2013 IL App (1st) 130744
FOURTH DIVISION
September 19, 2013
No. 1-13-0744
1324 W. PRATT CONDOMINIUM )
ASSOCIATION, )
) Appeal from the
Plaintiff-Appellee, ) Circuit Court of
v. ) Cook County, Illinois,
) County Department,
PLATT CONSTRUCTION GROUP, INC., ) Law Division.
)
Defendant-Appellee )
) No. 08 L 014415
)
(EZ Masonry, Inc., ) Honorable
) Ronald F. Bartkowitz,
Defendant-Appellant). ) Judge Presiding.
JUSTICE FITZGERALD SMITH delivered the judgment of the court, with opinion.
Presiding Justice Howse and Justice Lavin concurred in the judgment and opinion.
OPINION
¶1 This is a construction defect lawsuit arising from the faulty construction of a
residential condominium building built in 2005 at 1324 W. Pratt Boulevard, in Chicago, Illinois.
The plaintiff-appellee, 1342 W. Pratt Condominium Association (hereinafter, the condominium
association) seeks to recover damages from the general contractor, Platt-Construction Group, Inc.
(hereinafter, Platt), and the masonry subcontractor, the defendant-appellant, EZ Masonry Inc.,
(hereinafter, EZ Masonry). This cause has already been before this appellate court twice. In this
interlocutory appeal, we are asked to decide two questions of law certified by the circuit court
pursuant to Illinois Supreme Court Rule 308 (Ill. S. Ct. R. 308 (eff. Feb. 26, 2010)): (1) "whether
the relevant date for determining the insolvency of a general contractor [Platt] for purposes of the
No. 1-13-0744
exception set forth in Minton v. Richard Group of Chicago[,116 Ill. App. 3d 852 (1983),] is the
date that a [c]omplaint (or latest amended complaint) is filed against the general contractor, or
when the construction is completed; and (2) whether [the condominium association] may pursue
[its] claims against EZ Masonry in this cause when Platt *** is insolvent, but is in good standing
with limited assets." For the reasons that follow, we hold that the relevant date for determining
the insolvency of a general contractor is not the date construction is completed but, rather, the
date that an amended complaint is filed alleging the general contractor's insolvency, and that in
this particular situation, the condominium association may proceed against EZ Masonry since
Platt is insolvent.
¶2 I. BACKGROUND
¶3 Since this cause originated about a decade ago, and includes voluminous
motion practice, for purposes of brevity we set forth only the relevant factual background and
procedural history. Between 2004 and 2005, the developer, 6801 N. Wayne LLC (hereinafter,
Wayne) engaged in the construction of an eight-unit residential building located at 1324 W. Pratt
Boulevard in Chicago, Illinois (hereinafter, the building). In order to construct the building,
Wayne hired Platt as its general contractor, and Platt in turn hired several subcontractors,
including relevant for this appeal, EZ Masonry. After Platt completed the building in March
2005, Wayne sold the individual eight units as condominiums. On November 28, 2005, Wayne
was involuntarily dissolved.
¶4 Soon thereafter, the unit owners discovered water leaks around windows, doors, ceilings
and vents in their units and common areas of the building. The owners of the individual units
2
No. 1-13-0744
formed the plaintiff condominium association to represent their collective interests. Starting in
2008, the condominium association filed a series of complaints against several defendants,
attempting to recover damages caused by the construction defects. The first complaint was filed
against Wayne, Platt and the roofing subcontractor (which is not a party to this appeal). The
second amended complaint was filed on December 14, 2009, and named EZ Masonry as a
defendant. Since then, relevant to this appeal, the litigation has proceeded against both Platt and
EZ Masonry on, inter alia, a breach of implied warranty of habitability claim.
