STATE OF VERMONT
ENVIRONMENTAL COURT
}
In re: Zurn Sisters Development, LLC - } Docket No. 233-9-06 Vtec
Act 250 Jurisdictional Opinion }
No. DEC6-2006-1 (Reconsideration) }
}
Decision and Order on Merits, Submitted by Cross-Motions for Summary Judgment
Appellant Zurn Sisters Development, LLC, appealed from a Jurisdictional Opinion
of the District 6 Environmental Coordinator that its subdivision project requires an Act 250
permit. Appellant is represented by Thomas G. Walsh, Esq.; Intervenors Robert and Mary
Ellen Jolley are represented by Howard J. Seaver, Esq.; the City of St. Albans is represented
by Robert E. Farrar, Esq. Owners of one of the lots in the subdivision, Karl and Jane Zurn,
entered their appearances and represent themselves. A neighbor to the west of the
property, Paula Gamache Carlson, also entered her appearance representing herself. The
Natural Resources Board did not enter an appearance in this appeal.
Appellant and Intervenors Jolley each moved for summary judgment on whether
Appellant’s project requires an Act 250 permit as a subdivision of more than ten lots within
a five-year period. On the record of the final pretrial conference held on October 1, 2007
(after the motions were briefed), the participating parties requested that the trial scheduled
for October 12, 2007 be cancelled and that the entire merits of the appeal be submitted
through the already-filed summary judgment1 motions, including the Court’s consideration
1
The Vermont Supreme Court has noted that the trial courts “should be cautious
in granting motions for summary judgment in any cases in which the resolution of the
dispositive issue requires determination of state of mind, as the fact finder normally should
be given the opportunity to make a determination of the credibility of witnesses, and the
demeanor of the witness whose state of mind is at issue.” Barbagallo v. Gregory, 150 Vt.
1
of the complete deposition testimony of various witnesses. The trial was cancelled and the
parties were given an opportunity to supplement their memoranda. The following facts
are undisputed unless otherwise noted.
On November 21, 2003, Karl and Jane Zurn acquired an 18.36-acre parcel of land on
the northerly side of Congress Street, across Congress Street from the end of Smith Street.
Approximately eleven acres of the property is located in the City of St. Albans and
approximately seven acres in the Town of St. Albans. The property bears the address of
121 Congress Street and is sometimes known as the “Governor Smith” property. The
property slopes down from its northeasterly corner in the Town portion of the property,
towards the southwest, losing approximately eighty feet of elevation within the City
portion of the property alone.
Karl and Jane Zurn first envisioned building a residence for themselves on the
property, and subdividing at least the remainder of the land in the City. However, after
Karl and Jane Zurn purchased other property for their residence in Fairfield in early 2004,
they began to consider different ideas for the development of the subject property. At least
three potential development layouts were prepared by David Burke of O’Leary-Burke Civil
Associates (the project engineer), in January, March and April of 2004.2 These plans show
ten or twelve lots on the property in the City; one shows a larger lot to accommodate three
four-unit buildings. All three of these plans show access into the property from Congress
Street by a T-shaped roadway, with a north-south segment leading from Congress Street
653, 653 (1988) (mem.) (citations omitted). However, in the present case the parties agreed
to present the case on summary judgment, including the complete depositions of the
witnesses who would have testified at trial, even though the issue turns on the “intent” of
the developer.
2
These dates are based on the drawing date and, if legible, the marginal print dates
on the three plans from early 2004 provided as Jolley Exhibit F-7.
2
into the property, directly across Congress Street from the existing intersection with Smith
Street, to create a standard four-way intersection. All three of the plans show the
subdivision roadway as having two east-west segments, one extending easterly from the
T intersection and one extending westerly from the T intersection, each with a cul-de-sac
or turnaround at its end.
In March of 2004, Karl Zurn wrote a short handwritten note to the City’s Zoning
Administrator stating that he was “looking to do a 10-lot subdivision” with nine of the lots
proposed for single family homes and the tenth lot proposed for three “fourplex
townhouses.” The Zoning Administrator replied, also in handwriting, that such a plan
would “require 9 lots of 9,500 [square feet] each and one lot of 3 acres for a Planned
Residential Development [PRD] for the 12 townhouses.”
