Sierra Club v. U.S. Army Corps of Engineers

                                                                                    [PUBLISH]

                  IN THE UNITED STATES COURT OF APPEALS

                             FOR THE ELEVENTH CIRCUIT
                              ________________________                FILED
                                                             U.S. COURT OF APPEALS
                                                               ELEVENTH CIRCUIT
                                       No. 01-11179                JUNE 25, 2002
                                ________________________        THOMAS K. KAHN
                        D.   C. Docket No. 99-00286 CV-J-16-TJC      CLERK

SIERRA CLUB,
JUDY ROSIER, et al.,

                                                                         Plaintiffs-Appellants,

                                             versus

U.S. ARMY CORPS OF ENGINEERS,

                                                                          Defendant-Appellee.
                               ________________________

                      Appeal from the United States District Court
                          for the Middle District of Florida
                           _________________________

                                       (June 25, 2002)

Before ANDERSON and BLACK, Circuit Judges, and MORENO*, District Judge.

ANDERSON, Circuit Judge:



_____________________
*Honorable Federico A. Moreno, U S. District Judge for the Southern District of Florida, sitting by
designation.
      The Sierra Club and several individually named plaintiffs ("Sierra Club")

brought suit against the United States Army Corps of Engineers ("Corps") and the

Florida Department of Transportation ("FDOT") seeking to halt construction of the

Suncoast Parkway, a 41.6 mile, four-lane tollroad that runs north-south from

Hillsborough County, Florida through Pasco and Hernandez Counties. Sierra Club

argues that the Corps failed to comply with the procedural requirements of Section 7

of the Endangered Species Act ("ESA"), 16 U.S.C. § 1536. Granting summary

judgment in favor of the Corps and FDOT on the issues now before us, the district

court entered final judgment. Sierra Club appeals. We affirm.

                                         I. FACTS

      A. Legal Background

             1. The Endangered Species Act

      The Endangered Species Act, 16 U.S.C. §§ 1531-1544, charges federal agencies

to carry out the Congressional policy of conserving endangered or threatened plant

and animal species. To that end, Section 7 of the ESA requires every federal agency

to insure that its actions are not likely to jeopardize the continued existence of any

species which has been listed as endangered or threatened. 16 U.S.C. § 1536(a)(2).1

      1
       16 U.S.C. § 1536(a)(2) reads:

      Each Federal agency shall, in consultation with and with the assistance of the
      Secretary, insure that any action authorized, funded, or carried out by such agency

                                              2
Every agency is required to verify that its actions will not jeopardize any land-based

listed species by consulting with, and obtaining the assistance of, the Secretary of

Interior, acting through the Fish and Wildlife Service ("FWS").2 Id. Using "the best

scientific and commercial data available," an agency must determine if any listed

species may be present in the area affected by a proposed project, and must confer

with the Secretary whenever an action is likely to affect such a species. 16 U.S.C. §

1536(a).

       Implementing regulations establish that an agency "action" includes "all

activities or programs of any kind authorized, funded, or carried out, in whole or in

part, by Federal agencies in the United States." 50 C.F.R. § 402.02. This definition

specifically includes the granting of permits. Id. The ESA provides that consultation

with the Secretary may occur in cooperation with a prospective permit applicant if it

is believed that a listed species may be affected by the proposed project.3 16 U.S.C.


       (hereinafter in this section referred to as an "agency action") is not likely to
       jeopardize the continued existence of any endangered species or threatened
       species or result in the destruction or adverse modification of habitat of such
       species which is determined by the Secretary, after consultation as appropriate
       with affected States, to be critical, unless such agency has been granted an
       exemption for such action . . . . In fulfilling the requirements of this paragraph
       each agency shall use the best scientific and commercial data available.
       2
       Consultation for marine species is made with the Secretary of Commerce, through the
National Marine Fisheries Service.
       3
        16 U.S.C. § 1536(a)(3) reads:


                                                 3
§ 1536(a)(3). That consultation, and any opinions which are issued as a result, is

treated as a consultation between the agency and FWS, as required by 16 U.S.C. §

1536(a)(2), provided that no significant changes to the action have been made between

the time of the consultation and the actual permitting of the action. 16 U.S.C. §

1536(b)(3)(B).4

       As part of the consultation requirement, the agency is required to ask FWS in

writing, whether, in its opinion, a listed or proposed species may be present in the

action area.5 16 U.S.C. § 1536(c)(1).6 If FWS responds that no protected species are


       Subject to such guidelines as the Secretary may establish, a Federal agency shall
       consult with the Secretary on any prospective agency action at the request of, and
       in cooperation with, the prospective permit or license applicant if the applicant
       has reason to believe that an endangered or threatened species may be present in
       the area affected by his project and that implementation of such action will likely
       affect such species.
       4
        16 U.S.C. § 1536(b)(3)(B) reads:

       Consultation under subsection (a)(3) of this section, and an opinion issued by the
       Secretary incident to such consultation, regarding an agency action shall be
       treated respectively as a consultation under subsection (a)(2) of this section, and
       as an opinion issued after consultation under such subsection, regarding that
       action if the Secretary reviews the action before it is commenced by the Federal
       agency and finds, and notifies such agency, that no significant changes have been
       made with respect to the action and that no significant change has occurred
       regarding the information used during the initial consultation.
       5
        The action area is not limited only to the immediate area involved in the project, but
includes "all areas to be affected directly or indirectly" by the agency action. 50 C.F.R. §
402.02.
       6
        16 U.S.C. § 1536(c)(1) reads:

       To facilitate compliance with the requirements of subsection (a)(2) of this section,

                                                4
present, the consultation requirement ends. If, however, FWS responds that there may

be an endangered or threatened species in the action area, the agency is required to

prepare a biological assessment ("BA"), which identifies any listed species within the

area and evaluates the potential effects of the action on those species. 16 U.S.C. §

1536(c)(1); 50 C.F.R. § 402.02. The BA requirement can be fulfilled as part of the

agency's procedural requirements established by the National Environmental Policy

Act of 1969 ("NEPA"), 42 U.S.C. § 4332, which are described below. 16 U.S.C. §

1536(c)(1).

      According to the implementing regulations, a BA is also required for all federal

actions which constitute a "major construction activity," whether or not a listed

species is suspected in the area. 50 C.F.R. § 402.12(b)(1). A "major construction

activity" is defined as "a construction project (or other undertaking having similar

physical impacts) which is a major Federal action significantly affecting the quality



      each Federal agency shall, with respect to any agency action . . . request of the
      Secretary information whether any species which is listed or proposed to be listed
      may be present in the area of such proposed action. If the Secretary advises,
      based on the best scientific and commercial data available, that such species may
      be present, such agency shall conduct a biological assessment for the purpose of
      identifying any endangered species or threatened species which is likely to be
      affected by such action. Such assessment shall be completed within 180 days
      after the date on which initiated . . . and, before any contract for construction is
      entered into and before construction is begun with respect to such action. Such
      assessment may be undertaken as part of a Federal agency's compliance with the
      requirements of section 102 of the National Environmental Policy Act of 1969
      (42 U.S.C. § 4332).

                                               5
of the human environment as referred to in [NEPA, 42 U.S.C. § 4332(2)(C)]." 50

C.F.R. § 402.02. The term "major" reinforces the term "significantly," but has no

meaning independent of it. Andrus v. Sierra Club, 442 U.S. 347, 364 n.23, 99 S.Ct.

2335, 2344 n.23 (1979); 40 C.F.R. § 1508.18. The regulations promulgated to

institute NEPA also specifically provide that "major" actions include approving

permits for construction. 40 C.F.R. § 1508.18(b)(4).

      If the BA reveals no potential jeopardy to a listed species, and FWS either

agrees or proposes alternatives which would eliminate any jeopardy it perceives, the

project may proceed. 50 C.F.R. § 402.12(k)(1). As part of the "no jeopardy" finding,

the FWS may issue an incidental take permit, which authorizes incidental taking of

the species and specifies the taking's impact, any "reasonable and prudent" minimizing

measures that must be implemented, and the terms and conditions imposed upon the

agency or permit applicant. 16 U.S.C. § 1536(b)(4).7

      7
       16 U.S.C. § 1536(b)(4) reads:

      If after consultation under subsection (a)(2) of this section, the Secretary
      concludes that--

             (A) the agency action will not violate such subsection, or offers
             reasonable and prudent alternatives which the Secretary believes
             would not violate such subsection;
             (B) the taking of an endangered species or threatened species
             incidental to the agency action will not violate such subsection;
             and
              ....


                                                6
      If, on the other hand, the BA does reveal a potential impact on a listed

species, the agency must initiate "formal consultation" with FWS. 50 C.F.R. §

402.14. Formal consultation requires FWS to review the available data and

evidence, evaluate the status of the species and the potential effects of the agency

action, and formulate a biological opinion, which states whether the action and its

cumulative effects is likely to jeopardize the continued existence of the species. 16

U.S.C. § 1536(b)(3)(A);8 50 C.F.R. § 402.14(g)-(h). If potential jeopardy to a

species exists, the FWS may suggest "reasonable and prudent alternatives" which



      the Secretary shall provide the Federal agency and the applicant concerned, if
      any, with a written statement that--

             (i) specifies the impact of such incidental taking on the species,
             (ii) specifies those reasonable and prudent measures that the
             Secretary considers necessary or appropriate to minimize such
             impact,
              ....
             (iv) sets forth the terms and conditions (including, but not limited
             to, reporting requirements) that must be complied with by the
             Federal agency or applicant (if any), or both, to implement the
             measures specified under clauses (ii) and (iii).
      8
       16 U.S.C. § 1536(b)(3)(A) reads:

      Promptly after conclusion of consultation under paragraph (2) or (3) of subsection
      (a) of this section, the Secretary shall provide to the Federal agency and the
      applicant, if any, a written statement setting forth the Secretary's opinion, and a
      summary of the information on which the opinion is based, detailing how the
      agency action affects the species or its critical habitat. If jeopardy or adverse
      modification is found, the Secretary shall suggest those reasonable and prudent
      alternatives which he believes would not violate subsection (a)(2) of this section
      and can be taken by the Federal agency or applicant in implementing the agency
      action.

