UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLUMBIA
)
NORTHERN AIR CARGO, et al., )
)
Plaintiffs, )
)
v. )
)
UNITED STATES POSTAL SERVICE, ) Civil Action No. 10-2076 (EGS)
)
Defendant, )
)
and )
)
PENINSULA AIRWAYS, INC., )
)
Defendant-Intervenor. )
)
MEMORANDUM OPINION
Pending before the Court is a motion for temporary
restraining order and preliminary injunction by Plaintiffs
Northern Air Cargo (“NAC”), Tatonduk Outfitters Ltd d/b/a Everts
Air Cargo (“Everts”), and Lynden Air Cargo LLC (“Lynden”)
(collectively, “plaintiffs”). Plaintiffs seek to enjoin
Defendant United States Postal Service (the “Postal Service”)
from tendering nonpriority mainline bypass mail to Defendant-
Intervenor Peninsula Airways, Inc. (“PenAir”) on five mainline
routes in rural Alaska pursuant to 39 U.S.C. § 5402(g)(5)(C)
(“§ 5402(g)(5)(C)”). Specifically, plaintiffs challenge the
Postal Service’s purportedly ultra vires determination that
PenAir had satisfied the “Prior Service and Capacity Requirement”
of 39 U.S.C. § 5402(g)(1)(A)(iv)(II) (“§ 5402(g)(1)(A)(iv)(II)”)
as of December 3, 2010.1 Plaintiffs argue that they will suffer
“immediate and irreparable injury in the form of . . .
substantial non-recoverable economic losses” if an immediate
injunction is not granted. Pls.’ Mot. at 1. Upon consideration
of the motion, the responses and reply thereto, the applicable
law, the arguments of counsel made during the motions hearing
held on December 21, 2010, and for the following reasons, the
Court hereby DENIES plaintiffs’ motion for temporary restraining
order and preliminary injunction.
I. BACKGROUND2
This is the second action that plaintiffs have filed related
to the Postal Service’s purportedly unlawful tender of
1
As discussed infra, the Prior Service and Capacity
Requirement requires the Postal Service “in selecting carriers of
nonpriority bypass mail . . . [to] adhere to an equitable tender
policy . . . and [to], at a minimum, require that any such
carrier– . . . (iv) have provided scheduled service . . . between
2 points within the State of Alaska for at least 12 consecutive
months with aircraft– . . . (II) over 7,500 pounds payload
capacity before being selected as a carrier of nonpriority bypass
mail at the intra-Alaska mainline service mail rate.” 39 U.S.C.
§ 5402(g)(1)(A)(iv)(II).
2
An extensive factual and statutory background is set
forth in the Court’s September 23, 2010 Memorandum Opinion, which
was issued in Civil Action No. 09-2065. For purposes of this
Opinion, the Court will assume the parties’ familiarity with this
factual and statutory background, and will direct interested
readers to the Court’s September 23, 2010 Memorandum Opinion for
additional background. See Northern Air Cargo v. United States
Postal Serv., No. 09-2065, 2010 U.S. Dist. LEXIS 100757 (D.D.C.
Sept. 23, 2010). A lengthy discussion of the Intra-Alaska Bypass
Mail System and the Rural Service Improvement Act of 2002 can
also be found in the Court’s September 23, 2010 Memorandum
Opinion. Id. at *2-8.
2
nonpriority mainline bypass mail to PenAir. The first action
came before the Court on November 3, 2009 as a motion for
preliminary injunction (hereinafter, the “2009 Action”). See
Civil Action No. 09-2065, Docket No. 5. In the 2009 Action,
plaintiffs challenged the Postal Service’s August 7, 2009 and
September 2, 2009 determinations that PenAir was eligible for the
equitable tender of nonpriority mainline bypass mail on five
mainline routes: Anchorage-Dillingham, Anchorage-King Salmon,
Anchorage-Aniak, Anchorage-McGrath, and Anchorage-Unalakleet.
With the consent of the parties, plaintiffs’ motion for
preliminary injunction was consolidated with a determination on
the merits pursuant to Federal Rule of Civil Procedure 65(a)(2),
and the parties subsequently filed cross-motions for summary
judgment. See Civil Action No. 09-2065, Minute Order dated Nov.
4, 2009.
