In the United States Court of Federal Claims
No. 19-471L
(Filed: April 1, 2022)
***************************************
ATS FORD DRIVE INVESTMENT, LLC * Trails Act; Cross-Motions for Summary
et al., * Judgment; Property Interest Acquired by
* the Railroad Company; Indiana Law;
Plaintiffs, * Legislative Charter; Adverse Possession;
* Prescription; Centerline Presumption;
v. * Competing Claims of Property Owners
* Association and Individual Property
THE UNITED STATES, * Owners; Lost Conveyance Instruments; ICC
* Valuation Schedules and Maps; Burdens of
Defendant. * Proof; Quitclaim Deed; Common Property
***************************************
Mark F. Hearne, II, St. Louis, MO, for plaintiffs.
Brian R. Herman, United States Department of Justice, Washington, DC, for defendant.
OPINION AND ORDER
SWEENEY, Senior Judge
Plaintiffs in this case, along with plaintiffs in five other cases before the undersigned,
own real property adjacent to a railroad corridor in Marion and Hamilton Counties, Indiana. 1
They contend that the United States violated the Fifth Amendment to the United States
Constitution by authorizing the conversion of the railroad corridor into a recreational trail
pursuant to the National Trails System Act (“Trails Act”), thus acquiring their property by
inverse condemnation. Four of the cases are proceeding in a coordinated manner, and a subset of
plaintiffs from these cases assert claims that require the resolution of common threshold title
issues. To resolve these issues, the parties in Pressly and ATS Ford cross-move for summary
judgment. As explained in more detail below, the court grants in part and denies in part both
motions in each case.
1
The six cases are Oldham v. United States, No. 18-1961L (consolidated with Overlook
At The Fairgrounds LP v. United States, No. 18-1962L); Pressly v United States, No. 18-1964L
(consolidated with Jones v. United States, No. 19-1375L); Bradley v. United States, No. 19-
400L; ATS Ford Drive Investment, LLC v. United States, No. 19-471L (“ATS Ford”); Episcopal
Diocese of Indianapolis v. United States, No. 19-881L; and Doyle v. United States, No. 19-882L.
A seventh case, ID Castings, LLC v. United States, No. 19-1158L, was voluntarily dismissed
upon the parties’ settlement of the plaintiff’s claim.
I. BACKGROUND
On January 19, 1846, the Indiana General Assembly enacted an “Act to incorporate the
Peru and Indianapolis Railroad Company.” 2 Pursuant to that legislative charter, the Peru and
Indianapolis Railroad Company (“PIRC”) was authorized to construct a railroad line within
Indiana originating in the town of Peru, running through the towns of Kokomo and Noblesville,
and terminating in Indianapolis. The legislative charter provided that the railroad corridor was to
be no more than eighty feet wide, and could be acquired using a number of mechanisms:
Sec. 15. It shall be lawful for the corporation, either before or after the
location of any section of the Road, to obtain from the persons through whose
land the same may pass, a relinquishment of so much of the land as may be
necessary for the construction and location of the road; as also, the stone, gravel
and timber, and other materials that may be obtained on the said route, and may
contract for stone, gravel, timber, and other materials that may be obtained from
any land near thereto: and it shall be lawful for said corporation to receive by
donations, gifts, grants, or bequests, land, money, labor, property, stone, gravel,
wood, or other materials, for the benefit of said corporation . . . .
Sec. 16. That in all cases where any person through whose land the road
may run, shall refuse to relinquish the same, or when a contract by the parties
cannot be made, it shall be lawful for the corporation to [initiate condemnation
proceedings].
....
Sec. 18. That if it shall be found necessary and advantageous to the
location and construction of said road, the corporation shall have the right to lay
the same along and upon any county or State road: Provided however, That
before such location is made, the corporation shall make application to the county
commissioners of the proper county, for such right; and said commissioners are
hereby vested with power to grant the same, by an order entered upon their
records: And provided also, That such right shall be granted on condition that the
corporation shall leave a sufficiency of said State or county road in as good repair,
for common use, as previous to such occupation.
Further, with respect to the PIRC’s acquisition of the railroad corridor, the legislative charter
provided (footnote added):
Sec. 19. That when said corporation shall have procured the right of way,
as herein before provided, they shall be seized, in fee simple, of the right to such
land, and they shall have the sole use and occupancy of the same, but not to
2
The facts in this section are derived from the exhibits attached to the parties’ summary
judgment briefs and are not in dispute.
-2-
interfere with the right of way of any Railroad company heretofore incorporated; 3
and no person, body politic or corporate, shall in any way interfere with, molest,
disturb or injure any of the rights or privileges hereby granted, or that would be
calculated to detract from or affect the profits of said corporation.
In accordance with its legislative charter, the PIRC acquired the portions of the railroad
corridor at issue in this case. It accomplished its acquisitions under section 15 of its charter
through instruments that will be referred to generally as “releases,” as well as pursuant to section
18 of its charter. It also acquired portions of the railroad corridor through deed, prescription, and
court order.
A railroad line was constructed, and a railroad operated, in the corridor acquired by the
PIRC. Eventually, in 1995, the line was purchased by three Indiana municipalities: the City of
Fishers, the City of Noblesville, and Hamilton County. In 2017, the municipalities advised the
Surface Transportation Board (“Board”) of their collective desire to invoke the Trails Act, 16
U.S.C. §§ 1241-1251, which, as amended, provides for the preservation of “established railroad
rights-of-way for future reactivation of rail service” by authorizing the interim use of such rights-
of-way as recreational and historical trails. Id. § 1247(d). The following year, they submitted
three separate requests to the Board, each relating to a different segment of the railroad line, for
the issuance of a Notice of Interim Trail Use or Abandonment (“NITU”). A NITU permits the
discontinuation of rail service, the salvaging of track and materials, and, if an agreement
regarding trail use is not reached, the abandonment of the line. 49 C.F.R. § 1152.29(d)(1). The
Board issued the three NITUs on December 21, 2018, and the municipalities executed trail-use
agreements in 2019.
After the Board issued the NITUs, a number of suits were filed in this court in which
owners of parcels adjacent to the railroad corridor alleged that through the operation of the Trails
Act and the issuance of the NITUs, defendant took their property without paying just
compensation in violation of the Fifth Amendment. In June 2020, the plaintiffs in Oldham,
Pressly, Bradley, and ATS Ford proposed a coordinated approach to resolving their claims.
Specifically, they sought to divide themselves into three groups: Group 1 plaintiffs had claims
with no outstanding liability issues and could proceed to damages, Group 2 plaintiffs had claims
that required the resolution of an essentially identical threshold title issue, and Group 3 plaintiffs
had claims with other threshold title issues. The court adopted their proposal.
While the parties were taking steps to determine the amount of just compensation due to
the Group 1 plaintiffs, they briefed cross-motions for summary judgment with respect to the
claims of the Group 2 plaintiffs. The central issue presented in those motions was whether the
3
In the mid-nineteenth century, the Indiana General Assembly and Indiana courts
regularly used plural pronouns and verbs in conjunction with collective nouns such as
“corporation” and “company.” Although not preferred in modern American English, this usage
is common in British English, and was common in American English in the years following the
American Revolution. See Bryan A. Garner, A Dictionary of Modern Legal Usage 170-71 (2d
ed. 1995) (defining “collective nouns”). The court does not disturb this usage when quoting the
PIRC’s legislative charter and Indiana case law.
-3-
releases by which the railroad company acquired particular portions of the railroad corridor
conveyed an easement or a fee simple estate. In four substantially identical decisions, the court
determined that precedent from the Indiana Supreme Court compelled the conclusion that the
releases conveyed fee simple estates. 4
The parties Pressly and ATS Ford now cross-move for summary judgment with respect to
the claims of the Group 3 plaintiffs. 5 They raise a number of threshold title issues common
among the group, primarily concerning whether particular instruments (or the absence thereof)
conveyed an easement to the railroad company. Indeed, plaintiffs’ briefs in the two cases are
substantially identical with respect to many of the issues, and defendant filed nearly identical
briefs (save for the caption) in both cases. 6 The motions are now fully briefed, and none of the
parties requested oral argument. Thus, the motions are ripe for adjudication.
II. STANDARD OF REVIEW
Both plaintiffs and defendant move for summary judgment pursuant to Rule 56 of the
Rules of the United States Court of Federal Claims (“RCFC”). Summary judgment is
appropriate when there is no genuine issue of material fact and the moving party is entitled to a
judgment as a matter of law. RCFC 56(a); Celotex Corp. v. Catrett, 477 U.S. 317, 322 (1986).
A fact is material if it “might affect the outcome of the suit under the governing law.” Anderson
v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986). An issue is genuine if it “may reasonably be
resolved in favor of either party.” Id. at 250.
The moving party bears the initial burden of demonstrating the absence of any genuine
issue of material fact. Celotex Corp., 477 U.S. at 323. The nonmoving party then bears the
burden of showing that there are genuine issues of material fact for trial. Id. at 324. Both parties
may carry their burden by “citing to particular parts of materials in the record, including
depositions, documents, electronically stored information, affidavits or declarations, stipulations
(including those made for purposes of the motion only), admissions, interrogatory answers, or
other materials” or by “showing that the materials cited do not establish the absence or presence
of a genuine dispute, or that an adverse party cannot produce admissible evidence to support the
fact.” RCFC 56(c)(1).
4
The court issued these decisions on March 23, 2021, and reissued corrected decisions
on December 3, 2021, nunc pro tunc to March 23, 2021. See generally Bradley v. United States,
156 Fed. Cl. 640 (2021); ATS Ford Drive Inv., LLC v. United States, 156 Fed. Cl. 397 (2021);
Oldham v. United States, 156 Fed. Cl. 159 (2021); Pressly v. United States, 156 Fed. Cl. 138
(2021).
5
Proceedings for the Group 3 plaintiffs in Bradley and Oldham are stayed pending the
outcome of these motions, as are the proceedings in Episcopal Diocese of Indianapolis.
6
Because the briefs are so similar, court is filing a substantively identical decision in
each case. Only the captions are different.
-4-
The court must view the inferences to be drawn from the underlying facts in the light
most favorable to the nonmoving party. Matsushita Elec. Ind. Co. v. Zenith Radio Corp., 475
U.S. 574, 587 (1986). Entry of summary judgment is mandated against a party who fails to
establish “an element essential to that party’s case, and on which that party will bear the burden
of proof at trial.” Celotex Corp., 477 U.S. at 322. However, if neither party satisfies this burden
on the filing of cross-motions for summary judgment, then the court must deny both motions.
See First Com. Corp. v. United States, 335 F.3d 1373, 1379 (Fed. Cir. 2003) (“When both parties
move for summary judgment, the court must evaluate each motion on its own merits, resolving
reasonable inferences against the party whose motion is under consideration.”); Bubble Room,
Inc. v. United States, 159 F.3d 553, 561 (Fed. Cir. 1998) (“The fact that both the parties have
moved for summary judgment does not mean that the court must grant summary judgment to one
party or the other.”).