¶5 On June 9, 2009, Platt filed a motion to dismiss pursuant to section 2-619 of the Illinois
Code of Civil Procedure (Code) (735 ILCS 5/2-619 (West 2008)), arguing that it could not be
held liable under an implied warranty of habitability theory because that warranty applies to only
"builder-vendors,", i.e., builders that not only construct a residential building but are also
involved in the sale of the residence to the purchasers. The circuit court agreed with Platt and
granted its motion to dismiss on September 11, 2009. The condominium association appealed,
and on September 28, 2010, we reversed the order of the circuit court, ruling that "the warranty
applies to builders of residential homes regardless of whether they are involved in the sale of the
home." 1324 W. Pratt Condominium Ass'n v. Platt Construction Group, Inc., 404 Ill. App. 3d
611, 618 (2010) (hereinafter Pratt I).1
¶6 After the cause was remanded to the circuit court, on December 20, 2010, the
condominium association filed its third amended complaint alleging a breach of the implied
1
EZ Masonry filed a separate motion to dismiss (735 ILCS 5/2-619 (West 2008)) on June
17, 2010, but that motion was stayed until Pratt appealed the dismissal of its action against Platt.
3
No. 1-13-0744
warranty of habitability against, inter alia, Wayne, Platt and EZ Masonry. In January 2011, Platt
and EZ Masonry both filed a motions to dismiss pursuant to section 2-619 of the Code (735 ILCS
5/2-619 (West 2008)). EZ Masonry argued that while the general contractor (Platt) was solvent,
it was improper to bring a claim for the breach of the implied warranty of habitability against a
subcontractor, such as itself. In support of this contention, EZ Masonry cited Minton v. Richards
Group of Chicago, 116 Ill. App. 3d 852 (1983). Platt argued that the individual condominium
owners could not avail themselves of the implied warranty of habitability since they explicitly
waived that warranty in their condominium purchase agreements. EZ Masonry orally joined in
Platt's argument regarding waiver.
¶7 On May 19, 2011, the circuit court granted Platt's and EZ Masonry's motions to dismiss
based upon the waiver of the implied warranty of habitability, but specifically denied EZ
Masonry's claim that while Platt was solvent, the condominium association could not go forward
with its claim against EZ Masonry. In doing so, the circuit court noted that Pratt I modified
Minton and extended the implied warranty of habitability to subcontractors without the need to
first show that the purchaser had no recourse to the builder and/or vendor.
¶8 The case was appealed again to this court. On June 21, 2012, we reversed the circuit
court's decision, inter alia, holding that so long as Platt remained solvent, the condominium
association could not proceed against EZ Masonry. 1324 W. Pratt Condominium Ass'n v. Platt
Construction Group, Inc., 2012 IL App (1st) 111474 (hereinafter Pratt II). In doing so, we
explicitly rejected the reasoning of the circuit court and reiterated that our decision in Pratt I
nowhere extended or modified Minton to include all subcontractors, regardless of the solvency of
4
No. 1-13-0744
the builder-vendor.
¶9 On remand to the circuit court, on January 8, 2013, the condominium association filed its
fourth amended complaint against Pratt and EZ Masonry, again alleging a breach of the implied
warranty of habitability. The allegations in the fourth amended complaint were identical to the
allegations in the third amended complaint except for additional language asserting that Platt is
insolvent. After limited discovery, on February 27, 2013, the circuit court held that "Platt is
insolvent, but remains a corporation in good standing with limited assets." The circuit court also
held that the relevant date for determining the insolvency of a general contractor such as Platt is
the date on which a complaint is filed against the general contractor; in this case, the fourth
amended complaint, which was filed on January 8, 2013. The circuit court then certified two
questions of law for interlocutory appeal pursuant to Illinois Supreme Court Rule 308, finding
that as there were "substantial grounds for difference of opinion" as to these two questions and
that answers to those two questions by this appellate court could "materially advance the ultimate
termination of litigation." Ill. S. Ct. R. 308 (eff. Feb. 26, 2010). As already noted above, the
certified questions are as follows: (1) "whether the relevant date for determining the insolvency
of a general contractor for purposes of the exception set forth in Minton v. Richard Group of
Chicago[,116 Ill. App. 3d 852 (1983)] is the date that a [c]omplaint (or latest amended
complaint) is filed against the general contractor, or when the construction is completed; and (2)
whether [the condominium association] may pursue [its] claims against EZ Masonry in this cause
when Platt *** is insolvent, but is in good standing with limited assets."
¶ 10 II. ANALYSIS
5
No. 1-13-0744
¶ 11 We begin by setting forth the scope of review that we must apply in all Rule 308 appeals.
