Eureka Cnty. v. State Engineer

                                            131 Nev., Advance Opinion      614
                       IN THE SUPREME COURT OF THE STATE OF NEVADA


                  EUREKA COUNTY, A POLITICAL                 No. 61324
                  SUBDIVISION OF THE STATE OF
                  NEVADA; KENNETH F. BENSON,
                  INDIVIDUALLY; DIAMOND CATTLE
                  COMPANY, LLC, A NEVADA LIMITED                     FLED
                  LIABILITY COMPANY; AND MICHEL
                  AND MARGARET ANN ETCHEVERRY                         OCT 2 9 2015
                  FAMILY, LP, A NEVADA REGISTERED                    TAc LT LF:1hr417rvi
                                                                                   4vE c.A611
                  FOREIGN LIMITED PARTNERSHIP,                  BY LIT:
                                                                                       ERK
                  Appellants,
                  vs.
                  THE STATE OF NEVADA STATE
                  ENGINEER; THE STATE OF NEVADA
                  DIVISION OF WATER RESOURCES;
                  AND KOBEH VALLEY RANCH, LLC, A
                  NEVADA LIMITED LIABILITY
                  COMPANY,
                  Respondents.

                  MICHEL AND MARGARET ANN                    No. 63258
                  ETCHEVERRY FAMILY, LP, A
                  NEVADA REGISTERED FOREIGN
                  LIMITED PARTNERSHIP; DIAMOND
                  CATTLE COMPANY, LLC, A NEVADA
                  LIMITED LIABILITY COMPANY; AND
                  KENNETH F. BENSON, AN
                  INDIVIDUAL,
                  Appellants,
                  vs.
                  STATE ENGINEER OF NEVADA,
                  OFFICE OF THE STATE ENGINEER,
                  DEPARTMENT OF CONSERVATION
                  AND NATURAL RESOURCES; AND
                  KOBEH VALLEY RANCH, LLC, A
                  NEVADA LIMITED LIABILITY
                  COMPANY,
                  Respondents.

SUPREME COURT
        OF
     NEVADA


(0) 1947A    e,
                            Consolidated appeals challenging district court orders denying
                 judicial review of the State Water Engineer's decisions affecting water
                 rights. Seventh Judicial District Court, Eureka County; Dan L. Papez,
                 Judge.
                            Reversed and remanded.


                 Allison, MacKenzie, Ltd., and Karen A. Peterson, Jennifer Mahe, and
                 Dawn Ellerbrock, Carson City; Theodore Beutel, District Attorney, Eureka
                 County,
                 for Appellant Eureka County.

                 Schroeder Law Offices, P.C., and Laura A. Schroeder and Therese A. Ure,
                 Reno,
                 for Appellants Kenneth F. Benson; Diamond Cattle Company, LLC; and
                 Michel and Margaret Ann Etcheverry Family, LP.

                 Adam Paul Laxalt, Attorney General, and Micheline N. Fairbank, Senior
                 Deputy Attorney General, Carson City,
                 for Respondents the State of Nevada Division of Water Resources and the
                 State Engineer.

                 Parsons Behle & Latimer and Ross E. de Lipkau and John R. Zimmerman,
                 Reno; Parsons Behle & Latimer and Francis M. Wikstrom, Salt Lake City,
                 Utah,
                 for Respondent Kobeh Valley Ranch, LLC

                 Dyer, Lawrence, Flaherty, Donaldson & Prunty and Francis C. Flaherty,
                 Carson City,
                 for Amicus Curiae NV Energy, Inc.

                 Lewis Roca Rothgerber, LLP, and Daniel F. PoIsenberg, Las Vegas;
                 Taggart & Taggart, Ltd., and Paul G. Taggart, Carson City; Gregory J.
                 Walch and Dana R. Walsh, Las Vegas,
                 for Amid. Curiae Municipal Water Purveyors.




SUPREME eauFrr
         OF
      NEVADA
                                                     2
(0) 1.947A
                 BEFORE THE COURT EN BANC.