The City of St. Albans Development Review Board (DRB) considered this proposal
at its April 5, 2004 public hearing, characterizing the proposal as a “sketch plan,” that is,
the most preliminary stage of subdivision approval. See In re Appeal of Carroll, 2007 VT
19, ¶¶ 13–14 (describing the stages of the subdivision approval process). Mr. Zurn stated
at the April 2004 hearing that “he knows he will have to go through Act 250” for this
proposal. The DRB issued a written letter on April 14, 2004, stating that the proposed
subdivision was classified as ‘major,’ that the project would require Act 250 approval, and
listing the extensive additional information that the DRB would require for the next
hearing or any further steps in the subdivision process, and requesting that the project
engineer attend future DRB hearings. As explained by the Zoning Administrator during
that hearing, the project as shown in the April 2004 sketch plan would have needed
conditional use approval for the PRD, as well as preliminary and final subdivision approval
for the subdivision. No plans for this larger project were ever submitted to the DRB beyond
this initial conceptual or sketch plan.
However, in the summer of 2004, attorney James Levy approached Mr. Zurn about
3
the possibility of Mr. Zurn’s selling all or part of the Governor Smith property so that the
property might be preserved as undeveloped. He volunteered to act as a facilitator to try
to find a municipal or non-profit buyer, and asked Mr. Zurn what would be the smallest
subdivision he would be willing to consider in connection with the conveyance of the
remainder of the property to such a buyer. Mr. Zurn informed Mr. Levy that he would be
willing to consider such a plan if it included six house lots. These discussions continued
throughout the summer and early autumn of 2004 and included representatives of the City,
and representatives of a local land trust that administers the adjacent Aldis Hill Playground
land in the Town.
As of September 15, 2004, the engineering firm had drawn up a new sketch plan,
showing an initial layout for the subdivision, including a single north-south subdivision
roadway culminating in a cul-de-sac, six house lots and a lot for a stormwater retention
pond (all located to the east or north of the subdivision roadway), and showing the
remaining land within the City and Town as an undivided 13.3 acres of “retained land.”
In this plan, the subdivision roadway ends in a cul-de-sac, without any east-west segments.
The City DRB held a public hearing on September 20, 2004, regarding a proposal
from Mr. Zurn that the DRB again characterized as a “sketch plan,” this time for a
“proposed seven (7) lot sub division (6 single family homes and one undeveloped lot).”
On September 21, 2004, Mr. Zurn sent a short typewritten letter to the DRB, confirming
that “[t]his letter is to inform you of our intent to develop the Governor Smith property.
At this time we are proposing to develop 6 lots as single-family dwellings and to sell the
remaining property to non-profit entities.”
The DRB issued a written letter on October 15, 2004, again simply describing the
project in a section entitled “Findings of Fact” and requesting additional listed information
“[i]n order for the Development Review Board to make completely informed decisions in
the future steps of the subdivision process.”
4
The last meeting organized by Mr. Levy to discuss the potential sale of the
remaining property to the City or to a private non-profit entity was held on October 29,
2004. Mr. Levy’s last contact with Mr. Zurn was at that meeting. The Aldis Hill Trust
expressed an interest at that meeting in acquiring the land in the Town. The City was
unable to find funding for the purchase of the remaining land in the City; the City’s
Community Development Director informed Mr. Zurn of that fact by telephone in early
2005.
Karl and Jane Zurn continued to pursue the development of only the six house lots
and the stormwater lot on the westerly portion of the property located in the City. The
project engineer prepared a plan dated December 27, 2004, consisting of six sheets3,
showing eight lots: the six house lots and the stormwater pond lot (all lying to the west or
north of the subdivision roadway), comprising approximately 4.09 acres, and an eighth lot
consisting of the 13.3 acres of retained land, approximately half of which lies within the
City and half in the Town.
In late December of 2004 and early January of 2005, as part of their estate plan, Karl
and Jane Zurn deeded the entire 18-acre property to their three daughters, Jane Brooks
Zurn, Bridget McMahon Zurn, and Mary Zurn Herrera, giving them each undivided equal
interests in the property as tenants in common.