It is well settled that absent a statutory exception or rule of the supreme court, courts of appeal
have jurisdiction to review only final judgments entered in the circuit court. Walker v. Carnival
Cruise Lines, Inc., 383 Ill. App. 3d 129, 133 (2008). Illinois Supreme Court Rule 308, however,
provides one such exception and permits for permissive appeal of an interlocutory order certified
by the trial court as involving a question of law as to which "there is substantial ground for
difference of opinion" and "where an immediate appeal may materially advance the ultimate
termination of the litigation." Ill. S. Ct. R. 308 (eff. Feb. 26, 2010); In re Estate of Luccio
2012 IL App (1st) 121153 ¶ 17 (citing Brookbank v. Olson, 389 Ill. App. 3d 683, 685 (2009)).
However, this rule is not intended to be a mechanism for expedited review of an order that
merely applies the law to the facts of a particular case. In re Estate of Luccio, 2012 IL App (1st)
121153, ¶ 17; see also Walker, 383 Ill. App. 3d at 133; Morrissey v. City of Chicago, 334 Ill.
App. 3d 251, 258 (2002). Nor does it permit us to review the propriety of the order entered by
the lower court. In re Estate of Luccio, 2012 IL App (1st) 121153, ¶ 17; see also Walker, 383 Ill.
App. 3d at 133. Rather, we are limited to answering the specific question certified by the trial
court. Moore v. Chicago Park District, 2012 IL 112788, ¶ 9; see also Bajalo v. Northwestern
University, 369 Ill. App. 3d 576, 580 (2006) ("In [a Rule 308] interlocutory appeal, the court's
examination is limited to the questions certified by the trial court, and a reviewing court will
ordinarily not expand the certified question under review to answer other questions that could
have been included but were not."). As with all questions of law, we review certified questions
presented for interlocutory appeal under a de novo standard. Moore, 2012 IL 112788, ¶ 9; see
6
No. 1-13-0744
also Bajalo, 369 Ill. App. 3d at 580.
¶ 12 A. Timing
¶ 13 Turning to the merits, we first address what time should determine the
viability/insolvency of the general contractor, so as to permit the aggrieved purchaser to proceed
against the subcontractors. EZ Masonry argues that the proper time to determine the solvency of
the general contractor (Platt) should be the date of the filing of the initial complaint, in this case
December 31, 2008, and not, as the circuit court found, the date of the last amended complaint,
January 8, 2013. EZ Masonry contends that there must be some time limit to the exposure of
subcontractors in claims for the breach of the implied warranty of habitability based upon the
insolvency of a general contractor. It further argues that in this case it is unfair to use the date of
the fourth amended complaint to determine Platt's insolvency, since that amended complaint was
filed some 8 years after the construction of the building and 4 ½ years after the commencement
of the litigation. We strongly disagree.
¶ 14 EZ Masonry's argument ignores the public policy behind the judicial creation
of the implied warranty of habitability. As we have articulated twice before in both Pratt I and
Pratt II, the implied warranty of habitability is a "creature of public policy" that was explicitly
designed by our courts "to protect purchasers of new houses upon discovery of latent defects in
their homes." Redarowicz v. Ohlendorf, 92 Ill. 2d 171, 183 (1982). The rationale for the
application of the policy has been threefold. See Board of Directors of Bloomfield Club
Recreation Ass'n v. The Hoffman Group, Inc., 186 Ill. 2d 419, 425-26 (1999); VonHoldt v. Barba
& Barba Construction, Inc., 175 Ill. 2d 426, 430-31 (1997); Redarowicz, 92 Ill. 2d at 183;
7
No. 1-13-0744
Petersen v. Hubschman Construction Co., 76 Ill. 2d 31, 39-40 (1979). First, purchasers of new
homes "generally do not [have] the ability to determine whether the houses they have purchased
contain latent defects." Bloomfield Club, 186 Ill. 2d at 425. Second, "[t]he purchaser needs this
protection because, in most cases, [he or she] is making the largest single investment of his or her
life and is usually relying upon the honesty and competence of the builder, who, unlike the
typical purchaser, is in the business of building homes." Bloomfield Club, 186 Ill. 2d at 425.
