United States Court of Appeals for the Federal Circuit
03-5152
WILLIAM B. CALDWELL, III and BEN FRANK BILLINGS, III
(for themselves and as representative of a class of
similarly situated persons),
Plaintiffs-Appellants,
v.
UNITED STATES,
Defendant-Appellee.
Jeffrey O. Bramlett, Bondurant, Mixson & Elmore, LLP, of Atlanta, Georgia,
argued for plaintiffs-appellants. With him on the brief were Benjamin E. Fox and Sarah
M. Shalf. Of counsel on the brief was James P. Kelly, Kelly Law Firm, P.C., of Atlanta,
Georgia.
Kathryn E. Kovacs, Attorney, Appellate Section, Environment and Natural
Resources Division, United States Department of Justice, of Washington, DC, argued
for defendant-appellee. With her on the brief were Thomas L. Sansonetti, Assistant
Attorney General; John Smeltzer, Attorney, of Washington, DC; and Kristine S. Tardiff,
Trial Attorney, General Litigation Section, of Concord, New Hampshire. Of counsel on
the brief was Evelyn Kitay, Office of the General Counsel, Surface Transportation
Board, of Washington, DC.
Appealed from: United States Court of Federal Claims
Judge Christine O.C. Miller
United States Court of Appeals for the Federal Circuit
03-5152
WILLIAM B. CALDWELL, III, and BEN FRANK BILLINGS, III,
(for themselves and as representative of a class of
similarly situated persons),
Plaintiff-Appellants,
v.
UNITED STATES,
Defendant-Appellee.
___________________________
DECIDED: December 14, 2004
___________________________
Before NEWMAN, DYK, and PROST, Circuit Judges.
Opinion for the court filed by Circuit Judge DYK. Dissenting opinion filed by Circuit
Judge NEWMAN.
DYK, Circuit Judge.
Appellants William B. Caldwell, III and Ben Frank Billings, III (collectively
“Caldwell”) brought a class action lawsuit seeking compensation for an alleged taking
pursuant to the National Trail Systems Act (the “Trails Act”), 16 U.S.C. § 1247(d). The
Court of Federal Claims held that the appellants’ claim was barred under the applicable
statute of limitations, 28 U.S.C. § 2501, because it accrued more than six years before
the lawsuit was filed. Caldwell v. United States, 57 Fed. Cl. 193 (2003). Because the
appellants’ claim accrued when the exemption proceedings were halted by the issuance
of a Notice of Interim Trail Use or Abandonment (“NITU”), we affirm.
BACKGROUND
I
We have previously held that a Fifth Amendment taking occurs when, pursuant to
the Trails Act, state law reversionary interests are effectively eliminated in connection
with a conversion of a railroad right-of-way to trail use. Preseault v. United States, 100
F.3d 1525, 1543 (Fed. Cir. 1996) (en banc) (“Preseault II”); see also Toews v. United
States, 376 F.3d 1371, 1376 (Fed. Cir. 2004). This case requires us, for the first time,
to determine when the Fifth Amendment takings claim accrues for purposes of the six-
year statute of limitations under the Tucker Act. 28 U.S.C. § 2501 (2000). The
following is a brief summary of the Trails Act, which is described in some detail in
Preseault v. Interstate Commerce Commission, 494 U.S. 1, 7-8 (1989) (“Presault I”), the
case in which the Supreme Court upheld the constitutionality of the Act under the
Commerce Clause.
The Surface Transportation Board (the “STB” or “Board”)1 has authority to
regulate the construction, operation, and abandonment of most railroad lines in the
United States. A railroad seeking to abandon a railroad right-of-way within the
jurisdiction of the STB must either: (1) file a standard abandonment application that
meets the requirements of 49 U.S.C. § 10903; or (2) seek an exemption, under 49
U.S.C. § 10502.2 If the STB approves a standard abandonment application or grants an
1
The Surface Transportation Board is the successor agency to the
Interstate Commerce Commission and assumed control on January 1, 1996. 49 U.S.C.
§ 702 (2000). We use “STB” to refer to both agencies.
2
Authorization of abandonment pursuant to the exemption procedures of
section 10502 is less involved than the standard abandonment proceedings detailed in
section 10903 and can be invoked under the statute when it:
03-5152 2
exemption and the railroad ceases operation, the STB relinquishes jurisdiction over the
abandoned railroad right-of-way and state law reversionary property interests, if any,
take effect. See Preseault I, 494 U.S. at 6-8.