On May 13,4 2005, under title of “Zurn Parcel,” the project engineer prepared a plan
3
This plan is referred to in Mr. Burke’s deposition and in the Island Excavating
Corp. site work proposal, but has not been provided to the Court, nor is there any
indication as to whether this plan or some similar plan was presented to the DRB for
preliminary plat approval.
4
The date of this plan is inferred from the first revision date on Appellant’s Exhibit
G; the second revision date shown on Exhibit G is the August 1, 2006 preparation of the
“record” site plan apparently submitted with the application for the as-built approval
considered in September of 2006. The Court has not been provided with the version of the
5
containing “General Revisions for Final Submittal” to the DRB. This plan contains details
of the proposal subdivision street,5 six development lots, and stormwater pond lot, but
represents only a portion of the “Remaining Lands,” which are still referred to as
comprising 13.30 acres. The remainder of the site plan sheets prepared for this application,
showing the details of any utility lines or connections as then proposed within the
subdivision street right-of-way, has not been provided to the Court in connection with the
present motions. On June 28, 2005, the City approved the project’s connection to the
municipal potable water supply and to the municipal sanitary sewer.
On July 20, 2005, Island Excavating Corp. submitted a proposal to Karl Zurn for the
site work necessary for the completion of the project plans prepared by the civil
engineering firm. The proposal refers to the plans as Sheets 1 through 6 of the plans and
specifications dated December 27, 2004.
An application was submitted to the State Agency of Natural Resources on July 26,
2005, for state approval of the potable water supply and wastewater disposal to serve the
six lots. If a separate site plan was prepared for this application, or if one of the existing site
plans was submitted with this application, showing the details of those connections as then
proposed within the subdivision street right-of-way, such a plan has not been provided to
the Court in connection with the present motions. The parties do not dispute that the water
line to serve the project ran under the sidewalk along the west side of the project street’s
right-of-way, and that the sewer line to serve the project ran under the centerline of the
project street’s right-of-way.
plan that received final subdivision approval from the City DRB, or the date of that
approval.
5
The parties do not dispute that the subdivision roadway was proposed to become
a City street.
6
A project review sheet was issued in August of 2005, showing no Act 250 jurisdiction
as of that time. It has not been provided to the Court in connection with the present
motions.
The State Agency of Natural Resources approved the water supply and wastewater
disposal permit for the project in October of 2005. It has not been provided to the Court
in connection with the present motions.
The final subdivision plan must have been approved by the City DRB at some time
prior to December 6, 2005, as a plan marked “final” was received for filing in the City’s
land records on December 6, 2005. The photocopy of the portion of this plan provided to
the Court as Jolley Exhibit F-4 is not complete in that it does not show all of the signature
block or its revision dates, or whether the DRB stamped it as approved for filing. That plan
shows the lot layout of the six house lots, the stormwater pond lot, the street and the
“remaining lands” lot. It also shows a 20-foot-wide “access easement” leading from the
east side of the subdivision street across the portion of the “remaining lands” in the City,
giving access to the “Aldis Hill Playground” lands in the Town, “to be centered on future
access.” The note on the plan also states “[s]hould the retained lands be developed at a
future date, this easement will be relinquished and a new access easement shall be
provided.”
By a deed recorded on January 4, 2006 (signed on December 15 and December 19,
2005), the three Zurn sisters conveyed their interests in the property to Appellant Zurn
Sisters Development, LLC (“ZSD”). Bridget McMahon Zurn signed the property transfer
tax return on behalf of ZSD. The three sisters are the only managers, principals, or officers
of ZSD. Also on December 15, 2005, they as individuals conveyed an easement to Central
Vermont Public Service Corporation and Verizon of New England as tenants in common
for the purpose of installing electricity and communications lines over the property from
Congress Street “to serve present and future development of Grantors.” In February of
7
2006, ZSD granted Vermont Gas Systems, Inc. an easement as necessary to provide gas
service to “each and every building to be built” in the development in which it has
customers. Three gas valves shown on the August 1, 2006 record drawing show that a gas
line was installed on the property; it was installed within the east side of the right-of-way,
to obtain the required isolation distance from the other utilities. Therefore, the gas service
lines were installed from the east side line across the subdivision street to the west side to
serve any of the six approved lots to the west and north of the subdivision street and cul-
de-sac.