III. DISCUSSION
The overarching issue raised by the parties in their motions is whether the Group 3
plaintiffs have a property interest in the railroad corridor such that the Board’s issuance of the
NITUs constituted a taking of that property interest.
A. Legal Standard
The Fifth Amendment prohibits the federal government from taking private property for
public use without paying just compensation. U.S. Const. amend. V. To establish a taking, a
plaintiff must first “identif[y] a cognizable Fifth Amendment property interest that is asserted to
be the subject of the taking.” Casitas Mun. Water Dist. v. United States, 708 F.3d 1340, 1348
(Fed. Cir. 2013); accord Klamath Irrigation Dist. v. United States, 635 F.3d 505, 520 n.12 (Fed.
Cir. 2011) (“It is plaintiffs’ burden to establish cognizable property interests for purposes of their
takings . . . claims.”). To demonstrate a cognizable property interest in a Trails Act case, a
plaintiff must establish ownership in land adjacent to the railroad line described in the NITU and
that ownership in that land can be traced to the railroad company’s acquisition. Brooks v. United
States, 138 Fed. Cl. 371, 377 (2018). A plaintiff must also establish that the railroad company
acquired an easement for railroad purposes that continued to exist at the time of the alleged
taking. Ellamae Phillips Co. v. United States, 564 F.3d 1367, 1373 (Fed. Cir. 2009); Preseault v.
United States (“Preseault II”), 100 F.3d 1525, 1533 (Fed. Cir. 1996) (en banc). In general, state
law governs the determination of the property interest acquired by the railroad company. See
Preseault v. United States, 494 U.S. 1, 8 (1990); Preseault II, 100 F.3d at 1534. Moreover, the
acquisition of property rights is governed by the law in effect at the time the rights were
acquired. See Hash v. United States, 403 F.3d 1308, 1315 (Fed. Cir. 2005); Preseault II, 100
F.3d at 1534.
B. Interest Acquired by the Railroad Company Over a Public Road
One subset of the Group 3 plaintiffs owns parcels adjacent to a portion of the railroad
corridor situated along a public road. The parties have identified four documents purportedly
related to the railroad company’s acquisition of some or all of this portion of the corridor: (1) a
release executed by J.G. Burns and seventeen others in the PIRC’s favor on August 11, 1848
-5-
(“Burns release”); (2) a resolution adopted by the board of commissioners of Hamilton County
on September 7, 1848 (“county resolution”); (3) an order issued by the United States Circuit
Court for the District of Indiana on May 17, 1897 (“court decree”); and (4) an ordinance adopted
by the City of Noblesville in 1915 (“city ordinance”). 7
The Burns release is not in the record before the court. Although it is likely that this
instrument is similar, or identical, to the releases addressed in the court’s decisions on the Group
2 summary judgment motions, the court declines to reach such a conclusion in the absence of the
document. However, the evidence in the record reflects that if the Burns release only conveyed
an easement to the PIRC, the PIRC subsequently obtained a fee simple interest in the corridor
one month later via the county resolution.
The county resolution was adopted in response to a petition by the PIRC to lay its
railroad along a public road:
Your Petitioner to wit the President and directors of the Peru and
Indianapolis Rail Road Company would represent and show unto your honorable
board, that after a careful survey of a rout[e] for said Rail Road from the mouth of
Stoney Creek in said county to the Town of Noblesville & thence along Polk
Street in said Town, your petitioners have found it to be necessary and
advantageous to the location and construction of said Road, to lay and locate the
same along and upon the State Road leading from the Town of Noblesville to
Indianapolis, as to so much of said Road as lies between said Town of
Noblesville, and the place where said Road crosses said Creek; your Petitioner
therefore prays your honorable board to grant the same by an order to be entered
upon the records of this honorable board; on condition however that the said
Corporation who are known by the same and style of the “President and directors
of the Peru and Indianapolis Rail Road Company” – shall leave a sufficiency of
said State Road in as good repair for common use, as previous to such occupation,
agreeably to the provisions of the charter of Incorporation of said Peru &
Indianapolis Rail Road . . . .
Pressly Pls.’ Ex. G-1. 8 The county commissioners granted the petition:
7
For the following claims, the county resolution is the sole relevant conveyance: Pressly
16, 103, 147a, 147b, 211, 247a, 247b, 268a, 268b, 268c, and 268d; and ATS Ford 10, 11, and 12.
In addition, for the following claims, the county resolution, the court decree, and the Burns
release are the relevant conveyances: ATS Ford 2, 3, 4, 5, 6, 7, and 8. Finally, the county
resolution, the court decree, and the city ordinance are the relevant conveyances for the
following claims: Pressly 204a, 204b, 204c, and 204d.
8
When, as here, an exhibit is submitted by more than one party in support of its motion
for summary judgment, either in the same or a separate case, the court cites to only one
submission.
-6-
Whereupon the matters and things in said Petition contained being duly
considered & the board being fully advised in the premises [–] do order & decree
that said corporation shall have the right & authority to locate said Rail Road &
lay the same along and upon said State Road agreeably to the prayer of said
petition – but this right so to locate and occupy said State Road as aforesaid is
granted on this express condition that the said corporation shall leave a
sufficiency of said State Road in as good repair, for common use, as previous to
such occupation.
Id. The language of the petition and county resolution mirrors the requirements of section 18 of
the PIRC’s legislative charter. As required in section 18, (1) the PIRC found it “necessary and
advantageous to the location and construction” of its railroad “to lay and locate the same along
and upon” the identified “State Road”; (2) the PIRC applied to the proper county’s
commissioners; (3) the proper county’s commissioners granted the application and entered an
order in the county’s records; and (4) both the PIRC and the county commissioners indicated that
the PIRC’s application was granted “on condition” that the PIRC “shall leave a sufficiency of”
the identified state road “in as good repair, for common use, as previous to such occupation.”
Furthermore, the PIRC’s petition expressly referred to its legislative charter. Accordingly, there
can be no dispute that the PIRC acquired the relevant portions of the railroad corridor pursuant to
section 18 of its legislative charter.
As defendant observes, sections 15, 16, and 18 of the PIRC’s legislative charter describe
ways in which the PIRC could acquire its railroad corridor––through relinquishment,
condemnation, and application to the county commissioners. 9 Section 19 then provides that
when the PIRC “procured the right of way, as herein before provided,” it “shall be seized, in fee
simple, of the right to such land . . . .” The Indiana Supreme Court concluded that section 19
was
simply intended as declaratory of the effect which the releases and condemnations
of land spoken of in the 15th and 16th sections should have; that is, whether they
should be taken to convey an easement, a right of way merely, or a fee-simple
title, and declaring it should be the latter . . . .
Newcastle & Richmond R.R. Co. v. Peru & Indianapolis R.R. Co., 3 Ind. 464, 468 (1852);
accord Indianapolis, Peru & Chi. Ry. Co. v. Rayl, 69 Ind. 424, 429 (1880) (“That relinquishment
. . . , supplemented by section 19 . . . of the act of incorporation, enacting that the right of way,
when acquired, should be held by the company in fee-simple, purported to convey to the
company an estate in fee-simple to so much of the land described in it as constituted the right of
way through the land under such relinquishment.”); Douglass v. Thomas, 2 N.E. 562, 564 (Ind.
1885) (remarking that the PIRC’s legislative charter “expressly provided that the right of way,
when acquired, should be held in fee-simple by the corporation”). In other words, it concluded
that the PIRC obtained fee simple title through the execution of releases and through
condemnation. There is nothing in that court’s reasoning, and the parties have not offered any
9
Section 17 of the legislative charter concerns the provision of notice of condemnation
proceedings to property owners who are minors, incompetent, or reside in a different county.
-7-
other case law, suggesting that section 19 does not also apply to conveyances from county
commissioners under section 18. Indeed, the plain language of section 19 indicates that it
applies to all prior sections in the legislative charter describing the means by which the PIRC
could obtain land for its railroad. Therefore, the PIRC acquired a fee simple estate in the land it
acquired via the county resolution.
Almost fifty years after the county commissioners conveyed the land along its public
road to the PIRC, one of the PIRC’s successors, the Lake Erie and Western Railroad Company,
brought suit against the City of Noblesville and a contractor, Michael Holloran, related to this
portion of the railroad corridor. Pressly Pls.’ Ex. G-4. On May 17, 1897, the United States
Circuit Court for the District of Indiana issued an order approving and confirming the parties’
settlement agreement. Id. The agreement specified that the City of Noblesville had the right to
make planned improvements to a certain portion of the public road at issue, and that the railroad
company would lower its tracks to conform to the grade of the road improvement, plank on the
outside of the rails, and place ballast between the rails. The parties further agreed that
the said Lake Erie and Western Railroad Company shall have the right to forever
occupy its railroad track, depot and station grounds as now located in the City of
Noblesville without interruption on behalf of the said City of Noblesville and
without interference on the part of the said contractor Michael Holloran as the
said property is now occupied . . . .
Id. Plaintiffs contend that this court decree establishes that the railroad company held only an
easement over the public road. They are mistaken. As the court previously concluded,
controlling Indiana Supreme Court precedent reflects that the PIRC obtained a fee simple estate
in the land underlying the railroad corridor. There is no indication in the court decree that the
railroad company intended to convey any property interest to the City of Noblesville, much less a
fee simple estate with a retained easement. Rather, the court decree appears to be concerned
solely with a dispute over the effects of the City of Noblesville’s planned road improvements on
the railroad tracks.
The final document at issue––the city ordinance––affects four contiguous parcels owned
by one of the plaintiffs in Pressly. These parcels are adjacent to one side of the public road, and
the portion of the railroad corridor conveyed via the county resolution is adjacent to the other
side of the public road. Although the city ordinance is not included in the record before the
court, other evidence in the record indicates that through the city ordinance, the City of
Noblesville conveyed a separate corridor to the railroad company over the portion of the four
parcels adjacent to the public road. See Pressly Pls.’ Exs. B-6, C-2 at 29, G-5. 10 The Pressly
plaintiffs acknowledge this conveyance in their summary judgment motion, but make no
contentions regarding the property interest conveyed to the railroad company or whether the
conveyed corridor was subject to the NITUs. In short, the Pressly plaintiffs do not allege that
this conveyance affects their claims. Accordingly, the city ordinance is irrelevant for the
purposes of determining their property interest.
10
For all citations, the court uses the page numbers assigned by its electronic case filing
system.
-8-
In sum, there are no genuine issues of material fact regarding the claims of the Group 3
plaintiffs who own parcels adjacent to the public road. The PIRC obtained the land for this
portion of the railroad corridor from the county in fee simple pursuant to sections 18 and 19 of its
legislative charter. Consequently, defendant is entitled to summary judgment with respect to
these claims.