The Trails Act, through a process known as “railbanking,” provides an alternative
to abandoning a railroad right-of-way under sections 10903 and 10502. Section 8(d) of
the Trails Act allows a railroad to negotiate with a state, municipality, or private group
(the “trail operator”) to assume financial and managerial responsibility for operating the
railroad right-of-way as a recreational trail.3 Id. at 6-7. If the railroad and the trail
(1) is not necessary to carry out the transportation policy of section
10101 of [Title 49]; and
(2) either (A) the transaction or service is of limited scope; or (B)
the [full abandonment proceedings are] not needed to protect
shippers from the abuse of market power.
49 U.S.C. § 10502 (a)(2000). In practice, exemption proceedings are appropriate
if no local traffic has run on the line in at least two years. See Nat’l Ass’n of
Reversionary Prop. Owners (“NARPO”) v. STB, 158 F.3d 135, 138 n.4 (D.C. Cir.
1998).
3
Section 8(d), codified at 16 U.S.C. § 1247(d), provides:
(d) Interim use of railroad rights-of-way
The Secretary of Transportation, the Chairman of the Surface
Transportation Board, and the Secretary of the Interior, in administering
the Railroad Revitalization and Regulatory Reform Act of 1976 [45 U.S.C.
§ 801 et seq.], shall encourage State and local agencies and private
interests to establish appropriate trails using the provisions of such
programs. Consistent with the purposes of that Act, and in furtherance of
the national policy to preserve established railroad rights-of-way for future
reactivation of rail service, to protect rail transportation corridors, and to
encourage energy efficient transportation use, in the case of interim use of
any established railroad rights-of-way pursuant to donation, transfer,
lease, sale, or otherwise in a manner consistent with this chapter, if such
interim use is subject to restoration or reconstruction for railroad purposes,
such interim use shall not be treated, for purposes of any law or rule of
law, as an abandonment of the use of such rights-of-way for railroad
purposes. If a State, political subdivision, or qualified private organization
03-5152 3
operator indicate willingness to negotiate a trail use agreement, the STB stays the
abandonment process and issues a notice allowing the railroad right-of-way to be
“railbanked.” 49 C.F.R. § 1121.4. The effect of the notice, if the railroad and
prospective trail operator reach an agreement, is that the STB retains jurisdiction for
possible future railroad use and the abandonment of the corridor is blocked “even
though the conditions for abandonment are otherwise met.” NARPO, 158 F.3d at 139;
see also Presault I, 494 U.S. at 8. Specifically, section 8(d) provides that “such interim
use [for trails] shall not be treated, for purposes of any law or rule of law, as an
abandonment of the use of such rights-of-way for railroad purposes.” 16 U.S.C.
§ 1247(d). Thus, section 8(d) of the Trails Act prevents the operation of state laws that
would otherwise come into effect upon abandonment—property laws that would “result
in extinguishment of easements for railroad purposes and reversion of rights of way to
abutting landowners.” Rail Abandonments—Use of Rights-of-Way as Trails, Ex Parte
No. 274 (Sub-No. 13), 2 I.C.C. 2d 591 (1986). A Fifth Amendment taking occurs if the
original easement granted to the railroad under state property law is not broad enough
to encompass a recreational trail. See Preseault II, 100 F.3d at 1552; see also Toews,
376 F. 3d at 1376.
is prepared to assume full responsibility for management of such rights-of-
way and for any legal liability arising out of such transfer or use, and for
the payment of any and all taxes that may be levied or assessed against
such rights-of-way, then the Board shall impose such terms and conditions
as a requirement of any transfer or conveyance for interim use in a
manner consistent with this chapter, and shall not permit abandonment or
discontinuance inconsistent or disruptive of such use.
03-5152 4
The statute does not specify in detail what procedures are to be followed under the Act.
Pursuant to implementing regulations promulgated by the STB (and developed pursuant
to notice and comment rulemaking), the typical railbanking process begins when a rail
carrier files an abandonment application or, as in this case, a request for an exemption.
49 U.S.C. §§ 10903, 10502; see also NARPO, 158 F.3d at 138.
If the STB approves the request for an exemption, it will publish a notice of
exemption in the Federal Register. 49 C.F.R. § 1121.4(b) (2004). A potential trail
operator may then file a railbanking petition pursuant to 49 C.F.R. § 1152.29(a). Under
section 1152.29(a) the petition must include: (1) a map of the right-of-way, (2) a
statement indicating that the trail operator will assume financial and legal liability for the
right-of-way, and (3) an acknowledgement that the right-of-way may be reactivated for
railroad use in the future.4 If the railbanking petition meets these criteria, and the
railroad agrees to negotiate with the petitioner and so communicates to the STB within
ten days of the filing of the trail use petition, the STB will issue a Notice of Interim Trail
4
Specifically the regulation states that:
The . . . petition must include:
(1) A map depicting, and an accurate description of, the right-of-
way . . . proposed to be acquired or used;
(2) A statement indicating the user’s willingness to assume full
responsibility: for managing the right-of-way; for any legal liability
arising out of the use of the right-of-way . . . and for the payment of
all taxes assessed against the right-of-way; and
(3) An acknowledgement that interim trail use is subject to the
user’s continuing to meet its responsibilities . . . , and subject to
possible future reconstruction and reactivation of the right-of-way
for rail service.