And finally, "[i]f construction of a new house is defective, its repair costs should be borne by the
responsible builder-vendor who created the latent defect," rather than the innocent and
unknowing purchaser. Redarowicz, 92 Ill. 2d at 183.
¶ 15 On the basis of this rationale, our courts have steadily expanded the application of the
warranty to serve the underlying public policy of protecting new homeowners and holding those
responsible for the construction of the buildings accountable for latent defects in residences that
they construct. See, e.g., Redarowicz, 92 Ill. 2d at 183 (expanding the class of plaintiffs with
standing to sue for a violation of the implied warranty of habitability to successive purchasers);
VonHoldt, 175 Ill. 2d at 430 (expanding the type of structures covered by the warranty to include
new additions to existing buildings); McClure v. Sennstrom, 267 Ill. App. 3d 277 (1994)
(expanding the warranty of habitability to include a house built on a preexisting foundation);
Briarcliffe West Townhouse Owners Ass'n v. Wiseman Construction Co., 118 Ill. App. 3d 163
(1983) (expanding the warranty to a vacant common lot of a townhouse development); Herlihy v.
Dunbar Builders Corp., 92 Ill. App. 3d 310 (1980) (expanding the warranty to apply to common
elements of condominiums); Park v. Sohn, 89 Ill. 2d 453 (1982) (expanding the class of potential
8
No. 1-13-0744
defendants to include a builder-vendor that is not in the business of building); Hefler v. Wright,
121 Ill. App. 3d 739 (1984) (expanding the class of potential defendants to include a builder that
erected a house manufactured by another party); Minton, 116 Ill. App. 3d at 855 (extending the
warranty to subcontractors where a builder-vendor is insolvent and the purchaser has no available
recourse against it); Tassan v. United Development Co., 88 Ill. App. 3d 581 (1980) (extending
the warranty to developers).
¶ 16 Adhering to these same public policy principles, in Minton, we specifically expanded the
application of the implied warranty of habitability to subcontractors to "protect innocent
purchasers" who had "no recourse to the builder-vendor and [had] sustained loss due to the faulty
and latent defect in their new home caused by the subcontractor." Minton, 116 Ill. App. 3d at
855.
¶ 17 EZ Masonry's position that insolvency of the general contractor should be determined on
the date of filing of the initial complaint goes against the very public policy intended to protect
"innocent purchasers" from latent defects that they are likely to find many years later. What is
more, it ignores the reality that a general contractor may become insolvent after the filing of the
initial lawsuit, and even perhaps as a result of that lawsuit. In fact, in Minton, wherein we
expanded the warranty to apply to subcontractors responsible for the latent defects if no recourse
could be had against the builder-vendor, the plaintiffs did not pursue their claim against the
subcontractor in their original complaint. Minton, 116 Ill. App. 3d at 853. Rather, they did so in
their second pleading (their first amended complaint) and only after the general contractor was
dissolved as a corporation and found to be insolvent. See Minton, 116 Ill. App. 3d at 853.
9
No. 1-13-0744
Accordingly, we fail to see how EZ Masonry can argue that the proper date for determining
insolvency of the general contractor is the date of the initial complaint. See Minton, 116 Ill. App.
3d at 853; see also Dearlove Cove Condominiums v. Kin Construction Co., Inc., 180 Ill. App. 3d
437, 440 (1989) (permitting the plaintiffs to amend their complaint alleging the breach of the
implied warranty of habitability to include the subcontractors, over two years after the filing of
the initial complaint against the general contractor, where the general contractor became
insolvent; complaint was permitted to proceed against the subcontractors even though it was not
filed within the applicable two year statute of limitations for such claims, since the original
complaint against the general contractor was timely filed); see also 15 Solomon Gutstein, Eileen
Murphy & Joshua Gutstein, Illinois Practice (2d ed., October 2012) Illinois Practice, §13:64 ("If
the builder-vendor is insolvent, a new cause of action [against the subcontractor] arises on the
date of insolvency." (emphasis added)).