C. Interest Acquired by the Railroad Company Through a Court Decision
Another subset of the Group 3 plaintiffs owns parcels adjacent to a portion of the railroad
corridor acquired by the Lake Erie and Western Railroad Company through a decision of the
Marion County Circuit Court on June 29, 1907, arising from the railroad company’s suit against
Noah G. Manship and others. 11 The Circuit Court’s decision includes findings of fact,
conclusions of law, and a judgment. Pressly Pls.’ Ex. E-1. Plaintiffs contend that the Circuit
Court’s findings of fact indicate that the railroad company acquired a fee simple in a right-of-
way easement through adverse possession, rather than a fee simple estate. Of greatest relevance
to plaintiffs’ position are the following findings:
4. [After incorporation in 1846], and prior to the year 1852, said Peru and
Indianapolis Railroad Company located and constructed said line of railroad from
Peru to Indianapolis, and as so located and constructed the same passed through
the northeast quarter of section one, in township seventeen north, range four east,
in Hamilton County, Indiana, running in a straight line south 27 degrees west
through said entire quarter section.
5. At the time said railroad was so located and constructed, said quarter
section of land was a forest and wholly unimproved, and said railroad company
entered upon and cut and removed the timber from a strip of ground forty feet in
width on each side of the center line of the railroad track so located entirely across
said quarter section, and constructed and maintained a single track railroad in the
center of said strip, and the same has ever since been maintained and operated on
the same line.
....
8. On the 2nd day of June 1880, one J.C. Kimberlin was the owner in fee
of all the said north east quarter of said section one except such portions thereof
and such rights and interests therein as were held by the said Indianapolis, Peru
and Chicago Railroad Company for its railroad and right of way aforesaid . . . .
....
11
The relevant claims are Pressly 1a, 1b, 56, 83, 93, 109a, 109b, 110, 124, 130, 151,
153, 215, 216, 249, 270a, 270b, 270c, 270d, 270e, 278, and 290, and ATS Ford 21.
-9-
27. That the plaintiff and its predecessor railroad companies ever since
the location and construction of said line of railroad as aforesaid by said Peru
& Indianapolis Railroad Company have continuously and successively and for
more than forty years operated said line of railroad and here had the continuous
and uninterrupted use of all the ground on each side thereof through said entire
quarter section for right of way between the fences along the boundaries thereof
located as in this finding set forth, and have been in the open use and occupancy
of the same for railroad purposes to the full width of 39 to 40 feet on each side of
the centerline of said main track for more than twenty years prior to the
commencement of this suit under claim of right . . . .
Id. at 4-5, 18.
Defendant counters that the controlling language, conveying a fee simple estate, is found
in paragraph 2 of the Circuit Court’s conclusions of law––“That the plaintiff is the owner in fee
simple of, and entitled to a judgement as against the defendant Noah G. Manship, quieting its
title to its right of way,” id. at 20––and in the Circuit Court’s judgment––
It is therefore considered, adjudged and decreed by the Court that the
plaintiff is the owner in fee simple, and its title be and the same is hereby quieted
as against the defendant, Noah G. Manship, or any person claiming through, from
or under him, to the following described real estate . . . , to wit,––
Its right of way . . . .
Id. at 23. Specifically, defendant argues that the Circuit Court’s fact findings cannot be
construed to mean that the PIRC did not acquire this portion of the railroad corridor through a
written instrument or that its successors acquired it through adverse possession, observing that
the Circuit Court made no findings with respect to the existence of a written instrument and did
not expressly find that the railroad company acquired its interest through adverse possession.
These arguments are unpersuasive.
First, had the railroad company acquired its interest in the corridor through a written
instrument, it undoubtedly would have produced it to the Circuit Court as evidence of its interest,
and the Circuit Court assuredly would have mentioned it in its findings of fact. Thus, it is
reasonable to conclude that a written instrument did not exist.
Second, that the Circuit Court did not use the term “adverse possession” in its fact
findings or legal conclusions is of no moment; findings that a railroad company satisfied the
elements of adverse possession are sufficient. See Meyer v. Pittsburgh, Cincinnati, Chi. & St.
Louis Ry. Co., 113 N.E. 443, 444 (Ind. App. 1916) (indicating the parties’ agreement that a
finding of fact addressing the elements of adverse possession “disclose[d] an adverse occupancy
of the parcel of land described in the decree”). At the time that the Circuit Court issued its
decision, “[a]n entry upon land with the intention of asserting ownership, and continuing in the
open and exclusive possession thereof, exercising the usual acts of ownership under such claim,
without asking permission and in disregard of all other claims, [was] sufficient to make the
-10-
possession adverse,” and “[s]uch possession continued uninterruptedly for 20 years or more
[established] title to the extent that the possession [was] actual and exclusive.” 12 May v.
Dobbins, 77 N.E. 353, 354-55 (Ind. 1906); accord Rennert v. Shirk, 72 N.E. 546, 547 (Ind. 1904)
(“To be adverse, possession must be actual, open, and notorious, exclusive, continuous, and
under a claim of right; that is, an intention to claim adversely.”). As noted above, the Circuit
Court, in paragraph 27 of its findings of fact, found
[t]hat the plaintiff and its predecessor railroad companies ever since the location
and construction of said line of railroad . . . have continuously and successively
and for more than forty years operated said line of railroad and here had the
continuous and uninterrupted use of all the ground on each side thereof . . . , and
have been in the open use and occupancy of the same for railroad purposes to the
full width of 39 to 40 feet on each side of the centerline of said main track for
more than twenty years prior to the commencement of this suit under claim of
right . . . .
Pressly Pls.’ Ex. E-1 at 15 (emphasis added). These findings are sufficient to establish that the
railroad company adversely possessed the corridor.
Plaintiffs, relying primarily on Meyer, argue that the Circuit Court’s finding of adverse
possession establishes that the railroad company acquired a prescriptive easement and not a fee
simple estate. In Meyer, the trial court found that the railroad company adversely possessed a
parcel upon which it located and constructed its track and operated its railroad, and concluded
that the railroad company owned the parcel in fee simple. 113 N.E. at 443-44. This latter
12
More recently, the Indiana Supreme Court described the four elements of adverse
possession as:
(1) Control—The claimant must exercise a degree of use and control over the
parcel that is normal and customary considering the characteristics of the land
(reflecting the former elements of “actual,” and in some ways “exclusive,”
possession);
(2) Intent—The claimant must demonstrate intent to claim full ownership of the
tract superior to the rights of all others, particularly the legal owner (reflecting the
former elements of “claim of right,” “exclusive,” “hostile,” and “adverse”);
(3) Notice—The claimant’s actions with respect to the land must be sufficient to
give actual or constructive notice to the legal owner of the claimant’s intent and
exclusive control (reflecting the former “visible,” “open,” “notorious,” and in
some ways the “hostile,” elements); and,
(4) Duration—the claimant must satisfy each of these elements continuously for
the required period of time (reflecting the former “continuous” element).
Fraley v. Minger, 829 N.E.2d 476, 486 (Ind. 2005).
-11-
conclusion was challenged on appeal. Id. at 443. In support of its position that the trial court’s
judgment should be affirmed, the railroad company relied on section 19 of its predecessor’s
legislative charter, which, as in the PIRC’s legislative charter, provided “[t]hat when [the railroad
company] shall have procured the right of way as herein provided, they shall be seised in fee
simple of the right to use such land, and shall have the sole use and occupancy of the same . . . .”
Id. at 444-45.
After reviewing the relevant case law, the Appellate Court of Indiana stated that section
19 of the legislative charter did “not destroy or prohibit the exercise of the common-law power to
contract,” id. at 446 (citing Cleveland, Columbus, Cincinnati & Indianapolis Ry. Co. v. Coburn,
91 Ind. 557 (1883) (per curiam)), and that the parties to such a contract could agree to “create a
less estate than a fee, or a right less in extent than that which the law authorizes the grantee to
acquire,” id. (quoting Cincinnati, Indianapolis, St. Louis, & Chi. Ry. Co. v. Geisel, 21 N.E. 470,
470 (Ind. 1889)). Therefore, the court stated, “while prescription creates the presumption of a
grant, a grant of the corpus of the land in fee simple is not necessarily presumed where the holder
by grant may legally acquire an estate less in quantity or different in quality.” Id. at 446; see also
id. (noting that “a fee may exist in an easement”). Thus, the question is “whether from the
established prescriptive right a grant of the lands in fee must be presumed, or merely a grant of
an estate or interest sufficiently comprehensive to protect the use as it has been exercised.” Id. at
447. The court “conclude[d] that [the railroad company’s] estate in the lands described in the
decree, under the facts found, is an easement to use and occupy such lands for the purpose of
maintaining and operating its railroad on and over the same, rather than an estate in fee simple in
the land.” Id.
There is no material difference between the facts in Meyer and the circumstances
described in the Circuit Court’s decision in the Manship case. In both cases, the trial court made
findings of fact supporting a conclusion of adverse possession and concluded, as a matter of law,
that the railroad company obtained fee simple title as a result of such adverse possession.
Because the appellate court in Meyer reversed the trial court’s decision and found that the
railroad company obtained only an easement, it stands to reason that the railroad company in the
Manship case also obtained an easement.
Having determined that the railroad company held an easement over this portion of the
railroad corridor, the final issue to be addressed is whether the adjoining landowners own the fee
simple estate underlying the easement. In Indiana, it was an “established principal of common
law,” since codified, that “where there is no language in any of the relevant deeds describing real
property that includes the right-of-way, the title of the owners of land abutting railroad rights-of-
way runs to the center of the right-of-way.” Calumet Nat’l Bank as Tr. Under Tr. No. P-3362,
Dated Sept. 1, 1986 v. Am. Tel. & Tel. Co., 682 N.E.2d 785, 790 (Ind. 1997); accord Swaim v.
City of Indianapolis, 171 N.E. 871, 876 & n.1 (Ind. 1930); Cox v. Louisville, New Albany, &
Chi. R.R. Co., 48 Ind. 178, 188 (1874); see also Ind. Code § 32-23-11-10 (2021) (codifying the
common law). Plaintiffs in Pressly and ATS Ford have produced the deeds by which they
acquired parcels adjacent to these portions of the railroad corridor. See generally Pressly Pls.’
Ex. F-6; ATS Ford Pls.’ Ex. E-3. The descriptions of the parcels in these deeds do not include
the railroad corridor, but instead provide either (1) an indication that one of the parcel’s
boundaries runs along the corridor or (2) a reference to a specified lot on a recorded plat. See
-12-
Pressly Pls.’ Ex. F-6 at 9, 34, 49, 73, 78, 82, 86, 111, 116, 145, 150, 170, 365, 374; ATS Ford
Pls.’ Ex. E-3 at 19. Accordingly, it would appear that all of these plaintiffs own a fee simple
estate to the centerline of the railroad corridor.
However, the court cannot reach this conclusion with respect to the claim of two of the
plaintiffs in this subset of the Group 3 plaintiffs. By way of background, the railroad corridor is
adjacent to five parcels that are part of The Enclave of Fishers Pointe Horizontal Property
Regime (“Regime”). Pressly Pls.’ Ex. F-6 at 188-92. There is one multiunit condominium
building on each parcel. Id. According to the Regime’s “Declaration of Horizontal Property
Ownership,” id. at 193, each condominium unit owner owns an undivided interest as a tenant in
common in the common areas, which includes the real estate, yards, and parks situated between
the buildings and the railroad corridor, id. at 201-02; see also ATS Ford Pls.’ Ex. E-3 at 14
(depicting the location of the relevant building, the building’s units, and the railroad corridor).