                                                  OPINION1


                 By the Court, PICKERING, J.:
                             These consolidated appeals challenge the district court's
                 orders denying judicial review of the State Water Engineer's decisions
                 affecting water rights. Under NRS 533.370(2), the State Engineer "shall
                 reject" an application for a proposed use of water or change of existing
                 water rights where that "proposed use or change conflicts with existing
                 rights." The parties ask this court to determine whether this section
                 allows for the State Engineer to take into account the applicant's ability to
                 mitigate the drying up of existing rights holders' water sources when
                 determining if a proposed use or change will conflict with existing rights.
                 However, even assuming that under NRS 533.370(2) the State Engineer
                 has authority to grant an application that conflicts with existing rights
                 based upon a determination that the applicant will be able to mitigate, the
                 State Engineer's decision to approve the applications and issue the
                 permits at issue here is not supported by sufficient evidence that
                 successful mitigation efforts may be undertaken so as to dispel the threat
                 to the existing rights holders. We thus reverse the district court's decision
                 denying judicial review of the State Engineer's decisions and remand.




                       'We originally reversed and remanded in an unpublished order.
                 Respondents and other interested persons not party to these appeals
                 moved to publish the order as an opinion. We grant the motions and
                 publish this opinion in place of our earlier order. See NRAP 36(0.


SUPREME COURT
        OF
     NEVADA
                                                       3
(0) 1947A    e
                                                       I.
                            At the heart of this appeal is the Mount Hope Mine, a large
                proposed molybdenum mine that General Moly, Inc. seeks to establish in
                Eureka County. The mine's contemplated life is 44 years, and will require
                an estimated total of 11,300 acre feet of water per year (afa). To provide
                the water for the mine, General Moly seeks to pump groundwater by well
                from the Kobeh Valley and Diamond Valley groundwater basins, basins
                that already source many existing water rights, which will cause a
                drawdown of the water table throughout the two valleys. According to a
                water resources monitoring plan created by Eureka Moly, LLC, a
                subsidiary of General Moly, the vast majority of this water for the Mount
                Hope Mine "will be consumptively used in processing activities of the
                [mining] Project (i.e.[,] no water will be returned to the aquifer)."
                            General Moly created respondent Kobeh Valley Ranch, LLC
                (KVR) to hold and control the water rights for the project. Water rights
                already appropriated by a predecessor entity associated with the mining
                project were transferred to KVR, as were existing applications to
                appropriate water that the predecessor had filed in 2005. Between 2006
                and 2010, KVR also filed numerous applications to change the point of
                diversion, the place of use, and the manner of use of other of its existing
                water rights. Appellant Eureka County protested KVR's applications on
                numerous grounds, including that KVR's groundwater appropriations
                would conflict with existing rights under NRS 533.370(2). A number of
                holders of senior water rights sourced in Kobeh Valley and Diamond
                Valley also protested on those, and other, grounds. The State Engineer
                originally held a hearing on the applications, then pending, in 2008, after
                which he approved some of KVR's applications over these objections, but

SUPREME COURT
        OF
     NEVADA
                                                       4
(0) 1947A
                   upon review the district court vacated the ruling and remanded the matter
                   back to the State Engineer for a new hearing.
                               The State Engineer held another hearing in 2010, in which he
                   accepted the evidence presented at the first hearing and allowed
                   additional evidence to be presented regarding specific water usage at the
                   proposed mining project. The State Engineer ultimately granted all of
                   KVR's applications in his Ruling Number 6127.
                               Pertinent to this appeal, the State Engineer recognized that
                   certain springs located on the Kobeh Valley floor that are in hydrologic
                   connection with the underlying water table and that source existing,
                   senior water rights would be "impacted" by KVR's pumping. However, the
                   State Engineer found that KVR could fully mitigate any impact, and to
                   that end required KVR to prepare, with the assistance of Eureka County,
                   a monitoring, management, and mitigation plan (3M Plan) for approval by
                   the State Engineer before KVR diverted any water. The State Engineer
                   then issued KVR the various use and change permits requested.
                               Eureka County, as well as appellants Kenneth F. Benson,
                   Diamond Cattle Company, LLC, and Michel and Margaret Ann
                   Etcheverry Family, LP, (collectively referred to as Benson-Etcheverry), all
                   of whom hold existing, senior rights in the valleys, petitioned the district
                   court for judicial review of Ruling 6127. The district court denied the
                   petition, finding that substantial evidence supported the State Engineer's
                   decision that KVR would be able to mitigate any adverse impacts to
                   existing water rights. The district court further held that NRS 533.370(2)
                   "does not prevent the State Engineer from granting applications that may
                   impact existing rights if the existing right can be protected through
                   mitigation, thus avoiding a conflict with existing rights."