The excavating and site work on the infrastructure for the project was done in the
winter of 2005 into early 2006. Subsurface drains were installed along the east side of the
street, tied into a line running under the road to the stormwater retention pond, to keep
stormwater runoff from the higher-elevation easterly undeveloped portion of the property
from running onto the surface of the subdivision street. The October 18, 2006 decision of
the City DRB approving this work reflects a finding that the “lateral water running on the
east side of the access road caused the need to install street footing drains to be added and
directed to the retention water pond to catch water runoff from higher elevations;” that is,
that the footing drains serve the subdivision street rather than serving potential additional
lots on the east side of the street.
At some point while the water and sewer lines were being installed, the site work
and excavation contractor suggested that, if there might be any possibility of developing
the land on the east side of the street in the future, it would be a cost savings during the
initial site work to extend stubs or connections for sewer and water service across to the
east side of the street, so that the municipal street would not have to be dug up again. It
would cost as much as ten times more to dig up the street and the lines for that purpose
after the street and sidewalk were constructed and paved, than it would to extend those
lines to the east edge of the right-of-way during the initial site work on the street. The idea
8
of installing stubs on the east side of the right-of-way was made by the contractor to the
project engineer and project manager, who discussed it with Bridget Zurn and obtained her
approval of the change order for the additional site work.
Any future lots to be served by a future east-west subdivision roadway in the
vicinity of the access easement to the Aldis Hill lands would be served by water and sewer
lines extending along that new subdivision roadway and would not require individual
water or sewer connections along the east side of the existing subdivision street.
Accordingly, on December 29, 2005 the project engineer drafted a concept plan for a second
phase of development, which was used only by him to determine the appropriate locations
for, and numbers and sizes of, sewer and water stubs, and to show these to the contractor.
This plan was not submitted to the City or the State for any purpose, was not recorded
anywhere, and was not attached to any application. The late December 2005 concept plan
was similar to the ones originally drafted in 2004, and showed three or four6 potential lots
that might require sewer and water service from the east side of the existing north-south
subdivision street, with the remaining five or six potential lots obtaining service from an
east-west subdivision roadway extending easterly from the existing cul-de-sac.
Bridget McMahon Zurn approved the contract change order on January 12, 2006,
adding four sewer and four water stubs to the Island Excavating contract. Accordingly,
four7 water and five sewer stubs were installed along the east side of the existing north-
south subdivision street, just beyond the street right-of-way. Of these, three of the water
stubs and four of the sewer stubs were of an appropriate size to serve a single-family
6
Lot 12 is placed on the late December concept plan in a position that could
potentially obtain service from either location.
7
The September 1, 2006 record drawing (Appellant’s Exhibit G) depicts a total of
four water stubs on the east side of the road, but states, next to the most southerly of the
water stubs: “typical existing water stub with shut-off (5 total east side of road).”
9
house. The fifth sewer stub and the fourth water stub were installed near the intersection
of the east-west easement with the existing north-south subdivision street, sized to allow
the future extension of water and sewer service along that easement to serve additional
lots. After installing the stubs underground, the contractor installed vertical plastic piping
extending above the surface of the ground to mark the locations of the underground stubs,
labeling these either by the individual lot numbers with reference to the late December 2005
concept plan, or by the phrase Phase II for the larger-sized ones located near the access
easement.
Similarly, electric service was installed to electric pedestals and transformers on the
west side of the subdivision street, but no individual electric stubs were installed on the
east side of the subdivision street. Rather, a single electric service line crosses the
subdivision street to pedestals at the east side of the neck of the cul-de-sac. A future
transformer installation would be necessary to provide electric service from that location
to any future individual house lots.
Two of the six development lots in the subdivision have been sold: Lot 1 to Karl and
Jane Zurn on April 20, 2006, and Lot 5 to John and Susan Palmer (as trustees of their Joint
Revocable Trust) on May 16, 2006.