                                               7
the agency might take to avoid harming the species. 16 U.S.C. § 1536(b)(3)(A).

An incidental take permit may be issued if the alternatives offered will sufficiently

minimize the impact to remove the potential jeopardy to the species. 16 U.S.C. §

1536(b)(4)(a); 50 C.F.R. § 402.14(i)(1).

             2. The National Environmental Policy Act

      Agencies are also required by statute to consider the environmental

consequences of their actions more generally. The National Environmental Policy

Act of 1969, 42 U.S.C. §§ 4321-4370d, is not a substantive environmental statute

which dictates a particular outcome if certain consequences exist. Instead, NEPA

creates "a particular bureaucratic decisionmaking process." Sierra Club v. Marsh,

872 F.2d 497, 497 (1st Cir. 1989). Section 102(2), 42 U.S.C. § 4332(2)(C),9

      9
       42 U.S.C. § 4332(2)(C) reads:

      [A]ll agencies of the Federal government shall--

      include in every recommendation or report on proposals for legislation and other
      major Federal actions significantly affecting the quality of the human
      environment, a detailed statement by the responsible official on--

             (i) the environmental impact of the proposed action,
             (ii) any adverse environmental effects which cannot be avoided should the
             proposal be implemented,
             (iii) alternatives to the proposed action,
             (iv) the relationship between local short-term uses of man's environment and the
             maintenance and enhancement of long-term productivity, and
             (v) any irreversible and irretrievable commitments of resources which would be
             involved in the proposed action should it be implemented.

      Prior to making any detailed statement, the responsible Federal official shall

                                               8
contains a Congressional mandate that federal agencies consider the environmental

impact, and potential alternatives, for every proposed "major Federal action

significantly affecting the quality of the human environment." It is an "action-

forcing" provision designed to prevent agencies from acting on incomplete

information and to "ensure[] that important effects will not be overlooked or

underestimated only to be discovered after resources have been committed or the

die otherwise cast." Robertson v. Methow Valley Citizens Council, 490 U.S. 332,

349, 109 S.Ct. 1835, 1845 (1989).

       The first requirement NEPA imposes on an agency is to determine whether

an action is a "major" action with a "significant effect."10 This determination

requires preparation of an environmental assessment ("EA"). Hill v. Boy, 144 F.3d

1446, 1450 (11th Cir. 1998); 40 C.F.R. § 1501.3. The EA should provide enough

evidence and analysis to guide the agency to one of two conclusions: (1) a finding



       consult with and obtain the comments of any Federal agency which has
       jurisdiction by law or special expertise with respect to any environmental impact
       involved. Copies of such statements and the comments and views of the
       appropriate Federal, State, and local agencies, which are authorized to develop
       and enforce environmental standards, shall be made available to the President, the
       Council on Environmental Quality and the public as provided by section 552 of
       Title 5, and shall accompany the proposal through the existing agency review
       processes . . . .
       10
        The general meaning of this phrase is the same as it is under the ESA. The term
"major" has no meaning independent of "significant," and issuing permits can constitute a major
action.

                                               9
that the project will have a significant effect, or (2) a finding of no significant

impact ("FONSI"). If the latter conclusion is reached, the agency issues a FONSI,

which incorporates the EA and explains why the action will not have a significant

effect on the human environment. 40 C.F.R. § 1508.13.

      If the conclusion in the EA is that the action will have a significant effect,

then the project is "major," and the agency must prepare an environmental impact

statement ("EIS"), as described in 42 U.S.C. § 4332(2)(C). The EIS must "provide

full and fair discussion of significant environmental impacts." 40 C.F.R. § 1502.1.

It is to "be used by Federal officials in conjunction with other relevant material to

plan actions and make decisions." Id. The discussion should include any potential

impact on endangered or threatened species.

      Part of the EIS process is determining the appropriate scope of the analysis

required. This is accomplished by considering exactly what type of action is

involved, its direct and indirect impacts, and potential alternatives. The scope may

also depend upon the relationship of the EIS to other environmental impact

statements. If an action is a component of a larger project, an agency may "tier" its

EIS's in order to "eliminate repetitive discussions of the same issues and to focus

on the actual issues ripe for discussion." 40 C.F.R. § 1502.20. This is

accomplished by incorporating earlier statements into the new analyses, and


                                           10
focusing only what has not previously been considered. Tiering is also appropriate

where a broad EIS has already been prepared and the agency is now considering

specific aspects of a proposal.

      Agencies are not required to duplicate the work done by another federal

agency which also has jurisdiction over a project. NEPA regulations encourage

agencies to coordinate on such efforts. As early as possible, a lead agency should

be designated. Other involved agencies are designated "cooperating agencies." 40

C.F.R. § 1501.6. A lead agency, who ultimately signs the EIS, is responsible for

ensuring the involvement of all other agencies involved and supervising the EIS

preparation. 40 C.F.R. §§ 1501.5(a), 1501.6(a). The lead agency shall use the

environmental analyses of the cooperating agencies "to the maximum extent

possible." 40 C.F.R. § 1501.6(a)(2). Cooperating agencies are permitted to adopt

an EIS signed by the lead agency, provided they undertake "an independent review

of the statement" and determine that their "comments and suggestions have been

satisfied." 40 C.F.R. § 1506.3(c).