49 C.F.R. § 1152.29(a) (2004).
03-5152 5
Use or Abandonment (“NITU”). 49 C.F.R. §§ 1152.29(b)(2) and (d). This NITU permits
the railroad to discontinue service, cancel tariffs, and salvage track and other
equipment, “consistent with interim trail use and rail banking” without consummating an
abandonment and the NITU extends indefinitely to permit interim trail use once an
“agreement” is reached between the railroad and the trail operator. 49 C.F.R.
§1152.29(d)(1.
In some cases, such as that of the recreational trail at issue in Preseault II, an
interim trail use agreement may in fact be reached prior to the issuance of the NITU.
100 F.3d at 1549-50. In other cases, however, such as the present case, the NITU is
issued after the trail operator and the railroad indicate their intention to negotiate an
agreement but prior to the finalization of an agreement.
Only one NITU is issued once the parties indicate their intent to negotiate for
conversion of the corridor to trail use. If negotiations go as planned and an agreement
is reached, the NITU extends indefinitely for the duration of recreational trail use subject
to the trail operator’s fulfillment of its agreed-upon obligations. The STB retains
jurisdiction for possible future railroad use, and state law reversionary interests that
would normally vest upon abandonment are blocked. Preseault I, 494 U.S. at 8. An
“escape-clause” is also provided by the NITU such that if no agreement is reached
within 180 days, the NITU “automatically converts into an effective . . . notice of
abandonment,” id. at 7 n.5, which permits the rail carrier to “abandon the line entirely
and liquidate its interest.” Id. at 7; see also 49 C.F.R. § 1152.29(d)(1). The regulations
03-5152 6
also allow the parties to request an extension of the negotiating period if more time is
necessary to reach a trail use agreement. 49 C.F.R. § 1152.29(e)(1).5
II
On July 5, 1994, the railroad in this case, Norfolk Southern Railway Company
(“Norfolk”), filed a request for an exemption under 49 U.S.C. § 10505 (now § 10502) to
abandon 7.4 miles of its railroad line located in Columbus, Georgia. Norfolk did not own
this right-of-way in fee simple. Rather, Norfolk owned a railroad right-of-way easement
that burdened larger parcels over which the line ran. On July 26, 1994, the STB
published a notice of abandonment stating that—absent the filing of a petition to stay,
e.g., a railbanking petition—the exemption would become effective August 25, 1994.
The city of Columbus, Georgia (“the City”) filed a railbanking petition and requested
issuance of an NITU on August 15, 1994. After receiving notice from Norfolk indicating
the rail carrier’s willingness to negotiate a trail use agreement with the City, the STB
issued an NITU on August 31, 1994. Before the expiration of the 180-day negotiating
period, the City and Norfolk filed a “Joint Motion for an extension of the negotiation
period provided in the [NITU]” by an additional 180 days. (J.A. at 399.) The City and
Norfolk also requested that the NITU be extended to cover an additional 3.2 miles of
railroad line adjacent to the 7.4 miles covered by the original NITU.6 On June 2, 1995,
5
“The NITU . . . also provide[s] that, if the user [later] intends to terminate
trail use, it must send the Board a copy of the NITU and request that it be vacated on a
specific date.” 49 C.F.R. § 1152.29(d)(2).
6
Norfolk had already obtained permission in a separate proceeding to
abandon the 3.2 mile segment, but had “not removed the tracks or taken any other
action to consummate the abandonment.” (J.A. at 402.) The decision in this prior
proceeding was vacated and the abandonment application for the 3.2 mile segment
reopened pursuant to 49 C.F.R. § 1152.29(e)(1), which provides: “[I]f abandonment has
not been consummated and the railroad is willing to negotiate, the abandonment
03-5152 7
the STB granted both requests. As a result, the proceedings involving the 3.2-mile
segment were consolidated with those involving the original 7.4-mile segment, and the
NITU negotiating period was extended to August 26, 1995.
On August 17, 1995, Norfolk entered into a purchase and sale agreement (“the
purchase agreement”) with the Trust for Public Land (“the TPL”), the entity chosen by
the City to negotiate the railbanking arrangement. Under the purchase agreement,
Norfolk agreed to sell its railroad line right-of-way easement to the TPL for $1,000,000.