Based on field location surveys conducted on July 28, 2006, and on various site visits
and the project engineer on September 1, 2006 prepared the Record Drawing for the
subdivision, showing the building envelopes for the six house lots, showing the stormwater
retention pond, and showing the as-built street, sidewalk, and infrastructure installation,
including water, sewer, and stormwater infrastructure, electric, telephone and television
pedestals and electric transformer pads, and gas sleeves and valves.
The City DRB held a public hearing on September 18, 2006, to consider
“amendments to a previously-approved site plan” to address the changes that had
occurred during construction. Its decision, issued on October 18, 2006, approved the
10
various changes, and noted that public comment on the amendment had included
questions “about circumventing Act 250 by spacing out the subdivision.” It made findings
that the utility stubs at issue in the present appeal were added so that ZSD “would not
have to dig up the road if they wanted to expand”; the findings characterize the stubs as
being added “for future expansion,” “for future access,” or for “phase two” of the project.
An Act 250 permit is required for the sale or offer for sale of any interest in “a
subdivision.” 10 V.S.A. § 6081(a). In a municipality which has duly adopted permanent
zoning and subdivision bylaws,8 the term “subdivision” is defined, in pertinent part, as
“a tract or tracts of land, owned or controlled by a person, which the person has partitioned
or divided for the purpose of resale into 10 or more lots [within a defined geographical
area] within any continuous period of five years.” 10 V.S.A. § 6001(19) (emphasis added).
That is, unless at least ten lots have been created within a five-year period, the project falls
outside this definition of the term “subdivision.”
The definition also excludes lots created to be conveyed to a qualified holder of
conservation rights and interest. If the land in the Town has been or will be conveyed to
the Aldis Hill Trust, the partition of the land at the City-Town boundary will not be
counted as the creation of a lot.
The Land Use Panel of the Natural Resources Board, as the successor to the
Environmental Board, revised the former Environmental Board Rules effective as of May
1, 2006 (the Act 250 Rules). With respect to the provisions of Rule 2(B) regarding
8
Both the City of St. Albans and the Town of St. Albans have adopted such bylaws;
this decision does not further consider the sections of the statute or rules applicable in
municipalities without such bylaws.
11
subdivisions, the current Act 250 Rules contain essentially the same provisions9 as former
Environmental Board Rule 2(B), albeit organized more clearly.
Section 1 of Act 250 Rule 2(B) contains the provisions for determining how to count
the statutory “continuous five-year period.” The period begins with the latest of any of
four listed events: the filing of a plot plan in the town records after the issuance of any
required local or state approval; the issuance of a municipal subdivision or zoning permit;
the issuance of a state subdivision permit or a state water supply and wastewater disposal
permit; or, in the absence of any of the first three events, the legal conveyance of a lot.
For the purposes of commencing the count of the five-year period in the present
appeal, the latest of the listed events appears to have occurred some time in 2006, either
with the conveyance of the first lot to Karl and Jane Zurn in April of 2006, under subsection
2(B)(1)(d), or with the issuance of the as-built site plan approval by the City DRB on
October 18, 2006, under subsection 2(B)(1)(b), or with a later filing of its revised site plan
in the town records, if such a filing did occur. In the present appeal, no party suggests that
the applicable five-year period expires any earlier than 2011.
Section 2 of Act 250 Rule 2(B) provides that a subdivision will be considered to have
been created as of the occurrence of the earliest of any of four listed events, of which
subsection (a) is the only one the parties or the Jurisdictional Opinion considered to be even
potentially applicable10 to the present case. It is triggered by the sale of (or the offer to sell
9
The parties do not argue that there is any applicable difference between the former
and current rules.
10
The other subsections trigger Act 250 jurisdiction by the filing of a plot plan for
an at-least-ten-lot subdivision in the town records (or in a complete application for a
municipal subdivision or zoning permit, or for a state subdivision permit or a state water
supply and wastewater disposal permit); or by the covers the sale or offer to sell or lease
the tenth lot within the five year period.
12
or lease) the first lot in the subdivision, if and only if that sale or offer is combined “with
an intention to sell, offer for sale, or lease: ten or more lots. . . .” Subsection (a) also
provides that a “person’s intention to create a subdivision may be inferred from the
existence of a plot plan, the person’s statements to financial agents or potential purchasers,
or other similar evidence.” Subsection (a) is the only one that requires an analysis of intent.