      If, after the original EIS is prepared, the agency "makes substantial changes

in the proposed action that are relevant to environmental concerns," or if there are

"significant new circumstances or information relevant to environmental concerns

and bearing on the proposed action or its impacts," the agency is required to


                                         11
prepare a supplemental environmental impact statement (SEIS). 40 C.F.R. §

1502.9(c)(1). The standard for determining when an SEIS is required is

"essentially the same" as the standard for determining when an EIS is required.

Envtl. Def. Fund v. Marsh, 651 F.2d 983, 991 (5th Cir. Unit A July 1981).11 If

"'the post-[original EIS] changes in the [project] will have a 'significant' impact on

the environment that has not previously been covered by the [original] EIS,'" a

supplement is necessary. Nat'l Wildlife Fed'n v. Marsh, 721 F.2d 767, 782 (11th

Cir. 1983) (quoting Envtl. Def. Fund, 651 F.2d at 991).

              3. Standard of Review

       The procedural requirements of the ESA correspond, and overlap with, the

procedural requirements of NEPA. Challenges brought under either statute are

reviewed by the arbitrary and capricious standard, as defined by the Administrative

Procedure Act, 5 U.S.C. §§ 701-706. Under this standard, the appellate court gives

deference to the agency decision by reviewing for clear error, and by refraining

from substituting its own judgment for that of the agency. Motor Vehicle Mfrs.

Ass'n of the U.S., Inc. v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29, 43, 103

S.Ct. 2856, 2866-67 (1983). However, the court must also look beyond the scope


       11
          In Bonner v. City of Pritchard, 661 F.2d 1206, 1209 (11th Cir. 1981) (en banc), this
Court adopted as binding precedent all of the decisions of the former Fifth Circuit handed down
prior to the close of business on September 30, 1981.

                                               12
of the decision itself to the relevant factors that the agency considered. Id. at 43,

103 S.Ct. at 2866-67. Its duty is to ensure that the agency took a "hard look" at the

environmental consequences of the proposed action. North Buckhead Civic Ass'n

v. Skinner, 903 F.2d 1533, 1541 (11th Cir. 1990). This duty requires the court to

consider not only the final documents prepared by the agency, but also the entire

administrative record. Mo. Coalition for the Env't v. Corps of Eng'rs of the U.S.

Army, 866 F.2d 1025, 1031 (8th Cir. 1989).

        An agency has met its "hard look" requirement if it has "examine[d] the

relevant data and articulate[d] a satisfactory explanation for its action including a

'rational connection between the facts found and the choice made.'" Motor Vehicle

Mfrs., 463 U.S. at 43, 103 S.Ct. at 2866. The court will overturn an agency's

decision as arbitrary and capricious under "hard look" review if it suffers from one

of the following: (1) the decision does not rely on the factors that Congress

intended the agency to consider; (2) the agency failed entirely to consider an

important aspect of the problem; (3) the agency offers an explanation which runs

counter to the evidence; or (4) the decision is so implausible that it cannot be the

result of differing viewpoints or the result of agency expertise. Id., 103 S.Ct. at

2867.

        If the court finds deficiencies in the agency's reasoning, it may not rectify


                                           13
them or provide a reasoned basis for the agency decision which the agency itself

has not articulated. Id., 103 S.Ct. at 2867. Instead, it must remand to the agency

so that it may reconsider its own reasoning and decision.



      B. Factual Background

      Planning for the Suncoast Parkway began in 1988. It involved a cooperative

effort between FDOT, the Federal Highway Administration (FHWA), and the

Corps. A draft environmental impact statement was proposed in 1992, and public

hearings were held. Sierra Club did not participate in the hearings.

      Sixteen potential alignments for the Parkway were discussed in the draft

EIS. Because of the potential existence of the eastern indigo snake in the action

area, FDOT initiated formal consultation with FWS, pursuant to Section 7 of the

ESA. After FWS expressed concerns over the methodology used to evaluate the

potential impact on two listed species, the Florida scrub jay and the red-cockaded

woodpecker, additional surveys and a revised biological assessment were also

prepared.

      The formal consultation resulted in a biological opinion, issued in 1993 by

the FWS ("1993 biological opinion"), which concluded that the continued

existence of the eastern indigo snake was not likely to be jeopardized by the


                                         14
Parkway. The biological opinion included an incidental take permit for the eastern

indigo snake, and specific instructions for what steps the contractors must take if a

snake were encountered. The conclusion of FWS was based in part of FDOT's

agreement to purchase and preserve 2700 acres of upland and wetland suitable for

preserving the snake.

      In August, 1994, a final EIS ("1994 EIS") was issued by the FHWA, FDOT,

and the Corps, which included the final selection of the site for the Parkway. As

the road was to be fully funded by the State of Florida, the FHWA terminated its

participation.