This document further provides that The Enclave of Fishers Pointe Co-Owners Association Inc.
(“Association”), which consists of the owners of all of the condominium units, is responsible for
the “maintenance, repair, upkeep, replacement, administration and operation of the Property,”
Pressly Pls.’ Ex. F-6 at 203-04, and “the maintenance, repair, decoration, restoration, and
replacement of the Common Areas,” id. at 206. Additionally, the Association is required to elect
a board of managers, id. at 204, which is responsible for “representing all the Owners in
providing for the management, administration, operation, maintenance, repair, replacement and
upkeep of the Property exclusive of Condominium Units,” id. at 205. In fact, “[i]n the event of
condemnation of all or any part of the Common Areas . . . , the Board of Managers is . . .
authorized to negotiate with the condemning authority and/or contest an award made for the
appropriation of such Common Areas.” Id. at 219. Moreover, pursuant to the Regime’s “Code
of By-Laws,” which enumerates in greater detail the duties and powers of the board of managers,
id. at 238-41, the board of managers is empowered “to employ legal counsel . . . in connection
with the business and affairs” of the Regime, id. at 241. Finally, the Regime’s declaration and
bylaws both provide that all owners and future owners of the condominium units are “subject to”
their provisions. Id. at 225-26, 232; accord id. at 225 (“The acceptance of a deed of conveyance
. . . shall constitute an agreement that the provisions of this Declaration [and] the By-Laws . . .
are accepted and ratified by each such Owner . . . , and all such provisions shall be covenants
running with the land and shall bind any person having at any time any interest or estate in a
Condominium Unit or the Property as though such provisions were recited and stipulated at
length in each and every deed . . . .”); Ind. Code § 32-25-9-1(a) (“Each condominium unit owner
shall comply with . . . (1) the articles of incorporation or association; (2) the bylaws; . . . and
(4) the covenants, conditions, and restrictions set forth in . . . the declaration[.]”).
The Association asserts claims related to all five parcels adjacent to the railroad corridor
that are part of the Regime (parcel numbers 15-14-01-00-04-999.999, 15-14-01-02-20-999.999,
15-14-01-02-19-999.999, 15-14-01-02-18-999.999, and 15-14-01-02-17-999.999). Pressly
Fourth Am. Compl. ¶ 200. Elizabeth Reid and Margaret F. Reid jointly own a condominium unit
in a building situated on one of the five parcels, ATS Ford Pls.’ Ex. E-3 at 19, and assert a claim
related to the parcel specifically associated with their unit (parcel number 15-14-01-00-04-
005.000), ATS Ford Third Am. Compl. ¶ 29. Because the parties, in their initial summary
judgment briefing, did not address whether both the Association and the Reids can recover just
-13-
compensation for the taking of the common area adjacent to the railroad corridor, the court
requested supplemental briefing on this issue.
In their supplemental briefs, plaintiffs assert that both the Association and the Reids
could recover just compensation, but rather than supply a legal basis for that conclusion,
presented the following stipulation:
In Pressly, the Association will seek just compensation for the same land as the
Reids in ATS Ford, but the Association will limit their monetary demand by not
including the percentage of the Reids’ undivided interest in the common area in
their damage calculation. In ATS Ford, the Reids will seek just compensation for
the same land as the Association in Pressly, but the Reids will limit their demand
to their percentage interest in the common area in their damage calculation.
Pressly Pls.’ Suppl. Br. 2; ATS Ford Pls.’ Suppl. Br. 2. Defendant, in its initial supplemental
brief, argues that because individual condominium unit owners are bound by the Regime’s
declaration and bylaws, and because those documents provide that the Association acts on behalf
of the owners of the condominium units with respect to the common areas, the Reids cannot
individually pursue a claim that the government took a portion of a common area without paying
just compensation. Defendant did not address plaintiffs’ stipulation in its supplemental response
brief.
Nevertheless, the court agrees with defendant that only the Association can pursue a
claim for just compensation with respect to the common areas owned jointly by the
condominium unit owners as tenants in common. According to the Regime’s declaration and
bylaws, to which the Reids and the other condominium unit owners are legally bound, the
Association, through the board of managers, represents the owners in managing and
administering the common areas. Such representation includes maintaining the common areas,
handling matters related to condemnation proceedings, 13 and retaining legal counsel. Given the
broad authority granted to the Association to act on behalf of the condominium unit owners with
respect to the common areas, there is no basis to conclude that the owners retained the ability to
seek just compensation for the taking of a common area. Thus, although plaintiffs’ proposed
approach would ultimately lead the parties to the correct result, it is legally untenable.
Accordingly, there being no genuine issues of material fact, the court grants summary judgment
to defendant with respect to the Reids’ claim.
There are also no genuine issues of material fact concerning the claims of the Association
and the other plaintiffs who own parcels affected by the Manship case. However, unlike the
Reids, these plaintiffs are entitled to summary judgment on the threshold issue of whether they
own fee simple title to the centerline of the portion of the railroad corridor adjacent to their
parcels.
13
Although the Regime’s declaration appears to concern the government’s exercise of
eminent domain, or direct condemnation, there is no reason to suspect that the Association would
be responsible for handling direct condemnation negotiations and lawsuits, but not for handling
inverse condemnation suits like this one.
-14-
D. Interest Acquired by the Railroad Company Through Purportedly Lost Conveyance
Instruments
A third subset of the Group 3 plaintiffs owns parcels adjacent to portions of the railroad
corridor acquired by the railroad company through conveyance instruments that were either
characterized as lost, or for which recording information was not provided, on the valuation
schedules and maps prepared for the Interstate Commerce Commission (“ICC”) in 1918. Three
of these instruments relate to one portion of the railroad corridor: (1) an instrument, type
unknown, executed by Carlisle Vanlaningham in 1849 (“Vanlaningham instrument”); (2) an
agreement executed by L.D. Moody and his wife in 1897 (“Moody agreement”); and (3) an
agreement executed by Lyman W. Curtis, a tenant, in 1897 (“Curtis agreement”). 14 A fourth
relates to a separate portion of the railroad corridor: an instrument, type unknown, executed by
Elizabeth Seerley on April 21, 1849 (“Seerley instrument”). 15 Plaintiffs contend that because the
ICC valuation schedules and maps lack recording information for these instruments or indicate
that these instruments were lost, and because the trail operators and the railroad company did not
produce these instruments in response to their subpoenas, they established that the instruments
were lost and the burden to prove otherwise shifted to defendant. Plaintiffs further contend that
because these instruments have not been produced, the railroad company has only a railroad
purposes easement over this portion of its corridor. Defendant, in contrast, asserts that because
the ICC valuation schedules and maps identify specific conveyance instruments, plaintiffs have
the burden to produce either those instruments or other evidence regarding the interest acquired
by the railroad company. Defendant argues that plaintiffs’ failure to marshal such evidence
results in their inability to satisfy their burden of establishing a cognizable property interest.
1. ICC Valuation Schedules and Maps
To properly address the parties’ arguments, an examination of the purpose and contents
of the ICC valuation documents is necessary. On March 1, 1913, Congress enacted a statute,
commonly referred to as the Valuation Act, requiring the ICC to “investigate, ascertain, and
report the value of all the property owned or used by every common carrier subject to” the Act’s
provisions, including “the original cost of all lands, rights of way, and terminals owned or used
for the purposes of a common carrier,” as well as “the amount and value of any . . . grant of right
of way” and “the grants of land to any such common carrier.” Act of March 1, 1913, ch. 92, 37
Stat. 701, 701-02. To implement the requirements of the Act, the ICC issued a series of orders in
which it directed railroad companies to provide the necessary information on prescribed forms
(valuation schedules) and standardized maps (valuation maps). See, e.g., Interstate Com.
Comm’n, Specifications for Maps and Profiles (Jan. 12, 1914) (commonly referred to as the
“Map Order,” and subsequently revised by Valuation Order Number 5, dated November 21,
14
The relevant claims are Pressly 41, 64a, 64b, 78, 95, 150a, 150b, 162, 284, 292a, 292b,
and 298, and ATS Ford 32.
15
The Seerley instrument affects two claims: Pressly 137 and 217. Another
instrument—executed by Powell Howland on April 25, 1849—affects a portion of Pressly 137;
defendant does not seek summary judgment with respect to this portion of that claim.
-15-
1914; Valuation Order Number 6, dated November 21, 1914; and Valuation Order Number 23,
dated March 9, 1920); Interstate Com. Comm’n, Orders, Instructions and Forms Pertaining to
Schedules of Land (Nov. 21, 1914) (commonly referred to as Valuation Order Number 7 and
modified with supplemental instructions dated November 1, 1916). 16 As set forth in these
orders—in particular the instructions for preparing valuation schedules described in Valuation
Order Number 7—railroad company custodians maintained numbered files containing “each
instrument conveying title to or interest in each parcel of land . . . .” Valuation Order Number 7
at 5. The supplemental instructions for preparing valuation schedules provided that (1) “[i]n the
absence of deeds to lands owned,” the railroad company should refer to “county, parish, or other
properly authenticated records” to provide the required information; (2) for any parcels held by
the railroad company through adverse possession, an “adverse possession” notation should be
included in the “Remarks” column of the valuation schedule; and (3) for any parcels used but not
owned by the railroad company, a “not owned” notation should be included in the “Remarks”
column of the valuation schedule. Supplemental Instructions ¶¶ 2-4.
For the Vanlaningham instrument, the valuation schedule indicates that the recording
information was “Not Known”; that the grantee was the PIRC; that the land area was 3.008
acres; that for consideration, the railroad company was to build and maintain an undercrossing;
and that the deed “has been lost but mention is made of it in” a complaint included in “Gen. Atty.
file 3025.” Pressly Def.’s Ex. 6 at 6. For the Moody agreement, the valuation schedule does not
identify any recording information or consideration, but indicates that the grantee was one of the
PIRC’s successors and that the agreement was “[t]o settle suit for damages because of filling
cattle pass by [railroad] company,” as reflected in “Genl. Atty. file 3025.” Id. The information
on the valuation schedule for the Curtis agreement is substantially identical to what is provided
for the Moody agreement, except for the notation that Mr. Curtis held a leasehold on the affected
parcel, as reflected in “Genl. Atty. file 3441.” Id. For the Seerley instrument, the valuation
schedule indicates that no instrument was “found,” that the grantee was the PIRC; that the land
area was 9.312 acres, that the consideration paid was $20, and that the instrument was referred to
in “correspondence file No. 20217.” Pressly Pls.’ Ex. C-1 at 32. The information included on
the relevant valuation maps for all four instruments does not materially contradict the
information included on the valuation schedules. See Pressly Pls.’ Exs. B-1, B-2.