¶ 18 B. The Level Insolvency Required
¶ 19 We next turn to the second certified question, i.e., whether the condominium association
may pursue its claim against EZ Masonry, when Platt is "insolvent, but in good standing with
limited assets." EZ Masonry contends that it would be unfair to permit the condominium
association to pursue its claim against EZ Masonry where Platt is a viable corporation that has
succeeded in defending itself in this litigation for years. Citing to three decisions by this
appellate court, Minton, 116 Ill. App. 3d at 855, Washington Courte Condominium Ass'n-Four v.
Washington-Golf Corp., 150 Ill. App. 3d 681 (1986) and Pratt II, 2012 IL App (1st) 111474, ¶¶
35-40. EZ Masonry contends that there remains uncertainty as to whether the determining factor
10
No. 1-13-0744
in whether a purchaser can proceed against a subcontractor is "solvency," "no recourse" or "the
viability" of a corporation. After a review of those cases, we strongly disagree.
¶ 20 The law in Illinois is clear. An innocent purchaser may proceed on a claim for the breach
of the implied warranty of habitability against a subcontractor where the builder-vendor is
insolvent. See Minton, 116 Ill. App. 3d at 855; see also Washington Courte, 150 Ill. App. 3d at
689, Pratt II, 2012 IL App (1st) 111474 at ¶¶ 35-40; see also Dearlove Cove Condominiums, 180
Ill. App. 3d at 440; see also Gustein, et al., supra §13:63 ("The warranty has been held to bind a
subcontractor who did defective work in a case where the builder-vendor dissolved without
assets, although there was no privity between the owner and the subcontractor. However, the
subcontractor is not bound by the warranty if the contractor is not insolvent." (Emphasis added.)).
¶ 21 In Minton, the seminal case expanding the application of the implied warranty of
habitability to subcontractors, the builder-vendor from whom the plaintiffs had purchased their
home dissolved as an entity. Minton, 116 Ill. App. 3d at 853. Prior to the dissolution, the
plaintiffs had demanded that the builder-vendor correct the peeling paint on the outside of their
home and filed a complaint against it. Minton, 116 Ill. App. 3d at 853. The builder-vendor made
no repairs, and when it dissolved, the plaintiffs pursued their breach of the implied warranty of
habitability claim against the responsible subcontractor. Minton, 116 Ill. App .3d at 853. The
circuit court dismissed the plaintiffs' claim against the subcontractor and the plaintiffs appealed,
arguing that the implied warranty of habitability should be applied to a subcontractor of a
builder-vendor where the builder-vendor was dissolved and is insolvent. Minton, 116 Ill. App.3d
at 854. The court in Minton agreed with the plaintiffs and held:
11
No. 1-13-0744
"[W]here the innocent purchaser has no recourse to the builder-vendor and has sustained
loss due to the faulty and latent defect in their new home caused by the subcontractor, the
warranty of habitability applies to such subcontractor." Minton, 116 Ill. App. 3d at 855.
In coming to this decision, the court reasoned:
"Purchasers from a builder-vendor depend upon his ability to construct and sell a home of
sound structure and his ability to hire subcontractors capable of building a home of sound
structure. The plaintiffs here had no control over the choice of [the builder-vendor] to
paint the eaves and windows of their home, and [the builder-vendor] was in the better
position to know which subcontractor could perform the work adequately." Minton, 116
Ill. App. 3d at 854.
¶ 22 Several years after Minton, in Washington Courte, 150 Ill. App. 3d at 689, our appellate
court revisited the issue of whether the implied warranty of habitability can be extended to
subcontractors. In that case, the plaintiffs did not present evidence that the general contractor
was insolvent until six months after the subcontractor's reply brief had been filed. Under that
record, the appellate court held that "the allegation of insolvency [was] legally unsubstantiated
and [was] a matter de hors the record." Washington Courte, 150 Ill. App. 3d at 689.
Accordingly, the court concluded that the Minton exception did not apply. Washington Courte,
150 Ill. App. 3d at 689. Contrary to EZ Masonry's suggestion, nothing in Washington Courte
negates the position that "insolvency" of the general contractor is the determining factor in
establishing whether a purchaser can proceed against a subcontractor on a breach of implied
warranty of habitability claim. See Washington Courte, 150 Ill. App. 3d at 689 ("we reject
12
No. 1-13-0744
plaintiffs' allegation that Washington-Golf Corporation is insolvent on the grounds that the
allegation of insolvency is legally unsubstantiated and is a matter de hors the record. Therefore,
the issue is not properly before this court. [Citation.] As a result, we find the Minton exception
inapplicable." (Emphasis added.)).