      As a means of facilitating the final planning of the Parkway and "preserving

the balance between Florida's environmental protection objectives and the state's

transportation needs," an informal partnering process was organized. Participating

agencies included FDOT, the Corps, FWS, the Southwest Florida Management

District, the Florida Game & Fresh Water Fish Commission, and engineering and

environmental consulting firms. Quarterly meetings were held to evaluate aspects

of the project, including the avoidance and minimization of environmental impacts.

As a result of the partnering process, the alignment of a portion of the road was

altered and the overall length was shortened, thereby reducing wetland impact.

The partnering process also resulted in the development of a mitigation plan, which


                                         15
included the creation of eight wildlife under-crossings and the preservation of two

areas--the 3,635-acre Anclote River Ranch and the 6,533-acre Serenova Tract. In

accordance with the plan, FDOT agreed to place a conservation easement on the

mitigation property and to give $50,000 to the Southwest Florida Water

Management District for wetland study and enhancement of the mitigation

property.

      Beginning in August, 1996, FDOT submitted several joint applications for

the necessary permits, including the federal dredge and fill permit which is the

responsibility of the Corps. A single application for the entire project was not

submitted. Rather, FDOT submitted a separate application for each section of the

Parkway. Each application did, however, lay out both the entire scope of the

project and the proposed mitigation plan. The segmentation was done primarily in

order to deal with surface and storm water concerns in the state permitting process.

      Despite the manner in which they were submitted, the Corps regarded the

applications as components of a single application, with subsequent sections to be

treated as modifications to the original permit. Although it did give separate public

notice of each application, the Corps administered the applications through the use

of a single permit number. Sierra Club raised no objections during the public

comment period on any of the segments of the application.


                                         16
      In September, 1996, the Corps initiated informal consultation with FWS,

pursuant to Section 7 of the ESA, regarding the potential impact of the Parkway on

several species, including the red-cockaded woodpecker, the Florida scrub jay, the

eastern indigo snake, and the wood stork. The FWS responded that the proposed

Parkway was not likely to affect any of the species except the eastern indigo snake.

FWS then referenced its 1993 biological opinion and informed the Corps that

"[t]he proposed compensation plan is consistent with the reasonable and prudent

measures and terms and conditions of that opinion." It concluded by informing the

Corps that its Section 7 consultation requirements had been fulfilled.

      The Corps then prepared an environmental assessment for each of the four

segments included in the application. In considering each section, the Corps

defined the project in its entirety. Discussion of alternatives, avoidance,

minimization, and compensation in the later EAs referred back to the earlier EAs

as in each instance "the review was done for the entire 41.6-mile length of the

road." The EAs also incorporated portions of the 1993 biological opinion, and

specifically relied on the 1994 EIS, the extensive partnering process, and the

mitigation plan. It is clear from the EAs, as well as other documentation in the

administrative record, that the altered alignment of the road was adopted to further

minimize the impact of Parkway.


                                          17
      After completing its review and assessing the potential environmental

impacts, in January, 1997, the Corps determined that an EIS was not necessary and

issued a FONSI for each segment included in the application. A single dredge and

fill permit was issued to FDOT in December, 1997. Applications for later sections

of the Parkway were treated as modifications to the original permit. Public notice

was issued for each modification, and at no time did FWS or Sierra Club respond

with any objections. Each modification was subsequently approved. Construction

of the Parkway began in August, 1998.

      Throughout the ten years of planning, there were at least 6 public notices

issued. At no point throughout the process did Sierra Club respond or provide

comments to the agencies involved. In October, 1998, Sierra Club initiated its first

contact with the agencies by sending the Corps a notice of intent to sue. This was

22 months after the first FONSI was issued, ten months after the permits were

issued, and two months after construction began.

      Sierra Club filed its suit in March, 1999, alleging in part that the Parkway

would, in fact, affect four species that the Corps had determined were not present

in the project area: the Florida panther and three kinds of plants, the Brooksville

bellflower, Cooley's water-willow, and Britton's bluegrass. In response to the suit,

the Corps initiated a third consultation with FWS in order to confirm the earlier


                                         18
determination that the project would not affect those four species. The Corps also

requested confirmation that the 1996 consultation had included the entire project in

its scope. FWS confirmed that the four species would not be adversely affected,

the 1996 consultation covered the entire project, and that the Corps' Section 7

requirements had been fulfilled.

       Sierra Club sought to enjoin further construction of the Suncoast Parkway

not only because of the effects on the four species, but also due to alleged

violations by the Corps of NEPA, the Administrative Procedure Act, the Clean

Water Act, and the ESA. Because the Parkway was partially completed, FDOT

intervened.12 The district court denied Sierra Club a preliminary injunction, and

we affirmed, on the grounds that the doctrine of laches precluded that extreme

relief, and because Sierra Club had failed to demonstrate a sufficient threat of harm

to any endangered or threatened species to justify an injunction.

       All of Sierra Club's claims have since been resolved, with the exception of

their claim that Section 7 of the ESA has been violated. Summary judgment with

respect to the Section 7 claims was entered in favor of the Corps and FDOT, from

which Sierra Club now appeals.