2. Allocation of the Burdens of Proof
As noted above, plaintiffs bear the burden of establishing a cognizable property interest
that was taken by the government. Klamath Irrigation Dist., 635 F.3d at 520 n.12. And, to
satisfy that burden, plaintiffs must prove that the railroad company acquired an easement for
railroad purposes. Preseault II, 100 F.3d at 1533. Plaintiffs assert in their initial summary
judgment briefs that they satisfied their burden because the valuation schedules, valuation maps,
and responses to their subpoenas demonstrate that the relevant conveyance instruments have
been lost, resulting in prescriptive easements under Indiana law. Then, in their supplemental
briefs, responding to questions posed by the court regarding Indiana’s standard for declaring
deeds lost, plaintiffs assert that defendant, as the party seeking to demonstrate that the
16
These orders, as amended, were subsequently codified in parts 151 and 152 of title 49
of the 1938––and first––edition of the Code of Federal Regulations.
-16-
purportedly lost instruments conveyed fee simple estates to the railroad company, bears the
burden of establishing that those instruments were lost and did, in fact, convey a fee simple
interest. Defendant, in contrast, contends that plaintiffs bear the burden of demonstrating both
that the instruments have been lost and the property interest conveyed by the instruments. The
unique posture of the parties in Trails Act cases leads to the conclusion that neither party has
properly allocated the burdens of proof with respect to lost conveyance instruments.
In Indiana, when a party wants to establish ownership of property through an instrument
that has been lost,
the party is required to give some evidence that such a paper once existed—
though slight evidence is sufficient for this purpose—and that a bona fide and
diligent search has been unsuccessfully made for it, in the place where it was most
likely to be found, if the nature of the case admits of such proof; after which, his
own affidavit is admissible to the fact of its loss.
Thompson v. Thompson, 9 Ind. 323, 333 (1857) (per curiam) (quoting 1 Simon Greenleaf, A
Treatise on the Law of Evidence § 558). Only after establishing that the instrument is lost may
the party introduce secondary evidence of the instrument’s contents. Meek v. Spencer, 8 Ind.
118, 119 (1856) (per curiam). This standard presumes that the party averring that a conveyance
instrument has been lost is doing so to establish that an interest had in fact been conveyed, see,
e.g., Thompson, 9 Ind. at 325; Armstrong v. Azimow, 76 N.E.2d 692, 693 (Ind. App. 1948) (en
banc), or to establish the type of interest that was conveyed, see, e.g., Speer v. Speer, 7 Ind. 178,
178-79 (1855). See generally Howe v. Fleming, 24 N.E. 238, 238 (Ind. 1890) (“To entitle a
party to give parol evidence of the contents of a paper alleged to be lost, it is incumbent upon
him to show that a diligent and careful search was made at the proper places, and by the proper
persons, and that it could not be found.”).
In a Trails Act case, however, the party averring that a deed has been lost––a present-day
landowner––is typically doing so not to establish that the grantee––a long-since-defunct railroad
company––acquired a particular property interest through that deed, but instead to establish that
the grantee acquired through prescription only what it used. To prove, as plaintiffs allege here,
that the railroad company acquired an easement through prescription, a landowner must
demonstrate that all of the elements of prescription have been satisfied. And if, as here, a
landowner’s invocation of prescription is predicated upon the loss of the conveyance instrument,
the landowner necessarily must establish that the conveyance instrument has been lost. 17 Upon
doing so, the landowner need not marshal proof of the instrument’s contents because such proof
is not necessary to establish prescription. Consequently, the burden to demonstrate the
17
The court recognizes that, “in general, the loss of [a paper] must be proved by the
person in whose hands it was at the time of the loss, or to whose custody it is traced, if that
person be living.” Murray v. Buchanan, 7 Blackf. 549, 550-51 (Ind. 1845) (per curiam).
However, this case, in which a present-day landowner is attempting to establish the property
interest acquired by a railroad company in the nineteenth century, presents a scenario that cannot,
as a factual matter, be subject to this general rule.
-17-
instrument’s contents and, in particular, that the instrument did not convey an easement to the
railroad company, falls on defendant. 18
Having determined how the burdens of proof should be allocated, the first question to be
answered is whether plaintiffs have established that the four purportedly missing instruments are,
in fact, lost.
3. Are the Instruments Lost?
There is no dispute that the four purportedly missing instruments once existed. Thus, to
establish that these instruments are lost, plaintiffs must demonstrate only “that a bona fide and
diligent search has been unsuccessfully made for” the instruments “in the place where [they
were] most likely to be found . . . .” Thompson, 9 Ind. at 325. To satisfy this requirement,
[i]t is not enough to give some evidence of its loss, but [the party seeking to
establish that a paper is lost] must give such evidence as will satisfy the court that
the proper foundation for the admission of secondary evidence has been laid.
Where a paper which the law requires to be filed and kept by a public officer as
part of the records or papers of his office is alleged to be lost, the court has a right
to require, before receiving parol evidence of its contents, that careful and diligent
search was made in the office, and by one so fully acquainted with the office,
records, and papers as to make it probable that, if the paper was in the office, he
would find it.
Howe, 24 N.E. at 238. Under the law in effect in Indiana when the Vanlaningham and Seerley
instruments were executed, “[e]very conveyance of any real estate” was required to be recorded
in the county recorder’s office, and a failure to record a conveyance instrument within ninety
days would render the conveyance void as against subsequent good-faith purchasers of the real
estate. Ind. Rev. Stat. ch. 28, § 25 (1843); see also id. §§ 46, 48 (requiring county recorders to
keep a book listing the conveyance instruments presented for recording and to record such
instruments, and providing that if a certificate of acknowledgment or proof is not recorded with a
conveyance instrument, the instrument cannot be “read or received in evidence”); id. ch. 8, §§ 6,
9-10 (requiring county recorders to keep a book listing the conveyance instruments presented for
recording, to record all conveyance instruments, and to make an index of recorded conveyance
instruments). The same requirement applied when the Moody and Curtis agreements were
executed, except that the deadline to record a conveyance instrument was forty-five days. Ind.
Rev. Stat. § 2931 (1881); see also id. §§ 2951-2952 (requiring county recorders to keep a book
listing the conveyance instruments presented for recording and to record such instruments, and
providing that if a certificate of acknowledgment or proof is not recorded with an instrument, the
18
Defendant’s position––that so long as it can be established that a written conveyance
instrument existed at one point in time, there can be no adverse possession, and thus the only
way to establish ownership of a parcel conveyed by that instrument is to prove the instrument’s
contents––could lead to the unacceptable situation in which it would be impossible to prove the
ownership of parcels that include ancient lost or destroyed conveyance instruments in their
chains of title.
-18-
instrument cannot be “read or received in evidence”); id. §§ 5930-5931 (requiring county
recorders to keep a book listing the conveyance instruments presented for recording, to record all
conveyance instruments, and to make an index of recorded conveyance instruments).
Defendant argues that plaintiffs have not satisfied these legal requirements because they
have not demonstrated that they conducted “a bona fide and diligent search” of the relevant
county recorder’s office for the purportedly missing instruments. Plaintiffs respond that
although one would expect that these instruments would have been recorded at the time of
execution, the railroad company did not provide recording information for the instruments on the
valuation schedules and maps it prepared in 1918, and therefore it would be incorrect to assume
that the instruments were, in fact, recorded. 19 Instead, they contend that the instruments were
most likely in the possession of the railroad company, and that they satisfied the “bona fide and
diligent search” requirement by seeking the instruments from the railroad company through a
subpoena.
The valuation schedules and maps in the record before the court reflect that the railroad
company acquired the pertinent portions of the corridor through written instruments. These
valuation schedules and maps further reflect that the railroad company maintained copies of most
of the written instruments it identified on those documents, as indicated by the assignment of a
custodian number for those instruments. See generally Pressly Pls.’ Exs. C-1, C-2. No custodian
number was assigned to the four instruments at issue, indicating that the railroad company did
not possess them at the time it prepared the valuation schedules and maps in 1918.
Consequently, pursuant to Valuation Order Number 7, the railroad company was obligated in
1918 to refer to county records to provide the information required on the valuation schedules.
Presumably, the railroad company searched the county records for the instruments not in
its possession; there is no evidence in the record before the court that it did not. See also United
States v. Norton, 97 U.S. 164, 168-69 (1877) (“It is a presumption of law that officials and
citizens obey the law and do their duty; and although it cannot supply the place of proof of a
substantive fact, he who disputes it must furnish the requisite evidence to overcome its effect.”);
President of the Bank of the U.S. v. Dandridge, 25 U.S. 64, 69 (1827) (“[The law] presumes that
every man, in his private and official character, does his duty, until the contrary is proved; it will
presume that all things are rightly done, unless the circumstances of the case overturn this
presumption . . . .”); cf. 37 Stat. at 703 (imposing a penalty of $500 per offense per day against
carriers that failed or refused to comply with the requirements of the Valuation Act or the ICC’s
implementing orders).
19
In their opening supplemental briefs, plaintiffs suggest that because they were not
parties to the purportedly missing instruments, they could only speculate as to the location of the
instruments. This contention is not well taken. The mandate that conveyance instruments be
recorded is not a recent development in the law. See, e.g., 2 Lewis N. Dembitz, A Treatise on
Land Titles in the United States § 126 (1895) (“The recording of deeds affecting land, or, as the
English prefer to call it, the ‘registry of assurances,’ is the universal law and custom throughout
the United States, and has been such almost from the first settlement of each of the colonies.”).
Consequently, the most obvious place to locate the four purportedly missing instruments is the
relevant county recorder’s office.
-19-
Although plaintiffs do not offer evidence that they conducted “a bona fide and diligent
search” for the four purportedly missing instruments in the county records, they did not need to
do so for three reasons. First, there is no requirement that the “bona fide and diligent search” be
performed by the party seeking to have a conveyance instrument declared lost. Thus, plaintiffs
are entitled to rely on searches performed by others. Second, the railroad company is deemed to
have performed a search for the instruments in 1918 when preparing its valuation schedules and
maps, and it would be duplicative to require plaintiffs to perform that same search in the
county’s pre-1918 property records. Third, in response to plaintiffs’ subpoenas, the railroad
company produced all of the conveyance instruments identified by plaintiffs that were in its
possession, including instruments executed before 1918 but recorded after 1918. Because the
uncontroverted evidence shows that the railroad company retained copies of conveyance
instruments it recorded after 1918, and that the four purportedly missing instruments are not in
the railroad company’s possession, a search of the post-1918 county property records for these
instruments is unlikely be fruitful. Indeed, because timely recording would have protected the
railroad company against claims by subsequent good-faith purchasers of the land described in the
purportedly missing instruments, it is reasonable to presume that the instruments would not have
been discovered in county records decades after they were executed. 20 Consequently, the
Vanlaningham instrument, the Moody agreement, the Curtis agreement, and the Seerley
instrument are, under Indiana law, lost instruments.