SUPREME COURT
        OF
     NEVADA
                                                          5
(0) 1947A    ea/
                               While Ruling 6127 was before the district court, ICNTR
                   developed a 3M Plan in coordination with Eureka County. Though the
                   State Engineer approved the 3M Plan, he retained ultimate authority over
                   it, stating that the 3M Plan was approved with the "understanding that
                   components of the Plan are subject to modification based on need, prior
                   monitoring results, or changes in the approved water rights." Benson-
                   Etcheverry petitioned the district court for judicial review of this decision,
                   but the district court denied that petition as well.
                               Eureka County and Benson-Etcheverry appeal the district
                   court's order denying judicial review of Ruling 6127. Benson-Etcheverry
                   also appeal the district court's subsequent order denying judicial review of
                   the State Engineer's approval of the 3M Plan.


                                                         A.
                               The State Engineer, who is charged with administering water
                   rights in this state, Desert Irrigation, Ltd. v. State, 113 Nev. 1049, 1061,
                   944 P.2d 835, 843 (1997), is required to approve applications to
                   appropriate new water rights or to change the place, manner, or use of
                   existing water rights if the applicant meets certain statutory
                   requirements. NRS 533.370(1). However:
                               Except as otherwise provided in subsection 10
                               [which excepts applications for environmental or
                               temporary permits], where there is no
                               unappropriated water in the proposed source of
                               supply, or where its proposed use or change
                               conflicts with existing rights or with protectable
                               interests in existing domestic wells as set forth in
                               NRS 533.024, or threatens to prove detrimental to




SUPREME COURT
        OF
     NEVADA
                                                          6
(0) 1947T    eto
                            the public interest, the State Engineer shall reject
                            the application and refuse to issue the requested
                            permit.
                MRS 533.370(2) (emphases added).
                            The State Engineer and KVR submit that the State Engineer
                may conditionally grant proposed use or change applications on the basis
                of future successful mitigation, thereby ensuring that the new or changed
                appropriation does not conflict with existing rights, in accordance with
                NRS 533.370(2). This court has never addressed whether the statute may
                be read in this manner, and we need not do so at this time Even
                assuming that the State Engineer may grant a proposed use or change
                application on the basis of the appropriator's ability to successfully
                mitigate and bring the existing water rights back to their full beneficial
                use, substantial evidence does not support the State Engineer's decision
                that this is the case here. Town of Eureka v. Office of State Eng'r of State
                of Nev., Div. of Water Res.,    108 Nev. 163, 165, 826 P.2d 948, 949 (1992)
                ("With questions of fact, the reviewing court must limit itself to a
                determination of whether substantial evidence in the record supports the
                State Engineer's decision.").
                                                      B.
                            The State Engineer in his Ruling 6127 recognized that there
                would be "extensive" drawdown of the water table in Kobeh Valley near
                KVR's main well field area due to KVR's groundwater pumping, which
                could "impact" existing "rights on springs and streams in hydrologic
                connection with the water table. . . incluthing] valley floor springs." He
                also recognized that:
                            Water rights that could potentially be impacted
                            are those rights on the valley floor where there is
                            predicted drawdown of the water table due to
SUPREME COURT
        OF
     NEVADA
                                                       7
(0) I947A
                           mine pumping. The Applicant recognizes that
                           certain water rights on springs in Kobeh Valley
                           are likely to be impacted by the proposed
                           pumping. These springs produce less than one
                           gallon per minute and provide water for livestock
                           purposes.
                (footnotes omitted). 2 But the evidence to which the State Engineer cited
                demonstrates that more than just an "impact" to these low-flow springs
                would occur. For instance, the State Engineer cited to KVR's
                hydrogeology expert Terry Katzer's testimony at the 2010 hearing that
                KVR's pumping would dry up certain springs and stock watering wells:
                           Q: Okay. Will the pumping over time cause
                           impacts to springs in direct stock watering wells
                           in the floor of Kobeh Valley?
                           A: I believe it will. And I can't name the springs
                           because I am not that familiar with them. Mud
                           Springs, for instance, I know where that is. I've
                           been there. It will probably dry that up with time.
                           And other springs that are in close proximity to
                           the well field.
                            Q: Stock watering wells?
                           A: Stock watering wells, yes, probably.
                Flow modeling reports by KVR's hydrogeology and groundwater modeling
                expert, Dwight Smith, to which the State Engineer also cited, confirmed
                this assessment:
                           Springs located in lower altitudes in the Roberts
                           Mountains . . . are more likely to be impacted due