       12
         After the initial denial of the preliminary injunction, Sierra Club amended its complaint
to include the Secretary of FDOT as a defendant.

                                                19
       Sierra Club's primary argument on appeal is that the Corps failed to prepare

a biological assessment as required by Section 7 of the ESA for all major

construction activities. We first discuss that argument, and then turn to Sierra

Club's remaining challenges.



                                      II. DISCUSSION

       A. The Biological Assessment

       Sierra Club argues that the Corps was arbitrary and capricious in not

preparing a biological assessment as part of the permit approval process. It asserts

that the existence of the 1993 BA conclusively establishes that the Parkway is a

major federal construction project which requires an agency to prepare a BA before

taking action. In the alternative, it also argues that because the alignment of the

road was changed, the Corps was required to develop a supplemental EIS and a

new BA. Because we are satisfied that the Corps complied with the statutory

requirements for a major construction activity, we can assume arguendo that the

Parkway is a major federal action.13

       13
          Thus, we need not address the Corps' suggestion that the permitting process is somehow
divorced from the construction project itself, thus avoiding the "major" characterization. But see
Md. Conservation Council, Inc. v. Gilchrist, 808 F.2d 1039, 1042 (4th Cir. 1986) (quoting
Biderman v. Morton, 497 F.2d 1141, 1147 (2d Cir. 1974)) (establishing that a project is a federal
action "if it cannot 'begin or continue without prior approval of a federal agency'"); Fund for
Animals, Inc. v. Lujan, 962 F.2d 1391, 1397 (9th Cir. 1992) (same); Goos v. I.C.C., 911 F.2d

                                               20
       As a preliminary matter, we must clarify the relationship between a

biological assessment, as described in the ESA, and an environmental impact

study, as described in NEPA. A BA is prepared in order to evaluate the impact of

an action on an threatened or endangered species. The ESA specifically provides

that the BA requirement can be fulfilled as part of the procedural requirements

established by NEPA. 16 U.S.C. § 1536(c)(1). When an agency prepares an EIS,

it is complying with the BA requirement, provided that one of the environmental

impacts discussed is the impact on threatened and endangered species.14

       Because the 1994 EIS does evaluate the impact of the road on listed species,

the initial BA requirement was satisfied. If new information regarding endangered

species became available, or if environmental consequences not already evaluated

came to light, the Corps would have been required to prepare a new BA or an

SEIS. It would not, however, have been required to prepare both. We will analyze

Sierra Club's challenge first by demonstrating that the Corps complied with the



1283, 1294 (8th Cir. 1990) (agency has "legal control" over state project, and must comply with
NEPA, when "some federal action 'is a legal condition precedent to accomplishment of an entire
nonfederal project'"); Found. on Econ. Trends v. Heckler, 756 F.2d 143, 155 (D.C. Cir. 1985)
(approval of a nonfederal project constitutes a federal action); 40 C.F.R. § 1508.18(b)(4) ("Major
Federal action" includes "[a]pproval of specific projects, such as construction . . . activities
located in a defined geographic area . . . . [including] actions approved by permit or other
regulatory decision . . . .").
       14
        It is not problematic that the Corps' administrative record does not include the 1993 BA.
The 1994 EIS provides all of the necessary environmental information.

                                               21
statutory requirements for a "major construction activity," and then by asking

whether the Corps should have prepared a supplemental EIS.

       The administrative record establishes that the Corps did fully comply with

the requirements established by NEPA and the ESA for a major project with

significant effects on the human environment. First, it acted as a cooperating

agency in the preparation of the 1994 EIS. Second, it remained involved in the

planning process throughout the development of the mitigation plan and the other

methods to avoid and minimize the impact of the Parkway. Third, the Corps acted

both efficiently and consistently with NEPA regulations by incorporating the

previous studies into its current analysis. The 1997 EAs all incorporate portions of

the 1993 biological opinion and rely the 1994 EIS, as well as the work done during

the partnership process.15 The initial 1997 EA, prepared January 6, 1997,

extensively referred to and relied upon the 1994 EIS and the 1993 biological

opinion. Indeed, the "reasonable and prudent measures" and "terms and

conditions" detailed by FWS in the 1993 biological opinion were incorporated


       15
          Sierra Club argued below, and mentioned in passing on appeal, that the Corps is
estopped from arguing that it adopted the 1994 EIS and the 1993 biological opinion. It asserts
that the Corps failed to adhere to the regulations governing adoption of documents and
incorporation by reference. We find that the Corps sufficiently complied with these regulations.
The 1997 EAs state that this project is the same project discussed in the 1994 EIS. The EAs rely
upon the 1994 EIS throughout. They also include verbatim the minimizing measures of the 1993
biological opinion, which provides clear evidence that the Corps was aware of, and did consider,
the biological opinion when preparing the EAs.

                                              22
verbatim, with notations describing the changes being made to increase the

mitigating effects. Subsequent EAs in 1997 referred back to this January 6, 1997

EA and the 1994 EIS. Such reliance on a previous EIS is specifically authorized.