4. Contents of the Lost Instruments
Because plaintiffs have demonstrated that the four instruments at issue are lost, the
burden of demonstrating that the instruments conveyed fee simple estates to the railroad
company shifts to defendant. As noted above, secondary evidence can be used to establish the
contents of the lost instruments, including the interests they conveyed. The relevant secondary
evidence discussed in Indiana case law consists of copies of the lost instrument and testimony
from witnesses able to describe the instrument’s contents. See, e.g., McCormick Harvesting-
Mach. Co. v. Gray, 16 N.E. 787, 790 (Ind. 1888) (holding that “true and correct copies of the
original instruments” could be admitted as evidence of the original instruments); Thompson, 9
Ind. at 334 (“The property conveyed, the estate created, the conditions annexed, the signing,
sealing, and delivery, are required to be proved with reasonable certainty, by witnesses who can
20
Plaintiffs assert that the railroad company recorded at least one conveyance instrument
in 1927 that it executed, but did not record, decades earlier. The conveyance instrument upon
which they rely does not support their assertion, since it indicates on its face that it was first
recorded in 1901. See Pressly Pls.’ Ex. F-2 at 5. However, the record submitted in support of
the Group 2 summary judgment motions did include two conveyance instruments, produced by
the railroad company pursuant to a subpoena, that appear to have been first recorded in 1927.
See Pls.’ Grp. 2 Summ. J. Exs. E (release executed on March 25, 1851, and recorded on March
14, 1927), S (release executed in the 1840s and recorded on March 14, 1927). It is, therefore,
possible that the railroad company recorded other documents decades late. Nevertheless, the
court is unwilling to presume that the railroad company recorded other conveyance instruments
in a grossly untimely manner, especially since the railroad company did not produce copies of
such instruments in response to plaintiffs’ subpoenas.
-20-
testify clearly to its tenor and contents.”); Willis v. Knauth, 137 N.E. 557, 558-59 (Ind. App.
1922) (“Where an instrument is shown to be lost, its contents may be established by parol proof,
or the introduction of an exact copy thereof. . . . [S]uch contents may be established partly by
one of such methods and partly by the other.” (citations omitted)); Hagey v. Schroeder, 65 N.E.
598, 599 (Ind. App. 1902) (“The original contract had been lost, and, after the proper foundation
was laid, appellee testified, without objection, as to the contents of the contract. Afterwards a
witness testified that he had made an exact copy of the contract before the original was lost.
There was no reversible error in admitting this copy in evidence. It did not differ in any material
respect from the contents of the contract as testified to by the former witness.”). It is undisputed
that no such evidence is available here.
Nor has defendant offered any other evidence regarding the interest conveyed by the lost
instruments. 21 Instead, defendant argues that the information provided on––and absent from––
the relevant valuation schedules suggests that the Vanlaningham and Seerley instruments most
likely conveyed fee simple estates to the railroad company, and that the information on the
valuation schedules regarding the Moody and Curtis agreements indicates that those agreements
did not convey any interest in the land previously conveyed by the Vanlaningham instrument.
The former contention is unpersuasive; that the valuation schedules indicate that the railroad
company was the grantee, reflect that the instruments were executed around the same time that
the PIRC executed releases by which it obtained fee simple interests in the railroad corridor, and
lack any notation that the railroad company adversely possessed or did not own the pertinent
portions of the railroad corridor does not mean that the Vanlaningham and Seerley instruments
conveyed fee simple estates rather than easements. Similarly, the court rejects the latter
contention because the fact that the Moody and Curtis agreements were executed to settle suits
for damages does not mean that no interests in the railroad corridor were conveyed through the
agreements. 22 At bottom, defendant’s arguments regarding the contents of the lost instruments
are mere conjecture, falling well short of what is necessary to meet its burden. Accord
Armstrong, 76 N.E.2d at 693 (“[T]he contents and execution of [a lost] deed must be proven
with reasonable certainty.”).
When an instrument conveying a portion of a railroad corridor has been lost and
secondary evidence of its contents does not exist, Indiana law provides that, in general, the
railroad company does not acquire fee simple title. See Ross, Inc. v. Legler, 199 N.E.2d 346,
348 (Ind. 1964) (“Public policy does not favor the conveyance of strips of land by simple titles to
railroad companies for right-of-way purposes, either by deed or condemnation.”). Rather, the
presumption is that the railroad company acquires, by prescription, only as much as it uses.
Consumers’ Gas Tr. Co. v. Am. Plate Glass Co., 68 N.E. 1020, 1021 (Ind. 1903). Consequently,
when a railroad company “enters without title and constructs its main line, . . . nothing more than
an easement is acquired.” Id.; see also Faukboner v. Corder, 26 N.E. 766, 767 (Ind. 1891) (“One
21
Such evidence might include other documents with a description of the lost
conveyance instrument (for example, wills, other deeds, railroad company correspondence, or
newspaper articles).
22
Of course, because Mr. Curtis is described as a “tenant,” Pressly Def.’s Ex. 6 at 6, it is
unlikely that the Curtis agreement conveyed a fee simple estate to the railroad company.
-21-
may acquire an easement in the lands of another by prescription. To establish the existence of
such easement he must show continuous, uninterrupted, adverse use, under claim of right, and
with the knowledge and acquiescence of the owner of the land. . . . If there has been the use of
an easement for 20 years, unexplained, it will be presumed to be under a claim of right, and
adverse, and be sufficient to establish a title by prescription, and to authorize the presumption of
a grant, unless contradicted or explained.”); Hoffman v. Zollman, 97 N.E. 1015, 1017-18 (Ind.
App. 1912) (holding, where the evidence reflected that the railroad company “continuously and
adversely used and occupied [the] strip of land” for more than twenty years without color of title
and was “in complete possession, occupancy, and control” of the strip of land, that the railroad
company acquired a prescriptive easement).
In this case, there is no dispute that the PIRC and its successors operated a railroad
through the corridor at issue continuously for more than twenty years. The evidence in the
record reflects that the PIRC “located and constructed” a railroad line between Indianapolis and
Peru, Indiana, prior to 1852, and that the PIRC and its successors operated a railroad on that line
until at least 1907. Pressly Pls.’ Ex. E-1 at 4-5, 22. Accordingly, the PIRC and its successors
possess a prescriptive easement over the portions of the corridor the PIRC originally obtained in
1849 via the now-lost Vanlaningham and Seerley instruments. Furthermore, there is no
indication that the railroad company acquired any rights greater than an easement when it
executed the now-lost Moody and Curtis agreements in 1897. Had such agreements resulted in
the acquisition of fee simple title in that portion of the railroad corridor, the railroad company
would have described a deed reflecting such a conveyance on the valuation schedule.
Having determined that the railroad company possesses a prescriptive easement over the
portions of the railroad corridor at issue, the final issue to address is whether the adjoining
landowners own the fee simple estate underlying the easement. As noted above, “where there is
no language in any of the relevant deeds describing real property that includes the right-of-way,
the title of the owners of land abutting railroad rights-of-way runs to the center of the right-of-
way.” Calumet Nat’l Bank, 682 N.E.2d at 790 (Ind. 1997). Plaintiffs in Pressly and ATS Ford
have produced the deeds by which they acquired parcels adjacent to these portions of the railroad
corridor. See generally Pressly Pls.’ Ex. F-6; ATS Ford Pls.’ Ex. F-5. The descriptions of the
parcels in these deeds do not include the railroad corridor, but instead provide either (1) an
indication that one of the parcel’s boundaries runs along the corridor or (2) a reference to a
specified lot on a recorded plat. See Pressly Pls.’ Ex. F-6 at 30, 41, 45, 58, 90, 106, 121, 156,
369, 384, 389; ATS Ford Pls.’ Ex. F-5 at 169. Accordingly, these plaintiffs own a fee simple
estate to the centerline of the railroad corridor. There being no genuine issues of material fact,
these plaintiffs are entitled to summary judgment on the threshold issue of whether they own fee
simple title to the centerline of the portion of the railroad corridor adjacent to their parcels.
E. Interest Acquired by the Railroad Company Through Other Conveyance Instruments
A fourth subset of the Group 3 plaintiffs owns parcels adjacent to portions of the railroad
corridor acquired by the railroad company through four other conveyance instruments: a
warranty deed executed by John L. Wild and his wife on October 11, 1877 (“Wild deed”); a
quitclaim deed executed by James M. Culbertson and his wife on February 19, 1910
(“Culbertson deed”); a release executed by Willis Threlkell on February 12, 1849 (“Threlkell
-22-
release”); and a release executed by James T. Wright on an unspecified date in the 1840s
(“undated Wright release”). 23 These instruments will be addressed in turn.
1. The Wild Deed
The first instrument at issue is the Wild deed. Plaintiffs did not produce a copy of this
deed, and argue that because recording information was not provided on the valuation schedules
and maps, the deed should be declared lost in the same way that the Vanlaningham instrument,
the Moody and Curtis agreements, and the Seerley instrument have been declared lost.
Defendant counters with the same arguments it previously advanced.
The relevant valuation schedule does not include any recording information for the Wild
deed, but did set forth a custodian number. It also indicates that the grantee was a successor of
the PIRC, that the deed was for a crossing at Chestnut Street, that the land area was 9882 square
feet, and that the consideration paid was $185.29 (with the railroad company to maintain the
crossing). Pressly Pls.’ Ex. C-2 at 25. The information on the associated valuation map does not
contradict the information included on the valuation schedule. See ATS Ford Pls.’ Ex. B-5.
As discussed above, before a conveyance instrument can be declared lost, the party
asserting that the deed is lost must “give some evidence that such a paper once existed—though
slight evidence is sufficient for this purpose—and that a bona fide and diligent search has been
unsuccessfully made for it, in the place where it was most likely to be found . . . .” Thompson, 9
Ind. at 333. Unlike with the Vanlaningham and Seerley instruments, the aforementioned
valuation schedule and map reflect that the railroad company acquired the pertinent portion of
the railroad corridor via a warranty deed and assigned a custodian number to the deed. It is
therefore likely that the Wild deed was in the railroad company’s possession at the time it
prepared the valuation schedule and map, which would have relieved the railroad company of the
obligation imposed by Valuation Order Number 7 to refer to county records to provide the
information required by the ICC. Consequently, the court cannot presume that the railroad
company searched the relevant county records for the Wild deed.
To satisfy the “bona fide and diligent search” requirement for the Wild deed, the county
recorder’s office must have been searched. Howe, 24 N.E. at 238; see also Ind. Rev. Stat. ch. 82,
§ 16 (1876) (requiring the recording of conveyance instruments within forty-five days for the
instruments to be valid against good-faith purchasers), id. §§ 29-30 (requiring county recorders
to keep a book listing the conveyance instruments presented for recording and to record such
instruments, and providing that if a certificate of acknowledgment or proof is not recorded with a
conveyance instrument, the instrument cannot be “read or received in evidence”); id. ch. 233,
§§ 2-3 (requiring county recorders to keep a book listing the conveyance instruments presented
for recording, to record all conveyance instruments, and to make an index of recorded
conveyance instruments). Plaintiffs, however, present no evidence that a search for the Wild
deed in the relevant county recorder’s office was performed. Rather, they rely on the fact that
23
These conveyance instruments affect four claims in ATS Ford: claims 9 (the Wild
deed), 27 (the undated Wright release), 34 (the Culbertson deed and the Threlkell release), and
35 (the Culbertson deed).