                      2Eureka County challenges the "less than a gallon per minute"
                finding, but KVR's 2010 flow modeling report indicates that these springs
                produced less than a gallon per minute. And, while the inventory KVR
                prepared in 2011 shows an estimated less than five gallon flow for Mud
                Spring, this is not inconsistent with a less than one gallon flow finding.

SUPREME COURT
       OF
    NEVADA
                                                       8
(0) 190A    e
                            to closer proximity to the KVCWF [ Kobeh Valley
                            Central Well Field], resulting in larger predicted
                            drawdown at these locations. Discharge at Mud
                            Spring (Site 721) and Lone Mountain Spring (Site
                            742), located near the southeast edge of the
                            KVCWF near proposed well 226, are predicted to
                            be impacted and will likely cease to flow based on
                            predicted drawdowns of 40 to 50 feet. Both of
                            these springs discharge less than approximately
                            one gallon per minute.
                Smith also testified that Mud Springs and another spring called Lone
                Mountain Springs would cease to flow fairly soon after KVR begins
                pumping.
                            The federal Bureau of Land Management (BLM) claims
                unadjudicated reserved rights sourced from Lone Mountain Springs. And
                respondent Etcheverry Family, LP, holds permitted existing rights in Mud
                Springs, rights consisting of 10.86 afa to use for stock watering purposes.
                            Therefore, contrary to the State Engineer's, KVR's, and amici's
                assertions, KVR's pumping would not merely impact existing water rights;
                the very evidence upon which the State Engineer relied demonstrates that
                KVR's appropriation would cause the complete depletion of the source of
                existing water rights. The Legislature did not define exactly what it
                meant by the phrase "conflicts with" as used in NRS 533.370(2), but if an
                appropriation that would completely deplete the source of existing water
                rights does not "conflict with" those existing rights, then it is unclear what
                appropriation ever could. Furthermore, dictionary definitions from
                around the time a statute is enacted can aid this court in deciphering that
                statute's meaning, Douglas v. State, 130 Nev., Adv. Op. 31, 327 P.3d 492,
                494 (2014), and contemporaneous reference material with the
                Legislature's adoption of the "conflicts with" aspect of NRS 533.370(2),
                defines "conflict," in verb form, as "[t]o be in opposition; be contrary or at
SUPREME COURT
        OF
     NEVADA
                                                      9
(0) 1947A
                 variance." See 2 The Century Dictionary and Cyclopedia, with a New Atlas
                 of the World, at 1186 (rev, en!. ed. 1911); 1913 Nev. Stat., ch. 140, § 63. To
                 the extent that KVR's proposed appropriations would deplete the water
                 available to satisfy existing rights at issue, they are undeniably "in
                 opposition" thereto, and thus "conflict with" the existing rights under NRS
                 533.370(2). 3
                                                        C.
                                 Considered separate and apart from any potential mitigation
                 techniques, the appropriations in question are in conflict with existing
                 water rights in the valleys. But the State Engineer found KVR could
                 implement mitigation techniques that would ameliorate the depletion of
                 Mud Springs: "The State Engineer finds that this flow loss can be
                 adequately and fully mitigated by the Applicant should predicted impacts
                 occur." Furthermore, because "the only way to fully ensure that existing
                 water rights are protected is by closely monitoring hydrologic conditions
                 while groundwater pumping occurs," the State Engineer found that "a
                 monitoring, management and mitigation plan prepared with input from
                 Eureka County must be approved by the State Engineer prior to pumping
                 groundwater for the project." The State Engineer thus concluded that:
                 "Based upon substantial evidence and testimony, and the monitoring,
                 management and mitigation plan requirement, the State Engineer