On September 23, 2010, this Court issued an opinion granting
in part and denying in part the parties’ cross-motions for
summary judgment.3 The Court held, among other things, that the
Postal Service had exceeded its statutory authority in
determining that PenAir was not required to satisfy the Prior
Service and Capacity Requirement of § 5402(g)(1)(A)(iv)(II) in
order to be tendered nonpriority mainline bypass mail pursuant to
3
The Court’s September 23, 2010 ruling is currently
being appealed by both plaintiffs and PenAir. See USCA Case
Numbers 10-5385 and 10-5402.
3
§ 5402(g)(5)(C). See Northern Air Cargo, 2010 U.S. Dist. LEXIS
100757, at *29-32. The Court consequently enjoined the Postal
Service from tendering nonpriority mainline bypass mail to PenAir
until the airline satisfied the Prior Service and Capacity
Requirement of § 5402(g)(1)(A)(iv)(II). See Civil Action No. 09-
2065, Order at 2. Accordingly, on September 24, 2010, the Postal
Service ceased tendering nonpriority mainline bypass mail to
PenAir. See Postal Service’s Opp’n at 6.
On October 12, 2010, PenAir submitted a new application to
the Postal Service once again requesting the equitable tender of
nonpriority mainline bypass mail in the five mainline markets at
issue in this case: Dillingham, King Salmon, Aniak, McGrath, and
Unalakleet. See Postal Service’s Opp’n at 6-7; Declaration of
Steven Deaton (“Deaton Decl.”) ¶ 3. By letter dated October 21,
2010, the Postal Service found that PenAir had satisfied the
Prior Service and Capacity Requirement. See Ex. B to Deaton
Decl.; see also Deaton Decl. ¶ 4 (“[T]he [Postal Service]
confirmed that PenAir had satisfied the Prior Service and
Capacity Requirement . . . by flying a mainline passenger
aircraft between any two points within the State of Alaska for at
least 12 months . . . .”). The letter also stated, however, that
because “[t]he district court did not address whether PenAir
should receive credit for the past 13 months in which it has been
providing mainline service in Alaska . . . the actual tender of
4
mail to PenAir may violate the court’s injunction.” Ex. B to
Deaton Decl. Prior to tendering nonpriority mainline bypass mail
to PenAir, therefore, the Postal Service explained that it needed
clarification from the Court regarding whether its proposed
equitable tender would violate the Court’s injunction. See Ex. B
to Deaton Decl. (“[T]he Postal Service will immediately begin
tendering mail to PenAir upon the occurrence of either of the
following events: (1) the court lifts the injunction; [or] (2)
PenAir obtains an appropriate clarification of (or modification
to) the injunction, which, in the sole judgment of the Postal
Service, makes it clear that tendering mail will not violate the
court’s injunction.”).
On November 17, 2010, the Postal Service filed a “Motion for
Order to Clarify Judgment” in the 2009 Action. See Civil Action
No. 09-2065, Docket No. 38. In its motion, the Postal Service
asked the Court to clarify whether it “intended to credit PenAir
for the past 13 months during which it has been providing
mainline passenger service in Alaska.” Civil Action No. 09-2065,
Postal Service’s Mot. for Clarification at 2. On December 2,
2010, the Court denied the Postal Service’s motion. See Civil
Action No. 09-2065, Minute Order dated Dec. 2, 2010 (“After
careful consideration of defendant’s motion, the Court concludes
that the issue on which defendant seeks clarification - ‘whether
PenAir should receive credit for the past 13 months during which
5
it has been providing mainline service to Alaskans,’ Def.’s Mot.
at 2 - is not properly before the Court. Specifically, the Court
finds that the issue presented by defendant would require the
Court to entertain new factual and legal issues beyond the scope
of the Court’s Memorandum Opinion and Order.”). Following the
Court’s issuance of this ruling, the Postal Service concluded
that PenAir had satisfied the Prior Service and Capacity
Requirement. See Deaton Decl. ¶¶ 7-8. Soon thereafter, on
December 6, 2010, the Postal Service began tendering nonpriority
mainline bypass mail to PenAir on the five requested mainline
routes. See Deaton Decl. ¶ 7.
On December 8, 2010, plaintiffs filed an emergency motion
for an order to show cause why the Postal Service should not be
found in contempt in the 2009 Action, arguing that the Postal
Service had violated the Court’s injunction by resuming tender of
nonpriority mainline bypass mail to PenAir. See Civil Action No.