Regulation 40 C.F.R. § 1502.20, entitled "Tiering" provides in relevant part:

       Whenever a broad environmental impact statement has been prepared
       . . . and a subsequent . . . environmental assessment is then prepared
       on an action included within the entire program . . . the subsequent . . .
       environmental assessment need only summarize the issues discussed
       in the broader statement and incorporate discussions from the broader
       statement by reference . . . .

See also 40 C.F.R. § 1508.28; 50 C.F.R. § 402.12(g); 33 C.F.R. § 230.13(c).16

       Thus, it is clear from the administrative record that the Corps had before it a

full picture of the environmental consequences of the Suncoast Parkway. It

concluded in the EAs that given the alterations to the project and the mitigation

plan, the environmental impacts of the Parkway were no longer significant. We

have previously affirmed the validity of such a decision, where, as here, the

mitigation measures are a condition of agency approval. C.A.R.E. Now, Inc. v.

F.A.A., 844 F.2d 1569, 1575 (11th Cir. 1988) ("When mitigation measures

compensate for otherwise adverse environmental impacts, the threshold level of

       16
         Moreover, the fact that FHWA was the lead agency with respect to the 1994 EIS does
not preclude reliance by the Corps. The Corps was a cooperating agency with respect to the
1994 EIS, and it may adopt an EIS after independent review. 40 C.F.R. § 1506.3(c); 33 C.F.R. §
230.21. It is clear from the instant record that the Corps amply fulfilled the independent review
requirement in this case.

                                               23
'significant impacts' is not reached so no EIS is required."). Given the mitigation

and the beneficial alterations to the project, the Corps did not act arbitrarily and

capriciously in determining that a supplemental environmental impact statement

was not required. The Corps fully complied with its NEPA requirements. As the

ESA provides that the BA requirement may be satisfied through NEPA procedures,

the Corps also fulfilled its ESA requirements.

      We also reject Sierra Club's alternate argument that the change in the road

alignment created a substantially new project requiring a new BA (or, in the

alternative, an SEIS). The new alignment did not create a new project. It altered

the existing project in such a way as to further minimize its environmental impact.

As the 1997 EAs explain, the new alignment of the road was adopted by the

partnering organizations as a means of minimizing the impact described in the

1994 EIS. A 1996 letter from FWS to the Corps supports this conclusion. In the

letter, the FWS informs the Corps that "[t]he proposed compensation plan is

consistent with the reasonable and prudent measures and terms and conditions of

[the 1993 biological] opinion." It was partly on this basis that FWS concluded that

the Corps had fulfilled its Section 7 requirements. When an agency implements a

minimizing measure, it is not automatically required to redo the entire

environmental analysis. A supplemental EIS is required only when "the post-


                                           24
[original EIS] changes in the [project] will have a 'significant' impact on the

environment that has not previously been covered by the [original] EIS." Nat'l

Wildlife Fed'n v. Marsh, 721 F.2d 767, 782 (11th Cir. 1983); 40 C.F.R. §

1502.9(c)(1). In the case of the realignment, the new route was entirely within the

study area of the 1994 EIS. Any environmental impacts from the new alignment

were covered within the 1994 EIS. Thus, the Corps was not required to undertake

a new EIS.

       Nor do we see any other changes to the Parkway project, made subsequent to

the 1994 EIS, that are "significant," such as to require an SEIS. The 1994 EIS,

which included only a conceptual mitigation plan, envisioned the set-aside of 1795

acres of specific tracts for preservation, the acquisition of 45 acres for

enhancement or restoration, and 165 acres for creation of new wetlands. The

changes made after 1994 minimize the impact of the road and focus on conserving

wetlands, rather than altering the existing landscape.17 The final plan set aside

       17
          Our prior precedent establishes that even where post-EIS changes are entirely
beneficial, if they are significant, they require an SEIS. Nat'l Wildlife Fed'n, 721 F.2d at 782-83.
Because we find that the post-EIS changes in this case are not significant, the continued wisdom
of that holding is not an issue which confronts us. However, we note that other circuits have
questioned our decision. Friends of Fiery Gizzard v. Farmers Home Admin., 61 F.3d 501, 505
n.1 (6th Cir. 1995); River Rd. Alliance, Inc. v. Corps of Eng'rs of the U.S. Army, 764 F.2d 445,
451 (7th Cir. 1985). The requirements for environmental assessments have become more
stringent in the years since the early 5th Circuit cases that govern our precedent and dictated the
holding in National Wildlife Federation. EAs are now generally considered "thorough enough to
permit a higher threshold for requiring environmental impact statements." River Rd. Alliance,
764 F.2d at 451. In addition, there has been a "growing awareness that routinely requiring such

                                                25
10,168 acres for conservation, which encompasses a larger area surrounding the

specific tracts identified in the 1994 EIS. Unlike the mitigation package in

National Wildlife Federation v. Marsh, this conservation does not create "change in

the character of the land itself." 721 F.2d at 783. By establishing conservation

easements over tracts of land specifically purchased to compensate for the wetlands

lost to the Parkway, the conservation portion of the mitigation plan does not create

any significant impact on the environment. The mitigation plan also provides for

wildlife underpasses, which is an alteration to the construction plans for the road,

and also does not create a significant impact on the surrounding environment.