                       3 The State Engineer's ruling states that though the BLM originally
                 protested KVR's appropriations, it withdrew its protests "after reaching a
                 stipulation on monitoring, management and mitigation" with KVR. It
                 seems the State Engineer assumed this was sufficient to dispense with the
                 conflict under NRS 533.370(2), but this is a less than clear conclusion. In
                 any event, Etcheverry Family, LP, has not withdrawn its protest of KVR's
                 applications.


SUPREME COURT
        OF
     NEVADA
                                                        10
(0) 1947A    e
                      concludes that the approval of the applications will not conflict with
                      existing water rights. . . ."
                                   Nowhere in the ruling, however, does the State Engineer
                      articulate what mitigation will encompass, even in the most general sense.
                      And evidence of what that mitigation would entail and whether it would
                      indeed fully restore the senior water rights at issue is lacking: there was
                      no mitigation plan in the record before the district court or in existence
                      when KVR's applications were granted. Indeed, KVR's representative
                      Patrick Rogers acknowledged that he didn't "know what we [General
                      Moly] would propose in a mitigation plan. A mitigation plan hasn't been
                      developed yet. It would be speculative to say what we would or would not
                      propose."
                                   The State Engineer and KVR point to KVR's experts'
                      testimony as evidence that mitigation could occur and would be successful.
                      But Katzer, an hydrology expert, testified only that there were "a variety
                      of [mitigation] techniques. You could increase the well if it's being fed by a
                      well or you could run a pipeline to it from part of the distribution system."
                      KVR's other expert, Smith, similarly testified that if predicted water table
                      drawdown were to occur due to KVR's pumping, "certainly there can be
                      mitigation measures taken, many of which could include shifting[ ]
                      pumping around the well field as an easy example." While KVR's experts
                      testified as to the existence of a few possible mitigation techniques, they
                      did not specify what techniques would work, much less techniques that
                      could be implemented to mitigate the conflict with the existing rights in
                      this particular case. And concerns over precisely how KVR, or its parent
                      company Eureka Moly, would mitigate these conflicts are not without
                      cause: Martin Etcheverry testified that after KVR did some experimental

SUPREME COURT
        OF
     NEVADA
                                                            11
(0) 1947A    .(efi
                 jo
                pumping, one of his springs, Nichols Springs, was noticeably lower than
                before the pumping and that it had not yet returned to its pre-pumping
                levels. And according to Eureka County's natural resource manager, the
                Nichols Springs lowering was brought to Eureka Moly's attention multiple
                times, including at a meeting at the BLM's Battle Mountain office, but
                that neither KVR nor Eureka Moly had done anything to address the
                lowering of that spring.
                            The State Engineer and KVR alternatively assert the existing
                rights holders conceded that mitigation could be accomplished. But the
                existing rights holders, including Martin Etcheverry, merely recognized in
                their 2010 hearing testimony that they would be satisfied if KVR could
                completely and successfully mitigate the interference with their rights.
                            The State Engineer implies on appeal that KVR's mitigation
                could encompass providing substitute water to the senior rights holders by
                arguing that said holders are entitled only to the beneficial use of the
                amount of their water rights, and have no right to the historical source of
                their water rights.   See Desert Irrigation, Ltd. v. State, 113 Nev. 1049,
                1059, 944 P.2d 835, 842 (1997) ("[E]ven those holding certificated, vested,
                or perfected water rights do not own or acquire title to water. They merely
                enjoy the right to beneficial use."). But to the extent KVR's mitigation
                would involve substitute water sources—which is not reflected in the State
                Engineer's decision or the evidence that was presented to him—there was
                no evidence before the State Engineer that KVR applied for or committed
                certain of its already obtained water rights to mitigation or where the
                substituted water would otherwise come from. And, using the State
                Engineer's numbers regarding the amount of water in the basin, there
                may not be any water left to use for mitigation after KVR's appropriation.