09-2065, Docket No. 47. On that same date, plaintiffs also filed
the instant action, in which it requested a temporary restraining
order and preliminary injunction. The Court held a status
hearing in the cases on December 9, 2010, at which time it stayed
briefing on plaintiffs’ motion for contempt in the 2009 Action,
and entered an expedited briefing schedule in the instant case.
A hearing was held on plaintiffs’ motion on December 21, 2010.
Plaintiffs’ motion for temporary restraining order and
6
preliminary injunction is now ripe for determination by the
Court.
II. LEGAL STANDARD FOR INTERIM INJUNCTIVE RELIEF
Preliminary injunctive relief is an “extraordinary remedy
never awarded as of right.” Winter v. NRDC, Inc., 555 U.S. 7,
129 S. Ct. 365, 376 (2008); Munaf v. Geren, 553 U.S. 674, 128 S.
Ct. 2207, 2219 (2008) (“A preliminary injunction is an
extraordinary and drastic remedy[.]” (internal quotation marks
omitted)). In deciding whether to grant a preliminary
injunction, the Court must evaluate whether: “(1) the plaintiff
has a substantial likelihood of success on the merits; (2) the
plaintiff would suffer irreparable injury were an injunction not
granted; (3) an injunction would substantially injure other
interested parties; and (4) the grant of an injunction would
further the public interest.” Ark. Dairy Coop. Ass’n v. United
States Dep’t of Agric., 573 F.3d 815, 821 (D.C. Cir. 2009)
(citing Serono Labs., Inc. v. Shalala, 158 F.3d 1313, 1317-18
(D.C. Cir. 1998)); see also Hall v. Daschle, 599 F. Supp. 2d 1, 3
n.2 (D.D.C. 2009) (“The same standard applies to both temporary
restraining orders and to preliminary injunctions.”). The moving
party bears the burden of persuasion and must demonstrate, “by a
clear showing,” that the requested relief is warranted.
Chaplaincy of Full Gospel Churches v. England, 454 F.3d 290, 297
(D.C. Cir. 2006).
7
These four factors have typically been evaluated on a
“sliding scale,” whereby if the movant makes an unusually strong
showing on one of the factors, then it does not necessarily have
to make as strong a showing on another factor. Davis v. Pension
Benefit Guar. Corp., 571 F.3d 1288, 1291-92 (D.C. Cir. 2009)
(citing Davenport v. Int’l Bhd. of Teamsters, 166 F.3d 356, 361
(D.C. Cir. 1999)). While it is unclear whether the “sliding
scale” is still controlling in light of the Supreme Court’s
decision in Winter, the Court need not decide this issue because
plaintiffs’ request for a temporary restraining order and
preliminary injunction fails even under the less stringent
“sliding scale” analysis of Davenport. See id. (declining, given
the facts of the case, to decide if Winter created a “stricter
standard” to obtain interim injunctive relief).
III. ANALYSIS
Plaintiffs argue that all four factors necessary to obtain
interim injunctive relief “weigh strongly in favor of
Plaintiffs,” Pls.’ Mot. at 11 n.9, while the Postal Service and
PenAir argue that none of the criteria for interim injunctive
relief have been met. The Court will begin by addressing
plaintiffs’ likelihood of success on the merits.
A. Substantial Likelihood of Success
The merits of this case turn on whether the Postal Service
properly determined, on December 3, 2010, that PenAir had
8
satisfied the Prior Service and Capacity Requirement and was
therefore an eligible mainline carrier under § 5402(g)(5)(C).
As a threshold matter, the Court’s analysis of the validity
of the Postal Service’s interpretation of § 5402(g)(5)(C) is
governed by Chevron U.S.A. Inc. v. Natural Resources Defense
Council, Inc., 467 U.S. 837 (1984). Under Chevron, the Court
must first determine “whether Congress has directly spoken to the
precise question at issue.” Id. at 842. Courts “use
‘traditional tools of statutory construction’ to determine
whether Congress has unambiguously expressed its intent,” Serono,
158 F.3d at 1320, including an examination of the statute’s text,
structure, purpose, and legislative history. See Shays v. FEC,
414 F.3d 76, 105 (D.C. Cir. 2005). “If the intent of Congress is
clear, that is the end of the matter; for the court, as well as
the agency, must give effect to the unambiguously expressed
intent of Congress.” Chevron, 467 U.S. at 842-43. If, however,
“the statute is silent or ambiguous with respect to the specific
issue, the question for the court is whether the agency’s answer
is based on a permissible construction of the statute.” Id. at
843. In making such an assessment, “considerable weight” is
generally accorded to “an executive department’s construction of
a statutory scheme it is entrusted to administer[.]” Id.