       We note that considerable time and resources were saved by the partnership

process. By contributing its input and maintaining involvement throughout the

development of the Suncoast Parkway, the Corps not only developed an adequate

record of the environmental consequences, but also helped ensure that the road

would have as minimal an impact as possible. We are satisfied that the Corps

fulfilled its statutory requirements under both the ESA and NEPA.



       B. The Remaining Challenges




statements would use up resources better spent in careful study of actions likely to harm the
environment substantially." Id.

                                                26
       Sierra Club makes three additional claims which are essentially challenges to

decisions by other agencies. Sierra Club bears a difficult burden in proving the

Corps was arbitrary and capricious in relying on these decisions, which were

entirely within those agencies' areas of expertise.

       First, Sierra Club argues that the Corps was arbitrary and capricious in

relying upon the FWS "no jeopardy" finding. The basis of this argument is that the

Corps did not consider, and did not submit to FWS, the effects of the Ridge Road

extension and the Cone borrow pit on the mitigation plan for the Parkway.18

Neither FWS nor its administrative record is before this Court, so it is impossible,

and inappropriate, to speculate about what that agency did or did not consider.

Sierra Club bears a heavy burden to prove that the Corps was arbitrary and

capricious in relying upon the FWS determination of a matter firmly within that

agency's area of expertise. It is a burden they have not met.

       Second, Sierra Club challenges the adequacy of the Corps' consultation with


       18
         Sierra Club does not argue that the segmented applications constituted separate
applications, and as noted in the text the entire scope of the project was considered. Sierra Club
makes its segmentation argument primarily with respect to Ridge Road and the Cone borrow pit,
but as we note infra Sierra Club has failed to provide record support for its argument. Thus, we
need not address whether Ridge Road and the Cone borrow pit were properly segmented either
because there was no irretrievable commitment, see Friends of the Earth v. Coleman, 513 F.2d
295, 299 (9th Cir. 1975); because they were not inextricably intertwined to the Parkway project,
see Port of Astoria, Or. v. Hodel, 595 F.2d 467, 477 (9th Cir. 1979); because they each have an
independent utility, see Friends of the Earth v. Coleman, 518 F.2d 323, 328-29 (9th Cir. 1975);
or because the project was otherwise properly segmented.

                                                27
FWS concerning the Florida panther and three protected plant species, the

Brooksville bellflower, Cooley's water-willow, and Britton's beargrass. Even

though none of the surveys conducted between 1994 and 1996 found any of these

species in or near the action area, Sierra Club argues that the Corps was required to

initiate formal consultation. The basis of its argument is that FWS had in its

possession a recovery plan for the plants which concluded that a major threat to

those plants was the Suncoast Parkway. Again, neither the FWS nor its

administrative record is before this Court. It is insufficient for Sierra Club to

allege that the FWS decision to concur with the Corps' assessment was arbitrary

and capricious. Instead, Sierra Club must prove that the Corps was arbitrary and

capricious in relying upon the FWS decision. Since the surveys for the Parkway

concur with the FWS decision, the Corps had sound reasons for relying upon it.

Sierra Club has not met their burden of proof.

      Sierra Club's third argument is that the Corps acted arbitrarily and

capriciously in adopting the "action area" as it was defined by the FHWA and state

agencies in the 1994 EIS. Absent evidence to the contrary, we presume that an

agency has acted in accordance with its regulations. Nicholson v. Brown, 599 F.2d

639, 649 (5th Cir. 1979) ("Administrative action . . . comes before the courts

clothed with a presumption of regularity."). The Corps acted as a cooperating


                                          28
agency in the development of the 1994 EIS, which originally defined the action

area. In such a situation, the Corps' regulations require the district engineer to

coordinate with a lead agency to "insure that agency's resulting EIS may be

adopted by the Corps for purposes of exercising its regulatory authority." 33

C.F.R. Pt. 325, App. B § 8(c). This necessarily includes appropriately defining the

scope of the action. In addition, NEPA regulations require an agency to undertake

an independent review of a lead agency's EIS before adopting it. 40 C.F.R. §

1506.3(c). If the Corps undertook no independent consideration of the appropriate

scope of the action area, it would be in violation of both NEPA and its own

regulations. See 40 C.F.R. § 1506.3; 33 C.F.R. Pt. 325, App. B § 8(c). However,

it is apparent from the administrative record that the Corps amply fulfilled its

independent review duty. Moreover, we presume that the Corps complied with all

regulatory requirements; Sierra Club has adduced no evidence to the contrary.

Thus, Sierra Club has failed to overcome the presumption that the Corps

contributed to, and concurred with, the definition of the action area.



                                 III. CONCLUSION

      We are satisfied that the Corps took a "hard look" at the environmental

consequences of the Suncoast Parkway, and that its determinations were not


                                          29
arbitrary and capricious. The administrative record establishes that the Corps fully

complied with the related procedural requirements established by NEPA and the

ESA for major federal projects. Thus, we AFFIRM the grant of summary

judgment to the Corps and FDOT on the ESA Section 7 claims.

      AFFIRMED.




                                         30