-23-
they requested the Wild deed from the railroad company by subpoena as their sole evidence of a
“bona fide and diligent search.” In the face of the requirement that a search for a conveyance
instrument should be performed at the county recorder’s office, plaintiffs’ search efforts are
insufficient.
In the absence of “a bona fide and diligent search,” the Wild deed cannot be declared lost.
Consequently, plaintiffs cannot establish, as a matter of law, that the railroad company acquired
an easement over the relevant portion of the railroad corridor, a prerequisite to establishing a
cognizable property interest. There being no genuine issues of material fact related to the search
for the Wild deed, defendant is entitled to summary judgment with respect to the claim of the
Group 3 plaintiff who owns a parcel adjacent to the portion of the corridor that the railroad
company acquired via the Wild deed.
2. The Culbertson Deed
The second instrument at issue is the deed in which the Culbertsons quitclaimed all of
their “interest right and title” in a forty-foot strip of land to the railroad company. ATS Ford
Pls.’ Ex. H-2. Specifically, the Culbertson deed provides:
This Indenture Witnesseth, That James M. Culbertson and Mary R.
Culbertson, his wife, of Marion County in the State of Indiana,
Release and Quit Claim
to The Lake Erie & Western Railroad Company, for the sum of One
($1.00) Dollar, the following Real Estate in Marion County in the State of
Indiana, to wit:
All our interest right and title in and to all that part of the East half of the
South East Quarter of Section five (5) Township sixteen (16) North, Range four
(4) East, lying within forty (40) feet of the center line of Grantee’s main track on
the Southeasterly side thereof containing one and forty seven one hundredths
(1.47) acres more or less.
Id. Plaintiffs contend that this deed conveys an easement because it does not specify the granting
of a fee simple estate, it describes only nominal consideration, and public policy in Indiana
disfavors the conveyance of fee simple title to strips of land. Defendant, in turn, argues that this
deed conveys fee simple title to the strip of land because there is no reference to a “right of way,”
no indication of the purpose for which the land would be used, and quitclaim deeds convey
everything possessed by the grantor (which defendant assumes is a fee simple estate).
As defendant observes, when the Culbertsons executed this deed, Indiana law provided
that “[a] deed of release or quitclaim shall pass all the estate which the grantor could convey by a
deed of bargain and sale.” Ind. Rev. Stat. § 2924 (1881); see also Deed, Black’s Law Dictionary
(11th ed. 2019) (indicating that a “bargain-and-sale deed” is “[a] deed that lacks an express
covenant about the validity of the title but implies that the grantor holds title to the property and
-24-
conveys it to a buyer for valuable consideration”). Defendant errs, however, in contending that a
quitclaim deed that conveys land without limitation must convey a fee simple estate. Rather,
[t]he general principle is well settled, that a grantor, conveying by deed of bargain
and sale and by way of release or quitclaim of all his right and title to a tract of
land, if made in good faith and without any fraudulent representations, is not
responsible for the goodness of the title beyond the covenants in his deed; and that
a deed of this character purports to convey, and is understood to convey, nothing
more than the interest or estate of which the grantor is seized or possessed at the
time, and does not operate to pass or bind an interest not then in existence.
Nicholson v. Caress, 45 Ind. 479, 485 (1874); accord Habig v. Dodge, 25 N.E. 182, 185 (Ind.
1890) (“The general proposition is abundantly maintained that a deed of release or quitclaim, or
a conveyance of the ‘right, title, and interest’ of the grantor, even though it be with full covenants
of warranty, without designating in the instrument any particular estate, either as owned by the
grantor or as conveyed by the deed, operates simply to transfer whatever interest the grantor may
have had at the time.”). The record before the court lacks any direct evidence of the interest or
title owned by the Culbertsons in the strip of land. It is possible that they owned the strip of land
in fee simple, but it is also possible that they held only a life estate, a future interest in an
unspecified estate, or an easement.
The identity of the property interest possessed by the Culbertsons is a genuine issue of
material fact. Accordingly, the court declines to enter summary judgment to any party with
respect to whether the affected plaintiffs own fee simple title to the centerline of the portion of
the railroad corridor adjacent to their parcels by virtue of the Culbertson deed. 24
3. The Threlkell Release and the Undated Wright Release
The final two instruments at issue are the Threlkell release and the undated Wright
release. The court addressed both of these releases in its Group 2 summary judgment decisions,
concluding that they conveyed a fee simple estate to the railroad company. See, e.g., ATS Ford,
156 Fed. Cl. at 414-15. The court finds no reason to revisit this conclusion and, in fact, the
24
To the extent that the Culbertsons possessed fee simple title to the strip of land, the
Culbertson deed conveys a fee simple estate to the railroad company. Unlike in Vandalia
Railroad Co. v. Topping, 113 N.E. 421 (Ind. App. 1916), relied upon by plaintiffs, the
Culbertson deed does not use the term “right of way” or indicate the purpose of the conveyance.
See also Consol. Rail Corp. v. Lewellen, 682 N.E.2d 779, 782 (Ind. 1997) (“The general rule is
that a conveyance to a railroad of a strip, piece, or parcel of land, without additional language as
to the use or purpose to which the land is to be put or in other ways limiting the estate conveyed,
is to be construed as passing an estate in fee, but reference to right of way in such a conveyance
generally leads to its construction as conveying only an easement” (quoting Brown v. Penn Cent.
Corp., 510 N.E.2d 641, 644 (Ind. 1987))). A separate distinguishing factor is that the railroad
company in Vandalia Railroad Co. was organized under the 1852 law for the incorporation of
railroad companies rather than by a pre-1952 legislative charter, as in this case. See 113 N.E. at
423.
-25-
parties do not request that it do so. 25 Therefore, in the absence of any genuine issues of material
fact, defendant is entitled to summary judgment with respect to the claims of the Group 3
plaintiffs who own parcels adjacent to the portion of the corridor that the railroad company
acquired via the Threlkell release and the undated Wright release. 26
F. Intervening Strips of Land
The final subset of the Group 3 plaintiffs owns parcels in the Northeast Commerce Park
subdivision of the City of Fishers. 27 Northeast Commerce Park was established by local
ordinance in January 1986 as a planned development district. Pressly Pls.’ Suppl. Ex. H.
Pursuant to that ordinance, which amended the then-Town of Fishers zoning code, 28 id. at 1, the
subdivision could be developed in phases, id. at 5. The ordinance also required that the
subdivision have (1) covenants that “set forth in detail provisions for the ownership and
maintenance of facilities held in common so as to reasonably insure their continuity and
[conservation],” id. at 6, and (2) “[a]dequate provision . . . for [a] private organization with direct
responsibility to, and control by, the property owners involved to provide for the operation and
maintenance of all common facilities such as the retention pond,” id. at 7; accord Pressly Pls.’
Suppl. Ex. J at 323 (indicating, in the then-Town of Fishers zoning code, that “[w]here a
Common Area is designated on the plat . . . of a commercial or residential project, a Property
Owner’s Association shall be formed and be required to provide necessary maintenance to the
common area”), 460-61 (providing, in the “Platting of Multi-Family, Commercial, and Industrial
Subdivisions” section of the then-Town of Fishers subdivision control regulations, that
subdivision plats “shall include covenants”; that “those covenants shall explicitly establish the
ownership, assessments, dues and programs which will insure the future maintenance of . . . on-
25
Plaintiffs initially contended that the Threlkell release had been lost, but conceded that
it was not lost after defendant observed that it had been produced as an exhibit to plaintiffs’
motion for summary judgment regarding the claims of the Group 2 plaintiffs.
26
Defendant contends that the claim affected by both the Culbertson deed and the
Threlkell release, ATS Ford 34, must fail because the land conveyed by the Culbertson deed lies
between the relevant parcel and the railroad corridor, cutting off any interest the parcel owner
might possess in the railroad corridor. Plaintiffs disagree, asserting that the Culbertson deed and
the Threlkell release affect different portions of the parcel. However, plaintiffs have not
produced evidence demonstrating where the parcel is situated in relation to the land conveyed by
the Culbertson deed and the Threlkell release, and the court is unable to discern this information
from the evidence in the record.
27
The relevant claims are Pressly 32, 39, and 265. A fourth claim, ATS Ford 20, was
initially part of this subset, but defendant conceded liability on this claim and does not object to
it being placed in Group 1.
28
The zoning code is one chapter of the comprehensive plan adopted by the then-Town
of Fishers in 1980. Pressly Pls.’ Suppl. Ex. J at 40-41. As relevant here, the 1980
comprehensive plan also included a chapter titled “Subdivision Control.” Id. at 40, 417-65.
-26-
site, nondedicated, development entities” such as “open spaces”; and that such “open spaces . . .
are frequently referred to as ‘common areas’”).
In accordance with the 1986 ordinance, the owner of the subdivision, Northeast
Commerce Park, an Indiana Limited Partnership (“Partnership”), recorded a “Declaration of
Protective Covenants” (“Declaration”). See Pressly Pls.’ Ex. D-5. The Declaration did not
address ownership of common areas, but did provide for the creation of a property owners
association, id. at 9, and did specify, in a section titled “Common Area Maintenance Expenses,”
that each lot owner was responsible for a “pro-rata share of all expenses associated with
adequately maintaining and preserving the retention pond and all swales located in Northeast
Commerce Park,” id. at 38.
Thereafter, the Partnership, as permitted, developed the subdivision in phases. Pressly
Pls.’ Exs. D-1 at 2, D-2 at 3, D-3 at 2. The parcels owned by plaintiffs appear on the recorded
plats of the first, seventh, and eighth phases, Pressly Pls.’ Ex. F-6 at 21, 25, 175, and are
separated from the railroad corridor by two parallel, contiguous strips of land: a road identified
on the subdivision plats as “Technology Drive” (immediately adjacent to the parcels) and a strip
of land identified on the subdivision plats as “common property (Block ‘A’)” (between
Technology Drive and the railroad corridor), Pressly Pls.’ Exs. D-1 at 2, D-2 at 3, D-3 at 2. 29
Plaintiffs contend that on the date that the NITUs were issued, the owners of these parcels
possessed a fee interest in both the common property and the land underlying Technology Drive,
and therefore owned to the centerline of the railroad corridor. 30 Defendant responds that the City
of Fishers, and not the parcel owners, owned the common property on the date that the NITUs
were issued, therefore blocking any interest the parcel owners could claim in the railroad
corridor. In support of this contention, defendant observes that the Partnership dedicated the
common property identified on the three plats to the City of Fishers on June 8, 2017, Pressly
Pls.’ Exs. D-6, D-7 at 4-7, D-8 at 4-7, and that the City of Fishers accepted the dedications on
June 26, 2017, Pressly Pls.’ Ex. D-7 at 2-3. Defendant also argues that, in any event, the
Partnership owns the reversionary interest in Technology Drive, further blocking any interest
that the parcel owners could claim in the railroad corridor. Given these arguments, there are two
controlling questions: (1) Who owned Technology Drive on the date of the taking? (2) Who
owned the common property on the date of the taking? If the relevant parcel owners did not own
either strip of land on the date of the taking, then their claims must fail.