In this case, both parties rely on a “plain meaning”
interpretation of the Prior Service and Capacity Requirement.
9
Specifically, plaintiffs argue that the “plain language of the
Prior Service and Capacity Requirement confirms that PenAir is
not eligible to receive tender of mainline bypass mail under
Section 5402(g)(5)(C),” Pls.’ Mot. at 12, while defendants
contend that the Postal Service’s decision to tender nonpriority
mainline bypass mail to PenAir “honors the plain language of the
Prior Service and Capacity Requirement.” PenAir’s Opp’n at 7.
For the reasons discussed below, the Court concludes that
plaintiffs have failed to demonstrate that they have a
substantial likelihood of success on the merits.
The Prior Service and Capacity Requirement states, in
relevant part, that:
The Postal Service, in selecting carriers of
nonpriority bypass mail to any point served by more
than 1 carrier in the State of Alaska, shall adhere
to an equitable tender policy within a qualified
group of carriers, in accordance with the
regulations of the Postal Service, and shall, at a
minimum, require that any such carrier– . . . (iv)
have provided scheduled service with at least the
number of scheduled noncontract flights each week
established under subparagraph (B)(ii) between 2
points within the State of Alaska for at least 12
consecutive months with aircraft– . . . (II) over
7,500 pounds payload capacity before being selected
as a carrier of nonpriority bypass mail at the
intra-Alaska mainline service mail rate.
39 U.S.C. § 5402(g)(1)(A)(iv)(II). Plaintiffs argue that -
contrary to the plain language of § 5402(g)(1)(A)(iv)(II) - the
Postal Service impermissibly relied upon the ten months that
PenAir was unlawfully carrying nonpriority mainline bypass mail
10
(i.e., while the 2009 Action was pending) in concluding that
PenAir satisfied the Prior Service and Capacity Requirement.4
Specifically, plaintiffs argue that “[f]or the Prior Service and
Capacity Requirement to have any meaning, a carrier must provide
the required service before being tendered Mainline Bypass Mail.”
Pls.’ Mot. at 14 (emphasis in plaintiffs’ motion). Plaintiffs
further assert that “[n]othing in the Prior Service and Capacity
Requirement permits a carrier to satisfy the requirement while
carrying – and being compensated for carrying – Mainline Bypass
Mail,” and that “[s]uch an interpretation contravenes the plain
language of the statute and flies in the face of the unmistakable
purpose of the statute; i.e., to ensure that prospective new
carriers demonstrate their viability and a sustained commitment
to serving the rural Alaskan communities with Large Aircraft for
twelve consecutive months before being permitted to underwrite
their operations with the financially significant Mainline Bypass
Mail revenues.” Pls.’ Mot. at 14 (emphasis in plaintiffs’
motion). In sum, because PenAir only operated an aircraft with
over 7,500 pounds payload capacity for approximately two months
before it began receiving an ultra vires tender of nonpriority
4
It is undisputed that PenAir did not begin operating
aircraft with over 7,500 pounds payload capacity until on or
about August 22, 2009. It is also undisputed that the Postal
Service began tendering nonpriority mainline bypass mail to
PenAir on November 9, 2009 and continued to do so until the Court
issued its Memorandum Opinion in the 2009 Action on September 23,
2010. See Pls.’ Mot. at 13.
11
mainline bypass mail from the Postal Service, plaintiffs argue
that the Postal Service impermissibly determined on December 3,
2010 that PenAir had satisfied the clear and unambiguous language
of the Prior Service and Capacity Requirement.