¶ 23 Three years after Washington Courte, in Dearlove Cove Condominiums, 180 Ill. App. 3d
at 440, we held that where a plaintiff timely filed his action against a general contractor for
construction defects, and the general contractor subsequently became insolvent, under Minton,
the plaintiff could proceed against the subcontractor even if he failed to file the complaint within
the applicable statute of limitations so long as the action was timely filed against the general
contractor. In that case, we reiterated that Minton stood for the proposition that a purchaser can
proceed against a subcontractor if a builder-vendor is "insolvent." See Dearlove Cove
Condominiums, 180 Ill. App. 3d at 439-40 ("As long as the plaintiffs' original action against the
general contractor is timely, we believe that the plaintiffs should able to bring their action against
the subcontractor within two years from the time at which the plaintiff knew or reasonably
should have known of the existence of the right to sue. [Citation.] Thus, the plaintiffs had two
years from the time they knew or should have known of the general contractor's insolvency."
(Emphasis added.)).
¶ 24 Following the rationale in Minton, Washington Courte and Dearlove Cove
Condominiums, in Pratt II, and under the record we had before us then, which included no
allegations regarding Platt's insolvency, we held that the condominium association could not
proceed against EZ Masonry "while it still had recourse against Platt." Pratt II, 2012 IL App
13
No. 1-13-0744
(1st) 111474, ¶ 39. In doing so, we specifically held that unlike the developer, Wayne, Platt was
solvent. See Pratt II, 2012 IL App (1st) 111474, ¶ 39.
¶ 25 Under the aforementioned precedent, which we find to be consistent, we hold and clarify
that for purposes of determining whether a purchaser may proceed against a subcontractor on a
breach of implied warranty of habitability claim, the court must look to whether the general
contractor is solvent. Insolvency simply means that a party's liabilities exceed the value of its
assets, and that it has stopped paying debts in the ordinary course of business. See Black's Law
Dictionary, 799 (7th ed. 2007); see also 740 ILCS 160/3 (West 2010) ("(a) A debtor is insolvent
if the sum of the debtor's debts is greater than all of the debtor's assets at a fair valuation. (b) A
debtor who is generally not paying his debts as they become due is presumed to be insolvent.").
It is the burden of the purchaser to establish that the general contractor is insolvent before it can
proceed against the subcontractor on such a claim. Once the purchaser becomes aware that the
general contractor is insolvent, it must file an amended complaint, alleging the insolvency and
seeking to proceed against the subcontractor.
¶ 26 In the present case, the circuit court held that Platt is "is insolvent, but is in good standing
with limited assets." Under that record, and factual finding, which we have no basis to disturb,2
2
The condominium association asserts in its brief that during the limited discovery held
on the issue of Platt's solvency, Platt admitted that its liabilities are currently greater than the
value of its assets, and that it has no assets other than a sign which is believed to have no market
value, and one outstanding receivable for $3,500. Platt further listed its liabilities as: (1) money
owed to subcontractors; (2) $90,000 owed on a line of credit; and (3) ongoing attorney fees
14
No. 1-13-0744
we are compelled to conclude that the condominium association may proceed with its breach of
the implied warranty of habitability claim against EZ Masonry.
¶ 27 III. CONCLUSION
¶ 28 For the foregoing reasons, we remand to the circuit court for further proceedings.
¶ 29 Remanded.
related to this litigation. EZ Masonry asks that we strike this portion of the condominium
association's brief as it cites to an appendix, which was not properly submitted before this court
as part of a supplementary supporting record, as is required under Illinois Supreme Court Rule
308 (Ill. S. Ct. R. 308 (eff. Feb. 26, 2010)). We need not strike that portion of the brief, however,
since we do not rely on these facts in coming to our conclusion, but rather merely rest our
conclusion on the circuit court's factual finding that Platt is "insolvent."
15