1. Technology Drive
Turning first to the ownership of the fee estate underlying Technology Drive, each of the
plats includes the following statement, or a substantially similar statement, dedicating the platted
streets to public use:
29
The road is identified as “Technology Drive” on the subdivision plats but as
“Technology Lane” on current maps.
30
There is no dispute that the railroad company possesses an easement over this portion
of the railroad corridor.
-27-
ALL STREETS SHOWN ON THE WITHIN PLAT ARE HEREBY
DEDICATED TO THE PERPETUAL USE OF THE PUBLIC FOR PROPER
PURPOSES, RESERVING TO THE DEDICATORS, THEIR SUCCESSORS
OR ASSIGNS THE REVERSION OR REVERSIONS THEREOF, WHENEVER
DISCONTINUED BY LAW.
Pressly Pls.’ Ex. D-1 at 2; accord Pressly Pls.’ Exs. D-2 at 3, D-3 at 2. In Indiana, “one who
dedicates a street, retaining the adjoining lots, retains the fee in the street, which fee will pass
from him by a conveyance of the lots.” Erwin v. Cent. Union Tel. Co., 46 N.E. 667, 669 (Ind.
1897). In particular,
a conveyance of land bounded on a highway carries with it the fee to the center of
the road, as part and parcel of the grant, unless such inference shall be expressly
excluded, and . . . this rule is applicable where the land conveyed is a lot or part of
a lot in a town or city, designated on the plat by its number, or ascertained by its
appropriate description, and abutting on a public street, lane, or alley.
Cox, 48 Ind. at 188; accord Swaim, 171 N.E. at 876 n.1 (“Where land has been dedicated by its
owner for a street or highway, a subsequent conveyance of the abutting land by such owner
carries with it the fee to the center of the street or highway, as it will not be presumed that a
grantor who parts with all his right and title to the adjoining land intends to withhold his interest
in the road to the middle of it.”). Thus, “when streets are vacated the fee thereof to the center of
the street continues in the owner of the abutting land; in other words, it goes back to the grantee,
immediate or remote, of the owner who dedicated it to public use.” Brackney v. Boyd, 125 N.E.
238, 238 (Ind. App. 1919); accord AmRhein v. Eden, 779 N.E.2d 1197, 1209 (Ind. Ct. App.
2002) (“‘Generally speaking when a street or highway is vacated or abandoned the title to the
land reverts to the abutting property owners.’ This rule is based upon the presumption that the
abutting landowners own to the center of the street or highway subject only to an easement of the
public to use the street or highway.” (quoting Gorby v. McEndarfer, 191 N.E.2d 786, 791 (Ind.
App. 1963))); cf. Kosciusko Cnty. Cmty. Fair, Inc. v. Clemens, 116 N.E.3d 1131, 1136-37 (Ind.
Ct. App. 2018) (holding, where a restrictive covenant provided that it was enforceable by the
homeowner’s “successors and assigns,” that a homeowner’s “successor in title” to the affected
property could enforce the restrictive covenant).
It is readily apparent that the statement on the Northeast Commerce Park plats dedicating
the platted streets to public use is merely a restatement of the common law in Indiana.
Consistent with the common law, the Partnership (1) dedicated the platted streets to public use;
(2) retained the right to recover the streets if they were vacated or abandoned; and (3) noted that
the right to recover the streets belonged to it and its immediate or remote grantees. The plaintiffs
who own the parcels at issue are remote grantees of the Partnership. See Pressly Pls.’ Ex. F-6 at
18-21, 25-26, 175. Accordingly, under the centerline presumption, they own a fee simple
interest to the centerline of Technology Drive subject to the public use easement.
-28-
2. The Common Property
To establish that they own a fee simple interest in the other half of Technology Drive,
these parcel owners must also possess a fee simple interest in the common property situated
between Technology Drive and the railroad corridor (since the fee owner of the common
property owns to the centerline of Technology Drive). Each plat identifies the strip of land
between Technology Drive and the railroad corridor as “common property,” and indicates that
the subdivision phase consists of the lots, “together with common property (‘Block A’), streets
and easements” as therein depicted. Pressly Pls.’ Exs. D-1 at 2, D-2 at 3; accord Pressly Pls.’ Ex.
D-3 at 2; see also Pressly Pls.’ Suppl. Ex. J at 425-26 (requiring, in the “Subdivision Control”
chapter of the then-Town of Fishers comprehensive plan, that plats “indicate and show . . .
[a]ccurate outlines . . . of any area to be reserved by deed or covenant for common use by owners
of land obtained in the plat”). The plats do not, however, indicate who would own the common
property upon the conveyance of the platted lots. See Pressly Pls.’ Exs. D-1 at 2, D-2 at 3, D-3
at 2. And, notwithstanding the requirements of the 1986 ordinance, the Declaration is similarly
silent on this issue, see Pressly Pls.’ Ex. D-5, and there is no evidence that the property owners
association described in the Declaration was ever constituted, Pressly Pls.’ Suppl. Ex. K ¶ 24.
Moreover, the applicable local ordinances, the Indiana Code, and Indiana case law provide
practically no guidance regarding the ownership of land designated on a plat as common
property. 31 See, e.g., Pressly Pls.’ Suppl. Ex. H (1986 ordinance); Pressly Pls.’ Suppl. Ex. J
(then-Town of Fishers comprehensive plan).
Given this lack of guidance, plaintiffs turn to the definitions of “common property” (“1.
Real property that is held by two or more persons with no right of survivorship.” or “2. Common
area.”) and “common area” (“1. . . . The realty that all tenants may use though the landlord
retains control and responsibility over it.” or “2. An area owned and used in common by the
residents of a condominium, subdivision, or planned-unit development.”) set forth in Black’s
Law Dictionary, and argue that “[b]ecause the Declaration identifies that expenses associated
with Common Areas are to be split based upon a pro-rata share of the areas of the owners’ lots,
the intent of the dedicators was to vest ownership of the common property, including Block A,
with the lot owners.” Pressly Pls.’ Mot. 8-9. Plaintiffs further contend that because the
Partnership did not expressly reserve the reversion in the common property, as it did with the
streets, it intended that title to the common property be held by the lot owners. Defendant, in
contrast, argues that the plats reflect that the Partnership did not intend to convey ownership in
the common property to the lot owners, remarking that the plats identify the common property
and lots as distinct elements, and that the Partnership later represented to the City of Fishers that
it owned the common property when it dedicated it to the City of Fishers in 2017 for use as a
public right of way.
31
Notably, section 8.4.3 of the current zoning code of the City of Fishers provides that
“[a]ll open space, common area and amenities shall be owned, operated and maintained in
perpetuity by an owners’ association, condominium association, or similar legal entity.” Fishers,
Ind., Unified Development Ordinance (July 20, 2018), http://online.encodeplus.com/regs/fishers-
in/doc-viewer.aspx#secid-266.
-29-
As the parties observe, the three plats at issue do not include any language affirmatively
declaring what interest, if any, the Partnership was retaining in the common property. However,
the lack of such language on the plats does not mean that the Partnership intended to convey a
fee simple interest in the common property to the adjacent lot owners. In fact, the opposite
conclusion must be drawn. The relevant local and state legal authorities do not provide any rules
or presumptions governing the ownership of land designated as “common property,” “common
ground,” or “common area” on a plat. Thus, absent any evidence on the plats that the
Partnership intended to relinquish fee ownership of the common property to the adjacent lot
owners, 32 the court must conclude that the Partnership continued to own the common property
after it recorded the plats.
Other evidence in the record before the court supports this conclusion. The Declaration
does not indicate who owns the common property, but merely provides that all of the lot owners
(regardless of their adjacency to the common property) must pay to maintain and preserve a
retention pond and swales. Further, each of the deeds through which the relevant plaintiffs
acquired their parcels describes the property being conveyed as a numbered lot in the
subdivision, and lacks any reference to the common property. 33 Finally, the Partnership
represented to the City of Fishers that it owned the common property when it dedicated the same
for use as a public right of way, and the record before the court contains no evidence that any of
the subdivision’s lot owners objected to the dedication as an infringement of their property
rights.
In short, based on the evidence before the court, plaintiffs have not established, as a
matter of law, that the Group 3 plaintiffs who own parcels in the Northeast Commerce Park
subdivision held a fee simple interest in the common property at the time that the NITUs were
issued. Accordingly, those plaintiffs do not have a fee simple interest in the land underlying the
railroad corridor. There being no genuine issues of material fact, defendant is entitled to
summary judgment with respect to the claims of these plaintiffs.
32
Plaintiffs’ reliance on the dictionary definitions of “common property” and “common
area” is unavailing. In Indiana, residents of a condominium, subdivision, or planned unit
development do not necessarily own the associated common areas. See, e.g., City of
Indianapolis v. Towne & Terrace Corp., 106 N.E.3d 507, 509 (Ind. Ct. App. 2018) (“Unlike
more recent condominium developments, Towne & Terrace homeowners are members of Towne
& Terrace and do not own any interest in its common areas.”); Pulte Homes of Ind., LLC v.
Hendricks Cnty. Assessor, 42 N.E.3d 590, 592 (Ind. T.C. 2015) (remarking that the developer
“owns a substantial number of common area parcels of land that are within several residential
neighborhoods”).
33
To the extent that the “non-exclusive easements” conveyed by one of the deeds,
Pressly Pls.’ Ex. F-6 at 21, included the common property, the common property necessarily was
not being conveyed in fee simple.
-30-
IV. CONCLUSION
For the reasons set forth above, the court GRANTS the Pressly and ATS Ford plaintiffs’
motions for summary judgment––and DENIES defendant’s cross-motions for summary
judgment––with respect to the following claims:
• Pressly: 1a, 1b, 41, 56, 64a, 64b, 78, 83, 93, 95, 109a, 109b, 110, 124, 130,
137, 150a, 150b, 151, 153, 162, 215, 216, 217, 249, 270a, 270b, 270c, 270d,
270e, 278, 284, 290, 292a, 292b, and 298.
• ATS Ford: 20 and 32.
These claims shall be transferred to Group 1 for the determination of just compensation.
In addition, the court GRANTS defendant’s cross-motions for summary judgment––and
DENIES plaintiffs’ motions for summary judgment––with respect to the following claims:
• Pressly: 16, 32, 39, 103, 147a, 147b, 204a, 204b, 204c, 204d, 211, 247a,
247b, 265, 268a, 268b, 268c, and 268d.
• ATS Ford: 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 21, 27, and 34 (the portion affected
the Threlkell release).
These claims are DISMISSED WITH PREJUDICE.
Finally, the court DENIES all summary judgment motions with respect to the following
claims:
• ATS Ford: 34 (the portion affected only by the Culbertson deed), and 35.
By no later than Friday, April 15, 2022, the parties shall file a joint status report suggesting
further proceedings on these claims, as well as on the claims transferred to Group 1. In addition,
by that same deadline, plaintiffs in Pressly and ATS Ford shall file updated notices identifying
the claims assigned to Group 1 and Group 3.
IT IS SO ORDERED.
s/ Margaret M. Sweeney
MARGARET M. SWEENEY
Senior Judge