Defendants, by contrast, argue that the Postal Service’s
ultra vires tender of nonpriority mainline bypass mail to PenAir
is irrelevant to whether the Postal Service properly determined
that PenAir had satisfied the Prior Service and Capacity
Requirement as of December 3, 2010. Instead, defendants assert
that “[d]etermining whether the Postal Service has validly
‘selected’ a carrier for nonpriority mainline bypass mail is [] a
simple exercise in arithmetic: Count backwards 12 months from the
date of selection; if the carrier has flown the requisite number
of scheduled mainline flights during those 12 straight months,
the carrier qualifies and the Postal Service’s selection is
valid.” PenAir’s Opp’n at 7. Because PenAir had operated the
requisite number of scheduled mainline flights for approximately
16 consecutive months prior to the Postal Service’s December 3,
2010 decision to tender nonpriority mainline bypass mail to
PenAir, PenAir argues that the Postal Service correctly
determined that the airline had satisfied the unambiguous
requirements set forth in § 5402(g)(1)(A)(iv)(II). See PenAir’s
Opp’n at 7-8; see also Deaton Decl. ¶ 4 (“[T]he [Postal Service]
confirmed that PenAir had satisfied the Prior Service and
12
Capacity Requirement . . . by flying a mainline passenger
aircraft between any two points within the state of Alaska for at
least 12 months, after reviewing the flight schedules submitted
to the Postal Service as well as data provided electronically to
the Postal Service by the Official Airline Guide . . . . In
reaching that conclusion, the [Postal Service] did not segregate
bypass mail-carrying flights and non-bypass mail-carrying flights
because the statute, section 5402(g)(1)(A)(iv), merely states
that the airline requesting immediate equitable tender of
mainline bypass mail must have ‘provided scheduled service with
at least the number of scheduled noncontract flights each week
. . . between 2 points within the State of Alaska for at least 12
consecutive months.’”).5
5
In further support of its plain language
interpretation, PenAir asserts that the first clause of
§ 5402(g)(1)(A) sets forth the factors that the Postal Service
must consider “when ‘selecting carriers of nonpriority mainline
bypass mail’ - that is, when making its present decision.”
PenAir’s Opp’n at 9 (quoting 39 U.S.C. § 5402(g)(1)(A)) (emphasis
in PenAir’s brief). PenAir explains that § 5402(g)(1)(A)(iv)’s
requirement that an airline must have provided the requisite
number of flights for at least 12 consecutive months “before
being selected as a carrier of nonpriority [mainline] bypass
mail,” 39 U.S.C. § 5402(g)(1)(A)(iv)(II), is “most naturally read
to refer to the Postal Service’s present decision: a carrier must
have flown for 12 months continuously before the Postal Service
selects it to carry bypass mail now.” PenAir’s Opp’n at 10
(emphasis in PenAir’s brief). Focusing on the structure of
§ 5402(g)(1)(A), PenAir argues that “[p]laintiffs’ contention
that ‘selecting’ refers to one decision in Section 5402(g)(1)(A)
and ‘being selected’ refers to an entirely different decision –
when used in a subclause of the same section - is simply not
plausible.” PenAir’s Opp’n at 10 (emphasis in PenAir’s brief).
13
Upon careful consideration of the parties’ arguments, the
Court concludes that plaintiffs have failed to establish that
they have a “substantial likelihood” of success on the merits.
Ark. Dairy Coop., 573 F.3d at 821. As the Court explained during
the motions hearing held on December 21, 2010, each of the
parties has raised compelling arguments in support of their
respective positions. Because the Court requires additional
briefing and further explanation in order to resolve the case on
the merits, the Court concludes that “[a]t this point, both
sides’ likelihood of success on the merits . . . must be rated
‘uncertain.’” Potter v. District of Columbia, 382 F. Supp. 2d
35, 41 (D.D.C. 2005). With the arguments of the parties in
equipoise, the Court finds that plaintiffs have failed to carry
their burden on this factor.
B. Irreparable Harm
Next, the Court must determine whether plaintiffs will
suffer irreparable harm in the absence of interim injunctive
relief. This Circuit “has set a high standard for irreparable
injury.” Chaplaincy of Full Gospel Churches, 454 F.3d at 297.
“[T]he injury must be both certain and great; it must be actual
and not theoretical.” Wisc. Gas Co. v. FERC, 758 F.2d 669, 674
(D.C. Cir. 1985) (per curiam).
Plaintiffs argue that from November 9, 2009 through
September 23, 2010 - the time period during which PenAir was
14
unlawfully tendered nonpriority mainline bypass mail in the
Anchorage-Dillingham, Anchorage-King Salmon, Anchorage-Aniak,
Anchorage-McGrath, and Anchorage-Unalakleet markets – plaintiffs
collectively lost approximately $4 million in revenue as a result
of their decreased market share. See Pls.’ Mot. at 18-19; see
also Declaration of David Karp (“Karp Decl.”) ¶ 11 (averring that
NAC lost approximately $1.3 million in revenue from November 9,
2009 through September 23, 2010); Declaration of Judy A. McKenzie
(“McKenzie Decl.”) ¶ 9 (averring that Lynden lost approximately
$1.5 million in annual revenue from nonpriority bypass mail and
freight after it was forced to exit the Dillingham market on
February 13, 2010); Declaration of Susan Hoshaw (“Hoshaw Decl.”)