Payment of the $1,000,000 (less $500 in earnest money) was to occur at a later date
along with transfer of title to the right-of-way. The purchase agreement did not set a
closing date, but provided that closing would “occur at a mutually agreeable time and
location within three hundred sixty five (365) days.” (J.A. at 415.) However, the
purchase agreement also gave the TPL the right to terminate the purchase agreement
“without liability for damages or for an action for Specific Performance, at any time prior
to the Closing Date upon five (5) days written notice to [Norfolk].” (J.A. at 420.)
The purchase agreement was amended on April 18, 1996, to make clear that the
conveyance was governed by section 8(d) of the Trails Act. On July 1, 1996, a second
amendment was made to indicate the TPL’s intent to assign its rights under the
purchase agreement to the City. The second amendment also required the TPL and
Norfolk to cooperate with the City to file a joint motion to further extend the NITU
deadline. The following day the TPL assigned its rights under the purchase agreement
to the City.
proceeding will be reopened, the abandonment decision granting an application, petition
for exemption or notice of exemption will be vacated, and an appropriate . . . NITU will
be issued.”
03-5152 8
On July 5, 1996, the City informed the STB that a “railbanking agreement” had
been reached, but requested that the NITU deadline be further extended “through the
time of the actual transfer of the corridor to the interim trail manager, which [was]
anticipated to occur on or before November 1, 1996, and to cover any gaps that may
have inadvertently occurred in the railbanking negotiation period.” (J.A. at 441-42.) On
August 6, 1996, the STB granted the City’s motion for an extension “to ensure that the
NITU remains in effect until actual transfer of the corridor to the interim trail manager,”
finding the “extension of the NITU negotiating period [to be] warranted” and that “[a]s
long as an abandonment has not been consummated and the railroad agrees to
negotiate, the Board’s jurisdiction is not terminated.” (J.A. at 446.) Norfolk transferred
its easement for the 10.6 mile railroad line right-of-way by quitclaim deed on October 9,
1996. The deed was recorded on October 11, 1996.
On November 2, 1996, the City filed a “Notification of Railbanking/Interim Trail
Use Agreement” to “formally notify the [STB] that, on October 13, 1996, the railroad
lines [were] transferred to the City of Columbus as interim trail manager pursuant to an
interim trail use/railbanking agreement.” (J.A. at 454.) The notification further stated
that “[a]s a result of the successful completion of this railbanking/interim trail use
transaction, the NITU should now extend indefinitely.” Id. This notice was entered into
the STB record on November 5, 1996.
III
The appellants, Caldwell, own land that was burdened by the easement Norfolk
owned for the 10.6 mile railroad line right-of-way that was the subject of NITU and the
railbanking agreement. On October 7, 2002, Caldwell filed a complaint in the Court of
03-5152 9
Federal Claims pursuant to the Tucker Act, 28 U.S.C. § 1491, on behalf of themselves
and the class of people who also owned land burdened by the railbanked easement.
Caldwell alleged that the government’s conversion of the 10.6 mile railroad right-of-way
to trail use constituted a compensable taking because the conversion extinguished state
law reversionary property interests that would otherwise take effect following the
cessation of railroad activities and subsequent abandonment of the easement for
railroad use of the right-of-way.
On June 30, 2003, the Court of Federal Claims granted the government’s motion
to dismiss the complaint because the six-year statute of limitations under 28 U.S.C.
§ 2501 had run. Caldwell, 57 Fed. Cl. at 204. The court rejected Caldwell’s argument
that its takings claim accrued within the limitations period, when the right-of-way deed
was transferred from Norfolk to the City on October 9, 1996. Id. at 197-99. The Court
of Federal Claims also rejected the government’s position that the statute began to run
upon issuance of the NITU, concluding that the filing of a claim after the issuance of the
NITU but before the identification of “an appropriate public agency to operate the trail”
would be premature, relying on language in our Preseault II opinion. Id. at 200 (citing
Preseault II, 100 F.3d at 1538). Instead, the Court of Federal Claims held that “the
Government taking is fixed upon the signing of the Trail Use Agreement. At that time
the provisions of the NITU become permanent, depriving plaintiffs of their rights in the
land in question.” Id. at 203. Thus, the court held that Caldwell’s takings claim had to
have accrued prior to July 5, 1996, the date the STB was informed that the purchase
agreement had been reached. Id. at 203-04. Because Caldwell’s claim was not filed
03-5152 10
until October 7, 2002, more than six years after July 5, 1996, the claim was barred by
the statute of limitations. Id.
Caldwell filed a motion for reconsideration on July 15, 2003, arguing for the first
time that a parallel class action, filed in a Kansas district court under the Little Tucker
Act, 28 U.S.C. § 1346(a)(2), tolled the statute of limitations on Caldwell’s claim. The
Court of Federal Claims denied the motion for reconsideration on August 11, 2003.
Caldwell timely appealed. We have jurisdiction pursuant to 28 U.S.C. § 1295(a)(3).