SUPREME COURT
        OF
      NEVADA
                                                     12
(o>
                  The State Engineer found Kobeh Valley had 15,000 afa total. KVR's
                  appropriation is 11,300 afa, and the other committed rights had 1,100 afa,
                  which left 2,600 afa for future appropriation. However, there is 5,530 afa
                  in nonadjudicated claims to vested or reserved rights on file in the State
                  Engineer's office.
                               This is setting aside the further, specious assumption that
                  water from a different source would be a sufficient replacement. Take, for
                  example, the testimony given by an existing rights holder before the State
                  Engineer that he had seen problems before with piping in water for
                  animals because the pipes can freeze and interfere with the flow in the
                  extreme winter cold. Given these, seemingly supported, concerns over
                  such potential problems, it is therefore unclear that substitution water, if
                  available, would be sufficient. See, e.g., Weibert v. Rothe Bros., Inc., 618
                  P.2d 1367, 1373 (Colo. 1980) ("In order to determine the adequacy of the
                  [augmentation] plan to accomplish its intended purpose, it is necessary to
                  consider the adequacy of the replacement water rights."); see also Rocky
                  Ford Irrigation Co. v. Kents Lake Reservoir Co., 135 P.2d 108, 114 (Utah
                  1943) (examining whether the exchange of water deteriorates water
                  quality or quantity to such a degree as to "materially impair I ] the use").
                               Added to this, a surface water rights holder may be found to
                  have abandoned its right if it no longer delivers the water or maintains
                  the source of diversion. NRS 533.060(4)(a)-(d). Requiring that existing
                  rights holders use water other than from the source that they currently
                  have rights in might mean the existing rights holder would need to obtain
                  a new permit to appropriate that new water.       See NRS 533.060(5) ("Any
                  such right to appropriate any of the water must be initiated by applying to
                  the State Engineer for a permit to appropriate the water as provided in

SUPREME COURT
        OF
     NEVADA
                                                        13
(0) 1947A    eo
                this chapter."). KVR did not address before the State Engineer this
                potential obstacle to providing water from an alternate source to mitigate,
                and neither did the State Engineer's ruling.
                            Finally, KVR asserts that the State Engineer's determination
                that "it is readily feasible to avoid conflicts when mitigating impacts to
                water sources that produce relatively minor amounts of water" merely
                reflects the State Engineer's "experience and common sense" But this is
                precisely the problem with the State Engineer's ruling though the State
                Engineer certainly may use his experience to inform his decision making,
                his decisions must be supported by substantial evidence in the record
                before him, which is not the case here. Town of Eureka, 108 Nev. at 165,
                826 P.2d at 949.
                                                    D.
                            Essentially, and with all other arguments aside, the State
                Engineer and KVR's position is that the State Engineer may leave for a
                later day, namely the day the 3M Plan is put before him, the
                determination of exactly what KVR's mitigation would entail. But the
                State Engineer's decision to grant an application, which requires a
                determination that the proposed use or change would not conflict with
                existing rights, NRS 533.370(2), must be made upon presently known
                substantial evidence, rather than information to be determined in the
                future, for important reasons.
                            First, those who protest an application to appropriate or
                change existing water rights must have a full opportunity to be heard, a
                right that includes the ability to challenge the evidence upon which the
                State Engineer's decision may be based. Revert v. Ray, 95 Nev. 782, 787,
                603 P.2d 262, 264 (1979); see also NRS 533.365(5) ("Each applicant and
                each protestant shall ... provide to the State Engineer and to each
SUPREME COURT
     OF
   NEVADA
                                                     14
(0) 947A CD),
                 protestant and each applicant information required by the State Engineer
                 relating to the application or protest.").   Cf. Bowman Transp., Inc. v.
                 Arkansas-Best Freight Sys., Inc., 419 U.S. 281, 288 n.4 (1974) ("[Tlhe Due
                 Process Clause forbids an agency to use evidence in a way that forecloses
                 an opportunity to offer a contrary presentation."). This necessarily means
                 that the opportunity to challenge the evidence must be given before the
                 State Engineer grants proposed use or change applications. Those who
                 protest an application's grant cannot be forced to wait and challenge a
                 future 3M Plan because, as Benson-Etcheverry note: "The appeal as to
                 Ruling No. 6127 can result in vacating the Ruling, among other remedies.
                 However, appeal of the 3M Plan can only result in vacating the Plan." In
                 other words, challenging the sufficiency of a later developed mitigation
                 plan cannot undo a decision to grant applications for a proposed use or
                 change that may have been erroneous. And allowing the State Engineer
                 to grant applications conditioned upon development of a future 3M Plan
                 when the resulting appropriations would otherwise conflict with existing
                 rights, could potentially violate protestants' rights to a full and fair
                 hearing on the matter, a rule rooted in due process.    Revert, 95 Nev. at
                 787, 603 P.2d at 264.
                             Furthermore, the State Engineer's decision to grant an
                 application must be sufficiently explained and supported to allow for
                 judicial review. Id., 603 P.2d at 265; see also Port of Jacksonville Mar. Ad
                 Hoc Comm., Inc. v. U.S. Coast Guard, 788 F.2d 705, 708 (11th Cir. 1986)
                 (even under deferential substantial evidence review, courts must not
                 merely "rubber stamp" agency action: they must determine that the
                 "agency articulated a rational connection between the facts presented" and
                 the decision) (internal quotation omitted). The State Engineer thus may