¶ 10 (averring that Everts lost approximately $1.17 million in
bypass mail revenues and $386,000 in freight revenues from
November 9, 2009 through September 23, 2010). Plaintiffs assert
that “[i]f the Postal Service resumes tendering Mainline Bypass
Mail to PenAir in the five requested markets, Plaintiffs will
suffer losses proportionate to those suffered from November 9,
2009 through September 24, 2010.” Pls.’ Mot. at 19. Because
they “currently have no mechanism to recover these or future
losses resulting from the Postal Service’s ultra vires acts[,]”
plaintiffs argue that their injuries “constitute per se
irreperable harm.” Pls.’ Mot. at 19-20 (citing Express One
15
Int’l, Inc. v. U.S. Postal Serv., 814 F. Supp. 87, 91 (D.D.C.
1992)).
In response, defendants argue that “[t]his Court has
consistently rejected the argument Plaintiffs advance that non-
recoverable economic damages . . . constitute per se irreparable
harm,” Postal Service’s Opp’n at 13 (citing cases), and assert
that plaintiffs cannot demonstrate irreparable harm “from a
slight reduction in market share in the five markets at issue[.]”
Postal Service’s Opp’n at 11. This Court agrees.
In order to obtain interim injunctive relief, it is not
enough for a plaintiff to show that it will suffer some harm in
the absence of an injunction; instead, the moving party must
demonstrate that its harm will be “great.” Wisc. Gas, 758 F.2d
at 674. This is true even if the moving party will purportedly
suffer irrecoverable economic losses. While such a party may be
excused from demonstrating that its economic loss “threatens the
very existence of the movant’s business,” id., the plaintiff must
nevertheless demonstrate that its business would suffer “great”
harm in the absence of interim injunctive relief.6 Put another
6
In Wisconsin Gas, the Circuit held that “recoverable
monetary loss may constitute irreparable harm only where the loss
threatens the very existence of the movant’s business.” 758 F.2d
at 674. Because Wisconsin Gas only addressed “recoverable
monetary loss,” some judges on this Court have distinguished
recoverable economic loss from irrecoverable economic loss when
assessing irreparable harm. See, e.g., Feinerman v. Bernardi,
558 F. Supp. 2d 36, 51 (D.D.C. 2008) (“The defendant argues that
‘monetary loss is not irreparable harm unless it threatens the
16
way, “the injury must be more than simply irretrievable; it must
also be serious in terms of its effect on the plaintiff.” Gulf
Oil Corp. v. Dep’t of Energy, 514 F. Supp. 1019, 1026 (D.D.C.
1981).
In this case, the Court finds that plaintiffs have failed to
satisfy this Circuit’s stringent standard for irreperable harm
based on their failure to offer “‘substantiation of severe
economic impact.’” PenAir’s Opp’n at 17 (quoting WMATC v.
Holiday Tours, Inc., 559 F.2d 841, 843 n.3 (D.C. Cir. 1977)).
Specifically, plaintiffs failed to demonstrate how their
projected revenue losses and diminished market shares on the five
remote Alaskan routes at issue in this case will impact the
overall economic health of each of the plaintiff airlines. While
the Court is aware that each plaintiff stands to lose
approximately $130,000 per month in anticipated revenue in the
absence of an interim injunction, the Court is unable to assess
the magnitude of this loss without evidence of each airline’s
very existence of the plaintiff’s business.’ The Court agrees
with this proposition as a general matter. But where, as here,
the plaintiff in question cannot recover damages from the
defendant due to the defendant’s sovereign immunity, any loss of
income suffered by a plaintiff is irreparable per se[.]”
(internal citations omitted)). While the Court agrees that
irrecoverable financial loss may constitute irreparable injury in
some cases, this Court is of the opinion that a party asserting
such a loss is not relieved of its obligation to demonstrate that
its harm will be “great.” If this were not the case, then
prospective injunctive relief would often cease to be an
“extraordinary remedy” in cases involving government defendants.