DISCUSSION
We review the legal aspects of the determination by the Court of Federal Claims
that the appellants’ claim was barred by the statute of limitations without deference.
Applegate v. United States, 25 F.3d 1579, 1581 (Fed. Cir. 1994).
I
The appellants argue that the Court of Federal Claims erred by holding that their
claim was barred by the statute of limitations. Specifically, Caldwell urges that a taking
under the Trails Act did not occur until the railroad line right-of-way was actually
converted into a trail for interim trail use on October 11, 1996. We disagree.
The taking, if any, when a railroad right-of-way is converted to interim trail use
under the Trails Act occurs when state law reversionary property interests that would
otherwise vest in the adjacent landowners are blocked from so vesting. Preseault II,
100 F.3d at 1552; see also Toews, 376 F.3d at 1376. The question, then, is in the
context of an exemption proceeding, when are state law reversion interests forestalled
by operation of section 8(d) of the Trails Act? We conclude that this occurs when the
03-5152 11
railroad and trail operator communicate to the STB their intention to negotiate a trail use
agreement and the agency issues an NITU that operates to preclude abandonment
under section 8(d).
In implementing the Trails Act, the STB chose to place the primary responsibility
for creating railbanking arrangements on the railroad and trail operator. The Board has
stated that in order “to promote and expedite the Trails Act process” it has “declined to
burden the Trails Act process, unnecessarily either by rule or adjudication.” Policy
Statement on Rails to Trails Conversions, Ex Parte No. 274 (Sub-No. 13B), slip op. at 4
(I.C.C. Jan. 29, 1990). Indeed, in the STB’s view, it “lack[s] discretion to deny or
condition a trails use proposal (other than to ensure that the statutory qualifications are
met).” Id. at 3. As a result, the NITU is issued only after both the railroad and the trail
operator indicate their intent to negotiate a trail use agreement. The process begins
when the railroad initiates the abandonment process (either through standard
abandonment or exemption procedures). 49 C.F.R. § 1152.29; see also NARPO, 158
F.3d at 138. Subsequently, the interested trail operator files a railbanking petition that
meets the statutory requirements reiterated in 49 C.F.R. § 1152.29(a). If the railroad
agrees to negotiate a trail use agreement and so communicates to the STB, the STB
will issue an NITU as a matter of course. 49 C.F.R. § 1152.29(d)(1). Thus, contrary to
the view of the Court of Federal Claims, the NITU is issued only after the trail operator
has been identified, and moreover, has indicated its “willingness to assume full financial
responsibility and liability for the line and to agree to the railbanking condition for
potential future reactivation of rail service.” Policy Statement on Rails to Trails
Conversions, slip op. at 3.
03-5152 12
The issuance of the NITU is the only government action in the railbanking
process that operates to prevent abandonment of the corridor and to preclude the
vesting of state law reversionary interests in the right-of-way. The task of finalizing the
trail use agreement under the Trails Act falls entirely on the railroad and trail operator.
Indeed, the regulations do not even require the railroad and the trail operator to notify
the STB that an agreement has been finalized, although a formal request to vacate the
NITU is required if the operator intends at some future time to terminate trail use. 49
C.F.R. § 1152.29(d)(2).
After a final trail use agreement is reached, the NITU remains in effect indefinitely
and “abandonment cannot be accomplished under the . . . NITU until trail use
terminates (without restoration of rail service).” Policy Statement on Rail
Abandonments—Use of Rights of Ways as Trails, Ex Parte No. 274 (Sub-No. 13), 5
I.C.C. 2d 370, 373 (1989) If, however, “no trail use agreement is reached within 180
days, the . . . NITU converts into a . . . notice of abandonment,” id., which “permit[s] the
railroad to fully abandon the line.” 49 C.F.R. § 1152.29(d)(1); see also Preseault I, 494
U.S. at 7 n.5. If no trail use agreement is reached within 180 days, but the railroad
wishes to continue negotiations with the trail operator rather than consummate
abandonment, the regulations also allow the NITU to be extended, as was done in this
case. 49 C.F.R. § 1152.29(e)(1).
Thus, the NITU operates as a single trigger to several possible outcomes. It
may, as in this case, trigger a process that results in a permanent taking in the event
that a trail use agreement is reached and abandonment of the right-of-way is effectively
blocked. Preseault II, 100 F.3d at 1552; see also Toews, 376 F.3d at 1376.
03-5152 13
Alternatively, negotiations may fail, and the NITU would then convert into a notice of
abandonment. In these circumstances, a temporary taking may have occurred.7 It is
not unusual that the precise nature of the takings claim, whether permanent or
temporary, will not be clear at the time it accrues.8
Indeed, the Supreme Court has previously contemplated precisely this possibility.
