider only the grounds asserted by EPA in its letter of January 22, 1976 which vetoed the permit modifications.4
The Supreme Court in Burlington Truck Lines, Inc. v. United States, 371 U.S. 156, 168-69, 83 S.Ct. 239, 246, 9 L.Ed.2d 207 (1962), stated, with reference to SEC v. Chenery Corp., 332 U.S. 194, 196, 67 S.Ct. 1575, 91 L.Ed. 1995 (1947):
The courts may not accept appellate counsel’s post hoc rationalizations for agency action; Chenery requires that an agency’s discretionary order be upheld, if at all, on the same basis articulated in the order by the agency itself:
“[A] simple but fundamental rule of administrative law . . . is . that a reviewing court, in dealing with a determination or judgment which an administrative agency alone is authorized to make, must judge the propriety of such action solely by the grounds invoked by the agency. If those grounds are inadequate or improper, the court is powerless to affirm the administrative action . . ..” Ibid.
For the courts to substitute their or counsel’s discretion for that of the Commission is incompatible with the orderly functioning of the process of judicial review. This is not to deprecate, but to *671vindicate (see Phelps Dodge Corp. v. Labor Board, 313 U.S. 177, 197, [61 S.Ct. 845, 853, 85 L.Ed. 1271]), the administrative process, for the purpose of the rule is to avoid “propelling] the court into the domain which Congress has set aside exclusively for the administrative agency.” 332 U.S., at 196, [67 S.Ct. 1575 at 1577, 91 L.Ed. 1995].
See also Atchison, Topeka & Santa Fe Ry. Co. v. Wichita Bd. of Trade, 412 U.S. 800, 806-07, 93 S.Ct. 2367, 37 L.Ed.2d 350 (1973) (Marshall, J., speaking for the plurality). Cf. Hooker Chemical & Plastics Corp. v. Train, 537 F.2d 620, 634, 636 (2d Cir. 1976).
Moreover, EPA’s contention that Ford did not provide the necessary information to EPA or MWRC on the need for flow augmentation at the Monroe Plant and other related arguments cannot support EPA’s veto because such “deficiencies” were not included in any part of EPA’s veto letter. In other words, they are an afterthought.
An examination of the various statutory provisions of the FWPCA indicates that Congress among other things, directed EPA to publish guidelines and regulations setting forth the effluent limitations applicable to point sources. For example, § 304(a) required EPA to publish “criteria for water quality accurately reflecting the latest scientific knowledge” as to most aspects of water pollution and its effect on the aquatic environment, as well as to develop and publish information on the factors necessary to measure, restore and maintain water quality and to protect the aquatic environment. Section 304(b) required EPA to publish “regulations, providing guidelines for effluent limitations.” Section 301(b) required EPA to publish regulations on effluent limitations for point sources. Section 302 directed EPA to publish regulations on water quality related effluent limitations where such limitations were necessary. Section 306(b) ordered EPA to “propose and publish regulations establishing Federal standards of performance for new [pollution] sources within” various industries. Section 307 required EPA to publish toxic and pretreatment effluent standards. These regulations and guidelines if violated, would serve as a basis for vetoing a NPDES permit. Compare E. I. Dupont deNemours & Co. v. Train, 430 U.S. 133 n. 24, 97 S.Ct. 965 (1977) and American Iron and Steel Inst. v. EPA, 526 F.2d 1027, 1041 (3rd Cir. 1975) with CPC Int’l, Inc. v. Train, 515 F.2d 1032, 1039 (8th Cir. 1975). See also §§ 402(a)(1) and (b)(1)(A).
EPA has not met with difficulty in publishing necessary regulations and guidelines within the time framework contemplated by Congress for most industries.
The absence of such regulations and guidelines however, as well as the lack of specific statutory requirements under the Act relating to the use of flow augmentation to meet water quality standards precludes EPA’s denial of a modification on a NPDES permit as to flow augmentation under § 402(d)(2)(B) because such modification is not “outside the guidelines and requirements” of the Act. Cf. Republic Steel Corp. v. Train, 557 F.2d 91 (6th Cir. 1977). Without such guidelines and requirements, EPA could arbitrarily deny permit modifications and render state NPDES permit programs a farce. An industry would have difficulty in preparing its application for a permit without such guidelines. As Ford argued, a permittee would effectively be denied a hearing on issues related to the permit. In other words, EPA would be making decisions unfettered by administrative constraints, despite the congressional policy specifically providing therefor. § 101(e).