Winter, 129 S. Ct. 376.
17
projected annual gross revenue. The Court finds plaintiffs’
failure to put forth evidence on this issue particularly
troubling in light of the fact that this issue was raised in
PenAir’s opposition brief,7 and therefore could have been
addressed by plaintiffs in their reply.8 Unaided by sworn
declarations from plaintiffs discussing the overall impact of the
projected losses on plaintiffs’ businesses, the Court is unable
to find that the purported harm to be suffered by plaintiffs is
sufficiently great to warrant interim injunctive relief. See
generally Cobell v. Norton, 391 F.3d 251, 258 (D.C. Cir. 2004)
7
See PenAir’s Opp’n at 17-18 (“The fact that the
Plaintiffs will lose market share on five discrete—and very
remote—Alaskan routes says absolutely nothing about how that will
impact the Plaintiffs’ economic survival. . . . Nothing in the
Plaintiffs’ declarations remotely suggests that PenAir’s entry
into these five small markets will precipitate bankruptcy or mass
layoffs. Indeed, the combined damages that the Plaintiffs
forecast they will suffer is under $4 million—or roughly $1.3
million on average apiece. While a million dollars is certainly
real money, the Plaintiffs’ declarations never suggest how big—or
small—this putative loss would be as a percentage of their annual
gross revenues.”).
8
Plaintiffs failed to address this issue until their
counsel was specifically questioned about it during oral argument
on December 21, 2010. In response to the Court’s questioning,
plaintiffs’ counsel provided a chart to the Court which
purportedly reflects the net income of each of the plaintiffs
during the time period that PenAir was receiving the ultra vires
tender of nonpriority mainline bypass mail. Despite its best
efforts, the Court finds plaintiffs’ chart incomprehensible and
therefore unpersuasive. Moreover, this late-proffered chart,
which provides no information regarding plaintiffs’ gross
revenues for the same time period, is simply insufficient to
satisfy plaintiffs’ heavy burden of demonstrating irreperable
harm.
18
(“A preliminary injunction is an extraordinary remedy that should
be granted only when the party seeking the relief, by a clear
showing, carries the burden of persuasion.” (citing Mazurek v.
Armstrong, 520 U.S. 968, 972 (1997))); see also, e.g., Coal. for
Common Sense in Gov’t Procurement v. United States, 576 F. Supp.
2d 162, 169, 169 n.3 (D.D.C. 2008) (rejecting plaintiff’s
argument that its members would “suffer irreparable harm because
lost profits [were] not likely to be recovered later in [the]
litigation in the form of damages due to protections of sovereign
immunity” where the plaintiff’s purported economic injury was not
“sufficiently grave to constitute irreparable harm”).9
Accordingly, plaintiffs have also failed to demonstrate that this
factor weighs in favor of their requested relief.
9
The Court will note that while an airline’s projected
loss of approximately $1.3 million over 10 months is by no means
insignificant, this Court has declined to grant prospective
injunctive relief when much larger sums of irrecoverable economic
losses were at stake. See, e.g., Sanofi-Aventis U.S. LLC v. FDA,
No. 10-1255, 2010 U.S. Dist. LEXIS 87583, at *36-39 (D.D.C. Aug.
25, 2010) (finding it unlikely that the plaintiff had “met this
Circuit’s stringent standard for irreparable harm” where the
plaintiff stood to lose approximately $2.5 billion in annual
domestic sales because the plaintiff had worldwide revenues of
$40 billion annually). In determining whether a party requesting
interim injunctive relief has demonstrated irreperable harm, the
focus of the Court’s inquiry is on the magnitude of harm that
will be suffered by the moving party, not the particular amount
of economic damages that the plaintiff will suffer.
19
C. Harm to Other Interested Parties
Because the Postal Service has been tendering nonpriority
mainline bypass mail to PenAir since December 6, 2010, PenAir
would undoubtedly be harmed if the Court entered an interim
injunction. See Declaration of Daniel Seybert (“Seybert Decl.”)
¶ 20 (“[A]n injunction preventing the Postal Service from
continuing to tender [nonpriority mainline bypass] mail to PenAir
would result in PenAir losing millions of dollars in revenue. . .