In United States v. Dow, 357 U.S. 17 (1958), the Court also grappled with the issue of
fixing the accrual of a takings claim. The question was whether the taking accrued at
the time when the initial judgment of “immediate possession” was obtained, or three
years later, when the government filed a declaration under the Declaration of Taking Act
and title formally passed. At issue was respondent Dow’s ability to collect
compensation from the government, as Dow had purchased the property from the
original owner after the government physically occupied the property, but before the
formal conveyance of title to the government. Dow had argued that no permanent
taking occurred until the filing of the declaration and the formal passage of title, and that
only a temporary taking occurred with the government’s physical occupation of the land.
The Court held that the taking occurred at the earlier date, when the government
entered into physical possession of the land and the owner was deprived of valuable
7
This case does not involve, and we do not herein address, whether the
issuance of the NITU in fact involves a compensable temporary taking when no
agreement is reached.
8
See Seiber v. United States, 364 F.3d 1356, 1365 (Fed. Cir. 2004) (denial
of permit triggers takings claim that, depending on later government action, may be
temporary or permanent); Cooley v. United States, 324 F.3d, 1297, 1299-300 (Fed. Cir.
2003) (same); see also Boise Cascade Corp. v. United States, 296 F. 3d 1339, 1347
(Fed. Cir. 2002) (“[T]he initial denial of a permit is still a necessary trigger for a ripe
takings claim. . . . If the government denies a permit, then the aggrieved party can seek
compensation. If at some point the government reconsiders the earlier denial and grants
03-5152 14
property rights, even though title had not formally passed. Id. at 23. The Court rejected,
as “bizarre,” the argument that there were “two different ‘takings’ of the same property,
with some incidents of the taking determined as of one date and some as of the other.”
Id. at 24. Rather, the Court endorsed a rule similar to the one that we adopt here,
namely that a taking occurs when the owner is deprived of use of the property, there by
physical possession, here by blocking the easement reversion. While the taking may be
abandoned—in Dow, by the government’s possible surrender of possession prior to the
formal passage of title, here by the termination of the NITU—the accrual date of a single
taking remains fixed. As the Court observed in Dow, the government’s decision to
abandon the taking “merely results in an alteration in the property interest taken—from
full ownership to one of temporary use and occupation.” Id. at 26.
We therefore hold that the appropriate triggering event for any takings claim
under the Trails Act occurs when the NITU is issued. The NITU marks the “finite start”
to either temporary or permanent takings claims by halting abandonment and the
vesting of state law reversionary interests when issued. See, e.g., Seiber, 364 F.3d at
1364.
II
Having determined that the appellants’ takings claim accrued on the date when
the NITU was issued, we must now determine if the six-year statute of limitations bars
Caldwell’s claim in this case. We hold that the statute of limitations is a bar here under
either of the two potential dates of NITU issuance. The first NITU was issued on August
31, 1994, for the 7.4-mile segment. The scope of the NITU was enlarged to cover the
a permit (or revokes the permitting requirement), then the aggrieved party can seek
03-5152 15
full 10.6 miles on June 2, 1995. Both of these dates are more than six years before the
complaint in this case was filed, and therefore Caldwell’s claim is barred by the statute
of limitations.
III
Appellants further argue that our decision in Stone Container Corp. v. United
States, 229 F.3d 1345 (Fed. Cir. 2000), would apply to toll the statute of limitations
during the eleven-month pendency of a class action in Kansas filed by Cheryl Swisher in
October 1998.
We conclude that Caldwell has waived on appeal the argument that the statute of
limitations was tolled during the eleven-month pendency of the Swisher class action.
This issue was first raised below not at trial, but in a motion for reconsideration under
Rule 59(a) of the Rules of the Court of Federal Claims. While Caldwell reargues the
merits of the tolling argument on appeal, Caldwell did not meet the rigorous standards
of RCFC 59(a). Motions for reconsideration must be supported “by a showing of
extraordinary circumstances which justify relief.” Fru-Con Constr. Corp. v. United
States, 44 Fed. Cl. 298, 300 (1999), aff’d, 250 F.3d 762 (Fed. Cir. 2000) (table). In
particular, Caldwell fails to refute the court’s finding that raising the tolling argument for
the first time on a Rule 59(a) motion was improper because the pendency of the 1998
Kansas class action was inherently knowable to Caldwell and should have been raised
in response to the government’s motion to dismiss for lack of jurisdiction. In any event,
even with the claimed eleven months of equitable tolling, Caldwell’s filing of October 7,
compensation for a ‘temporary regulatory taking’.") (internal footnote omitted).
03-5152 16
2002, is barred under the six-year statute of limitations, since his claim accrued no later
than June 2, 1995.
CONCLUSION
We hold that the Fifth Amendment taking, if any, under the Trails Act is
accomplished when an NITU is issued and state law reversionary interests that would
otherwise take effect pursuant to normal abandonment proceedings are forestalled.