It is important to bear in mind that the “intention to create a subdivision” referenced
in the second sentence of the rule necessarily incorporates the statutory definition of
subdivision, requiring that the intention to create the ten or more lots be an intention to do
so within the statutory period of five years. To interpret the rule otherwise would extend
it beyond the jurisdictional limits of the statute. An administrative rule should not be
interpreted in a way that is inconsistent with its enabling statute, or in a way that produces
an unreasonable result. Lemieux v. Tri-State Lotto Comm’n, 164 Vt. 110, 116–17 (1995).
This Court must apply the substantive standards11 of Act 250 that were applicable
before the District Coordinator, 10 V.S.A. § 8504(h). By its terms, 10 V.S.A. § 6001(19)
allows a landowner to create a nine-lot subdivision every five years (as the period is
measured according to the rule) without triggering the need for an Act 250 permit. It is
beyond the Court’s role to alter the standards found in the legislation, which reflects the
legislative policy that municipal and other state permits would be sufficient for projects
that are smaller than this threshold number of lots-per-time-period.
Moreover, even if a developer were to have the present intention to develop
successive nine-lot subdivisions every five years into the future, so as to avoid Act 250
11
The Court must also give prior decisions of the former Environmental Board the
same weight and consideration as it gives its own prior decisions. 10 V.S.A. § 8504(m). The
Court has considered the two decisions to which the parties have directed the Court’s
attention, Donald I. Gurney, #2S0923-EB (Vt. Envtl. Bd. Nov. 2, 1993) and Black Willow
Farm, DR #202 (Vt. Envtl. Bd. June 30, 1989), but has not given them great weight, as the
fact patterns in those cases are not sufficiently similar to those in the present case.
13
jurisdiction, such an intention does not constitute an evasion of the statute because it is
allowed by the statute. A contrary interpretation would render surplusage of the statutory
five-year provision.
The recognized canons of statutory construction are applicable to this appeal. In re:
Kim Wong Notices of Violation, Docket Nos. 169-7-06 Vtec and 293-12-06 Vtec, slip op. at
2 (Vt. Envtl. Ct., Mar. 12, 2007). The court must “construe words according to their plain
and ordinary meaning, giving effect to the whole and every part of the ordinance,” In re
Stowe Club Highlands, 164 Vt. 272, 279–80 (1995) (citation omitted), so that no language
is surplusage, In re Dunnett, 172 Vt. 196, 199 (2001), and so that the construction does not
produce an absurd result. Willard v. Parsons Hill Partnership, 2005 VT 69, ¶21, 178 Vt. 300,
308 (2005).
As of the spring of 2006 when the first lot was sold, and, indeed, through the
briefing of the present appeal, the evidence supports only a conclusion that ZSD’s intent
in placing the stubs prior to the completion and paving of the street was to keep its options
open for the potential development of the remainder of the land at some undefined time
in the future. The evidence, including the note on the plot plan recorded in December of
2005 that “[s]hould the retained lands be developed at a future date, this easement will be
relinquished and a new access easement shall be provided,” and including the
circumstances of the placement, installation and labeling of the stubs, does not support a
conclusion that ZSD had the intention further to develop those retained lands prior to the
expiration12 of the five-year period in 2011.
12
Appellant has itself noted that if it were to proceed, before the end of the five-year
period, further to subdivide the retained land to create a total of ten or more lots, Act 250
jurisdiction will be triggered.
14
Accordingly, based on the foregoing, it is hereby ORDERED and ADJUDGED that
Intervenor Jolleys’ Motion for Summary Judgment is DENIED, and Appellant’s Motion for
Summary Judgment is GRANTED: that as of the sale of the first lot the development
proposed for the parcel constituted only an eight-lot subdivision within the five-year
period and therefore did not trigger Act 250 Jurisdiction. The September 1, 2006
Reconsidered Jurisdictional Opinion of the District Coordinator in No. DEC6-2006-1
(Reconsideration) is therefore reversed and vacated, concluding this appeal.
Done at Berlin, Vermont, this 9th day of November, 2007.
_________________________________________________
Merideth Wright
Environmental Judge
15