. Plaintiffs claim lost revenues totaling about $4 million, split
among the three Cargo Carriers (with no single Plaintiff claiming
lost revenues of more than $1.5 million in freight and mail). By
contrast, an injunction barring the Postal Service from tendering
this nonpriority mainline bypass mail to PenAir would cause
PenAir to lose about $4 million in revenues, more than two-and-a-
half times the lost revenues any single Plaintiff claims it would
lose.”). Whatever revenue losses plaintiffs will lose to PenAir
in the absence of an injunction, PenAir will lose to plaintiffs
in the presence of one. The Court therefore concludes that the
harm alleged by plaintiffs and the harm faced by PenAir are
essentially “‘a wash.’” Sanofi-Aventis, 2010 U.S. Dist. LEXIS
87583, at *40 (quoting Serono, 158 F.3d at 1326).10
10
While plaintiffs also assert that they will “suffer
serious non-economic harm . . . in the form of cancelled flights,
withdrawal from the market(s), and terminated employees” in the
absence of an injunction, Pls.’ Reply at 12, PenAir has
represented that in the presence of an injunction it will cease
20
Accordingly, this factor is neutral in the Court’s analysis.
D. Public Interest
The last factor the Court must consider is whether the
public interest favors entry of a preliminary injunction.
Plaintiffs argue that “[t]he public interest is ‘best served by
having federal agencies comply with the requirements of federal
law.’” Pls.’ Mot. at 21 (quoting Patriot, Inc. v. U.S. Dep’t of
Housing & Urban Dev., 963 F. Supp. 1, 6 (D.D.C. 1997)). Arguing
that “the Postal Service has exceeded the scope of its statutory
authority and has failed to comply with the requirements of
federal law,” plaintiffs assert that “[t]his fact alone
demonstrates that the public interest supports the granting of
injunctive relief.” Pls.’ Mot. at 21 (internal quotation marks
omitted). While it is undoubtedly true that the public has an
interest in governmental agencies following the law, given the
facts of this case, an injunction would serve the public interest
only if plaintiffs are likely to succeed on the merits. As
discussed above, however, the Court has found that the likelihood
of plaintiffs’ success is uncertain. See supra p. 14.
In light of this uncertainty, the Court is unwilling to
conclude that the public interest would be served by enjoining
the tender of nonpriority mainline bypass mail to the only
to provide mainline passenger service on four of the five lines
at issue in this case. These non-economic harms, therefore,
appear to be unavoidable regardless of the Court’s decision.
21
mainline passenger carrier on the five mainline routes at issue
in this case: Dillingham, King Salmon, Aniak, McGrath, and
Unalakleet.11 While plaintiffs argue that an interim injunction
would not prevent PenAir from continuing to provide mainline
passenger service, Pls.’ Reply at 13, PenAir has indicated that
it would likely cease to provide mainline passenger service on
four of the five routes if an interim injunction was entered. As
a result, Alaskan residents in at least four communities would
likely be left without mainline passenger service. Based on the
current posture of this case, therefore, the Court concludes that
plaintiffs have failed to establish that the public interest
favors interim injunctive relief.
IV. CONCLUSION
For the foregoing reasons, the Court DENIES plaintiffs’
motion for a temporary restraining order and preliminary
injunction. This decision, however, in no way forecloses the
possibility that plaintiffs will be able to establish that the
Postal Service impermissibly determined that PenAir was eligible
for the equitable tender of nonpriority mainline bypass mail on
December 3, 2010. As this Court has already recognized,
plaintiffs have raised some compelling arguments in support of
their position; upon a more fully developed record, plaintiffs
11
Plaintiffs only provide cargo service to these five
Alaskan communities.
22
may well be able to succeed on the merits. Instead, the Court
holds only that upon the current record, plaintiffs have failed
to demonstrate, “by a clear showing,” that they are entitled to
the extraordinary and drastic remedy of interim injunctive
relief. Chaplaincy of Full Gospel Churches, 454 F.3d at 297.
Even though plaintiffs have failed to establish that they
meet the stringent criteria for the grant of a temporary
restraining order or preliminary injunction, the Court is
nevertheless sensitive to plaintiffs’ claims of irrecoverable
economic injury. In an effort to minimize any potential losses,
therefore, the parties are directed to propose an expedited
briefing schedule to the Court that will enable the case to be
argued and resolved in April 2011. An appropriate Order
accompanies this Memorandum Opinion.
SO ORDERED.
Signed: EMMET G. SULLIVAN
United States District Judge
December 23, 2010
23