Because Caldwell’s claim was filed on October 7, 2002, more than six years after either
of the NITUs issued in this case, that claim is barred by the statute of limitations under
28 U.S.C. § 2501. The decision of the Court of Federal Claims dismissing the
appellants’ claim is
AFFIRMED.
COSTS
No costs.
03-5152 17
United States Court of Appeals for the Federal Circuit
03-5152
WILLIAM B. CALDWELL, III, and BEN FRANK BILLINGS, III,
(for themselves and as representative of a class of
similarly situated persons),
Plaintiffs-Appellants,
v.
UNITED STATES,
Defendant-Appellee.
NEWMAN, Circuit Judge, dissenting.
I respectfully dissent from the court's ruling that the statute of limitations
started to accrue from a date before the Caldwell property was "taken" in Fifth
Amendment terms. All authority is contrary to this position.
Neither the dates of the Interstate Commerce Commission's authorization to
the Norfolk Southern Railroad to abandon railroad use and negotiate transfer of the
easement (the ICC's Notices of Intent to Use, whose dates of August 31, 1994 and
June 2, 1995 are selected by the panel majority as the dates on which the statute of
limitations started to accrue), nor the date the City of Columbus notified the ICC of
the intended trail use (the date of July 5, 1996 chosen by the Court of Federal Claims)
03-5152 1
was an actionable taking of property. Neither event vested a cause of action in the
owner of the fee, for neither event was a ripened taking. Neither the federal approval
to discontinue railway operations, nor the ongoing negotiation between the railway
and the city concerning conversion to trail use, vested a right of compensation by
the United States. Thus neither of these events started accrual of the six-year period
of limitations of 25 U.S.C. §2501. See Alliance of Descendants of Texas Land Grants
v. United States, 37 F.3d 1478, 1481 (Fed. Cir. 1994) ("a claim under the Fifth
Amendment accrues when the taking action occurs"); Steel Improvement & Forge
Co. v. United States, 355 F.2d 627, 631 (Ct. Cl. 1966) (same).
A Fifth Amendment taking can indeed flow from a Trails Act conversion of a
railway easement. See Presault v. United States, 100 F.3d 1525, 1553 (Fed. Cir. 1996)
(en banc). However, these plaintiffs could not have prosecuted their claim until the
taking occurred. The taking occurs "when all events have occurred that fix the
alleged liability of the Government and entitle the plaintiff to institute an action."
Seldovia Native Association, Inc. v. United States, 144 F.3d 769, 774 (Fed. Cir. 1998).
Until the easement was transferred to the City of Columbus, Norfolk Southern
Railroad not only continued as owner of the right-of-way, but retained all of the
benefits and obligations of ownership, including the right to exclude, the obligation
to pay taxes, and liability for injury and liens. Until the right of trail use was vested
in the City the cause of action had not ripened, and liability of the government for
compensation was not fixed. Suit at this stage would have simply been premature;
the statute of limitations can not start to accrue before suit could have been filed.
03-5152 2
Under the Trails Act and its implementing regulations, not only must an
"interim trail manager" (the City of Columbus) be approved by the ICC, but the
interim trail manager must "assume full responsibility for management of such
rights-of-way and for any legal liability arising out of such transfer or use, and for the
payment of any and all taxes that may be levied or assessed against such rights-of-
way." 16 U.S.C. §1247(d) (1994). These obligations were not incurred until transfer
of the deed at the legal Closing; until the Closing, the railroad continued to own the
right-of-way, the City of Columbus did not possess and could not occupy the
property, and the City could not convert it into a recreational trail. Until these events
occurred the owners of the fee were not "clearly and permanently deprived," and the
liability of the government to pay compensation was not fixed. See Presault v.
Interstate Commerce Comm'n, 494 U.S. 1, 7-8 (1989) (conversion to trail use may be
subject to Tucker Act remedy for Fifth Amendment taking); Seldovia, 144 F.3d at 774
("the key date for accrual purposes is the date on which Seldovia was clearly and
permanently deprived of the lands it had selected").
On October 9, 1996 the Norfolk Southern Railroad conveyed to the City of
Columbus the deed for the l0.6 mile right-of-way. I cannot agree that the plaintiffs
could have brought earlier suit and obtained compensation for this taking, based on
the ICC's authorizations on August 31, 1994 and June 2, 1995 to Norfolk Southern to
negotiate a Trails Act conversion. These preliminary events did not fix a ripe takings
claim. Negotiation of a possible future event may state a hope and a plan, but it is
not a fixed, ripe, and compensable taking. The owners of the fee had no right to
03-5152 3
compensation based on or at the time of these authorizations to negotiate; thus
these authorizations could not accrue the period of limitations.