In the present case we are unable to find any “guidelines and requirements” in the FWPCA, or guidelines promulgated pursuant thereto upon which EPA on January 22, 1976 relied, to deny the NPDES permit modifications on the Ford Monroe Plant. Therefore, EPA’s veto action under § 402(d)(2)(B) was a clear error in judgment and was arbitrary, capricious and an abuse of discretion. Ad hoc national policy determinations developed through internal agency memoranda standing alone without promulgating regulations or guidelines through public notice and/or an opportunity *672for a public hearing, are not proper procedures for EPA to enforce the FWPCA. See Associated Indus, of Alabama v. Train, 9 ERC 1561, 1568-69 (N.D.Ala. Dec. 6, 1976). Cf. Natural Resources Defense Council, Inc. v. Train, supra, 166 U.S.App.D.C. at 326-27, 510 F.2d at 706-10.
If the State of Michigan conducts further hearings on the proposed permit modifications at the Ford Monroe Plant, Ford and EPA may appear at these hearings to present their respective contentions with respect thereto.
Accordingly, EPA’s veto of the proposed permit modifications at the Ford Monroe Plant is set aside. This case is remanded for further proceedings not inconsistent with this opinion.
§ 502(14), 33 U.S.C. § 1362(14) (1970 ed„ Supp. IV). The terms “pollutant” and “discharge of pollutant” are defined in §§ 502(6), (12), 33 U.S.C. §§ 1362(6), (12) (1970 ed., Supp. IV).
§ 502(11), 33 U.S.C. § 1362(11) (1970 ed., Supp. IV). Section 502(17) defines a schedule of compliance” to be “a schedule of remedial measures including an enforceable sequence of actions or operations leading to compliance with an effluent limitation, other limitation, prohibition, or standard.” 33 U.S.C. § 1362(17) (1970 ed., Supp. IV).
Point sources other than publicly owned treatment works must achieve effluent limitations requiring application of the “best practicable control technology currently available” by July 1, 1977, and application of the “best available technology economically achievable” by July 1, 1983. §§ 301(b)(1)(A), (2)(A), 33 U.S.C. §§ 1311(b)(1)(A), (2)(A) (1970 ed., Supp. IV).
Water quality standards are retained as a supplementary basis for effluent limitations, however, so that numerous point sources, despite individual compliance with effluent limitations, may be further regulated to prevent water quality from falling below acceptable levels. See §§ 301(e), 302, 303, 33 U.S.C. §§ 1311(e), 1312, 1313 (1970 ed., Supp. IV).
§ 402, 33 U.S.C. § 1342 (1970 ed., Supp. IV).
Section 301(a), 33 U.S.C. § 1311(a) (1970 ed., Supp. IV), makes unlawful “the discharge of any pollutant by any person” except in compliance with numerous provisions of the Amendments, including § 402 which establishes NPDES.
. Originally Ford applied for the permit under the Rivers and Harbors Act of 1899, 33 U.S.C. § 407. When the FWPCA was passed, its permit application was deemed a request under the new Act. § 402(a)(5), 33 U.S.C. § 1342(a)(5).
. The proposed permit modification as to discharge limitations beginning on July 1, 1977 states:
These limitations are based on water quality considerations. Flow augmentation, or dilution, can be used to meet these limitations if, and only if, the following treatment facilities, when operated to produce an optimum effluent, are not capable of achieving such limitations:
—destruction of cyanide by oxidation
—reduction of hexavalent chromium to the trivalent form
—neutralization
*667—coprecipitation and settling
—filtration
Such facilities are to be constructed from plans and specifications approved by the Chief Engineer of the Michigan Water Resources Commission.
. On November 8, 1976 EPA through its Office of General Counsel again addressed the subject on the use of low-flow augmentation by point sources to meet water quality standards. In a memorandum addressed to the EPA Regional Administrators and the State NPDES Directors, the General Counsel’s Office expanded upon Miller’s memorandum into a full treatment of the subject. EPA’s arguments against the general use of low-flow augmentation to meet water quality standards are repeated by. its attorneys in its brief before this Court.
. The November 1976 memorandum of EPA's general counsel also failed to cite any published guidelines and regulations on the subject of the use of low-flow augmentation to meet water quality standards.