SUPREME COURT
        OF
     NEVADA
                                                      15
(0) 1947A    0
                not defer the determination of what mitigation would encompass to a later
                date: even if he may grant applications where the resulting appropriations
                would conflict with existing rights based upon the finding that the
                applicant would be able to successfully mitigate that deleterious effect, an
                assumption we do not adopt today, the finding must be based upon
                evidence in the record to support that mitigation would be successful and
                adequate to fully protect those existing Tights. See City of Reno v. Citizens
                for Cold Springs, 126 Nev. 263, 276, 236 P.3d 10, 18-19 (2010) (law
                requiring local governments to make a finding about plans for adequate
                services and infrastructure prior to amending a master plan to allow
                further development "require [d] something more than the deferral of the
                issue or broad, evasive conclusions about how officials can build or expand
                utilities if necessary").


                             In sum, substantial evidence does not support the State
                Engineer's finding that KVR would be able to "adequately and fully"
                mitigate the fact that its groundwater appropriations will cause Kobeh
                Valley springs that sources existing rights to cease to flow. The State
                Engineer's decision to grant KVR's applications, when the result of the
                appropriations would conflict with existing rights, and based upon
                unsupported findings that mitigation would be sufficient to rectify the
                conflict, violates the Legislature's directive that the State Engineer must
                deny use or change applications when the use or change would conflict
                with existing rights. NRS 533.370(2). As appellants have met their
                burden to show the State Engineer's decision was incorrect, NRS
                533.450(10), the State Engineer's decision to grant KVR's applications
                cannot stand.

SUPREME COURT
        OF
     NEVADA
                                                      16
(0) 19474
                                 We therefore reverse and remand these matters to the district
                   court for proceedings consistent with this opinion. 4 Because we reverse
                   and remand on this basis, we do not reach the remaining issues raised in
                   these consolidated appeals.


                                                                  Poem
                                                              Pickering
                                                                        Cup             , J.



                   We concur:


                                 η         , C.J.
                   Hardesty                                   Parraguirre

                             )

                              nA              , J.               2.ok
                                                                 -
                                                                        szoit
                                                                                rvtiV   , J.
                   Douglas                                    Cherry



                   Saitta
                                                 J.
                                                                aeJ
                                                                bbons




                            4 From
                                the record and Ruling 6127, it is unclear which of KVR's
                   applications for proposed use or change in Kobeh Valley, if it can be
                   pinpointed, is the appropriation that will cause the springs to dry •up.
                   Therefore, we must overturn the entire decision.

SUPREME COURT
        OF
     NEVADA
                                                         17