Nor were the various negotiating documents involving the City of Columbus,
starting with the document of August 17, 1995 styled "Purchase Agreement," an
actionable taking. This Agreement, from which the City could withdraw on five days'
notice, was amended on April 18, 1996 to add the Trails Act's requirement that the
manager accept financial and legal responsibility; this acceptance in turn was
conditioned on completion of the transaction, and only then would become operable.
Thus an Amendment to the Purchase Agreement stated that "at closing Buyer, its
successor or assignee, shall assume full responsibility for the management of the
right of way, for any legal liability arising out of its transfer or use, and for any
payment of taxes in accordance with the requirements of section 8(d)." Another
amendment dated July 1, 1996 provided that the City and the railroad would jointly
request the ICC (now named the Surface Transportation Board) to extend the time
period for negotiation of a "mutually acceptable interim trial use/railbanking
agreement" through and including November 1, 1996. Thus the Agreement itself
documented its own negotiating status; these documents could not have formed the
basis of a takings action by July 5, 1996, as the Court of Federal Claims held in
selecting the date when the City and the railway jointly requested the time extension
for further negotiation. This Agreement and its amendments were recordations of
the negotiation, not a completed transaction having Fifth Amendment
consequences.
03-5152 4
Taking claims accrue when the liability of the government is fixed, not simply
prospective. In Hopland Band of Pomo Indians v. United States, 855 F.2d 1573 (Fed.
Cir. 1988) the court reiterated that
for the purposes of section 2501, it would appear more accurate to state
that a cause of action against the government has 'first accrued' only
when all the events which fix the government's alleged liability have
occurred and the plaintiff was or should have been aware of their
existence.
Id. at 1577. These events occurred when the City acquired the deed and the right to
occupy and use the property. The Court explained in Nollan v. California Coastal
Comm'n, 483 U.S. 825, 832 (1987), that permanent physical occupation occurs
"where persons are given a permanent and continuous right to pass to and fro."
That did not occur until the Closing, when the deed and the right of occupancy and
use were transferred.1 Before these events the period of limitations did not start to
accrue, for neither the ICC's Notice that permitted negotiation for trail use, nor the
various documents implementing those negotiations, ripened a claim for
compensation. Intentions are rarely actionable; it is the consummation that accrues
legal rights.
The panel majority places great weight on United States v. Dow, 357 U.S. 17
(1958). In Dow the Court held that a taking occurs upon possession and occupancy
of the property, and that a subsequent filing under the Declaration of Taking Act did
1 It is not necessary to decide whether the date of accrual of the limitations
period was the transfer of the deed at the Closing on October 9, 1996, or its recordation a
few days later, or the Notification from the City of Columbus to the ICC on November 5,
1996, because this suit was filed within six years of the earliest of these dates.
03-5152 5
not negate the effect of the earlier possession and occupancy. Id. at 22. In Dow the
government in 1943, by eminent domain, obtained a judgment of "immediate
possession" of a right-of-way through a larger tract of land, entered into immediate
possession of the right-of-way, and within ten days began laying a pipeline through
the tract. In 1945 the owners conveyed the entire tract to Dow, including their right
to any compensation for the land taken by eminent domain; and in 1946 the
government filed in court a declaration of taking, obtained title to the right-of-way,
and deposited estimated compensation with the court. The issue was Dow's rights
under the Assignment of Claims Act; there was no issue of the running of a statute
of limitations. The Court held that the taking occurred when the United States
entered into possession in 1943, when the government "entered and appropriated
the property to public use," id. at 23, and that the taking neither awaited the later
transfer of title to the right-of-way, nor was negated by the later proceeding. The
Court stressed that the determinative event of the taking was whether "the
Government has already entered into possession." Id. at 25. This case well
supports the plaintiffs herein.
It is not disputed that the City of Columbus did not possess and occupy the
property, and had no authorization or right to do so, until the Closing and transfer of
the deed. Although the panel majority relies heavily on Dow, the analogy is not apt.
In Dow the government was in full possession of the property it had obtained by
condemnation decree and was actively building the pipeline; thus the Court held that
the taking had occurred. In contrast, the authorization from the ICC to the Railway
03-5152 6
and the City to start to negotiate did not change the possession and occupancy of
the easement. My colleagues' view that it is irrelevant when title passes does not
mean that the property was earlier taken; that is not the rule of Dow. To the contrary,
Dow strongly reinforces the position that the Norfolk Southern right-of-way was not
taken and compensable until there was a transfer of possession and occupancy, an
event that did not occur until the date of Closing and the transfer of the deed.
Thus I must, respectfully, dissent from the court's conclusion that the statute
of limitations started to accrue when the parties told the ICC that they were
negotiating for the purpose of reaching a trail use agreement.
03-5152 7