NOT PRECEDENTIAL
UNITED STATES COURT OF APPEALS
FOR THE THIRD CIRCUIT
____________
No. 16-3990
____________
PRECISION PIPELINE, LLC,
Appellant
v.
TRICO SURVEYING AND MAPPING, INC.;
G-A-I CONSULTANTS, INC.
____________
On Appeal from the United States District Court
for the Western District of Pennsylvania
(2-13-cv-01823)
U.S. District Judge: Honorable Cathy Bissoon
____________
Submitted Pursuant to Third Circuit L.A.R. 34.1(a)
September 12, 2017
Before: VANASKIE, RENDELL and FISHER, Circuit Judges.
(Filed: October 24, 2017)
____________
OPINION*
____________
FISHER, Circuit Judge.
*
This disposition is not an opinion of the full Court and pursuant to I.O.P. 5.7
does not constitute binding precedent.
Precision Pipeline, LLC appeals the District Court’s grant of summary judgment
to Trico Surveying and Mapping, Inc. and G-A-I Consultants, Inc. We will affirm.
I.
Non-party Dominion Transmission, Inc., wanted to build a natural gas pipeline.
Dominion hired Trico to survey and map the pipeline route, and it hired G-A-I for
environmental consulting services. Dominion provided Trico’s drawings to contractors
bidding to build the pipeline. Precision was the successful bidder.
The cost of building a pipeline is affected by the number of “foreign crossings,”
that is, existing utility lines and pipelines that must be crossed along the route. The
Dominion-Trico contract required Trico to note on its drawings the locations of above-
ground foreign crossings, plus underground foreign crossings that could be identified by
an above-ground flag or marker. The Dominion-G-A-I contract required G-A-I to add
information to Trico’s drawings, but not foreign crossing information.
Knowing that the drawings did not identify all the foreign crossings, Precision said
to Dominion in the letter accompanying its bid: “We suspect there may be some quantity
of unknown pipelines to cross . . . . We propose that, should Precision be the successful
bidder, we negotiate a crossing price for unknown lines prior to the start of construction.”
However, Dominion and Precision did not do so, either before or after construction
began. Ultimately, Precision encountered 357 foreign crossings—far more than the 89
depicted on Trico’s drawings. This significantly increased Precision’s costs.
2
Precision sued Trico and G-A-I for negligent misrepresentation in preparing the
bid drawings. The District Court granted the defendants’ motions for summary judgment
and entered judgment in their favor.
II.
The District Court had diversity jurisdiction.1 We have jurisdiction over this
appeal because the order granting summary judgment was a final order.2 “We review a
district court’s grant of summary judgment de novo, applying the same standard as the
district court.”3 Viewing the facts in the light most favorable to the non-movant, we
affirm if there is no genuine issue of fact and the movant is entitled to judgment as a
matter of law.4
All parties apply Pennsylvania law, as did the District Court. We do the same.
III.
The District Court concluded that the defendants did not owe Precision a duty
under Pennsylvania law, that Precision’s suit was untimely, and that no reasonable jury
could find that Precision justifiably relied on Trico’s drawings. Precision takes issue with
each of those rulings, but we need only reach the first.
1
28 U.S.C. § 1332(a).
2
28 U.S.C. § 1291.
3
S.H. ex rel. Durrell v. Lower Merion Sch. Dist., 729 F.3d 248, 256 (3d Cir.
2013).
4
Id.; Fed. R. Civ. P. 56.
3
Precision had no contractual relationship with Trico or G-A-I. It therefore sued
them under the theory articulated in Section 552 of the Restatement (Second) of Torts,
which the Pennsylvania Supreme Court adopted in Bilt-Rite Contractors, Inc. v. The
Architectural Studio.5 There, the tort of negligent misrepresentation was extended, in a
“narrowly tailored” fashion, to “businesses which provide services and/or information
that they know will be relied upon by third parties in their business endeavors.”6 The
parties agree that Trico’s and G-A-I’s contracts with Dominion did not require
identification of underground foreign crossings. Precision argues that nevertheless, the
defendants owed Precision, as a foreseeable user of the drawings, a duty to identify 85%
of above- and below-ground foreign crossings (which Precision says is the industry
standard). The key question here, then, is whether Trico and G-A-I owed Precision a duty
to identify 85% of the foreign crossings, even though their contracts with Dominion did
not require them to do so.
The District Court analyzed the factors relevant to determining whether there is a
common law duty—including the nature of the risk, the foreseeability of the harm, and
the consequences of imposing liability—and determined that the defendants did not owe
Precision a duty under Bilt-Rite. Precision argues that by considering these factors, the
District Court erroneously supplanted Bilt-Rite’s duty analysis with its own. We disagree.
5
866 A.2d 270 (Pa. 2005).
6
Id. at 285 (“formally adopt[ing] Section 552 of the Restatement (Second) [of
Torts]”).
4
The District Court did not err when it analyzed the common law duty factors in
considering whether to extend Bilt-Rite to this situation—where the plaintiff seeks to
impose duties on the maker of the information that are different than the duties imposed
by the operative contract. Bilt-Rite itself establishes that Section 552 does not “supplant[]
the common law tort of negligent misrepresentation,” but instead “clarif[ies] the contours
of the tort as it applies to those in the business of providing information to others.”7
Indeed, Bilt-Rite examined the common law duty factors as part of its analysis supporting
the adoption of Section 552,8 and the District Court did not err by following the same
analytical path.
Nor did the District Court err in concluding there was no duty. In Bilt-Rite, the
Pennsylvania Supreme Court held that a design professional (there, an architect) may, “in
the absence of privity of contract[,] . . . be sued by a general contractor . . . for economic
loss foreseeably resulting from breach of an architect’s common law duty of due care in
the performance of his contract with the owner.”9 Thus, the design professional’s liability
to the contractor arises from the design professional’s breach of its contract with the
owner. Even Precision’s authorities support this logical limit to Bilt-Rite’s narrowly
7
Id. at 287.
8
Id.
9
Id. at 286 (quoting and adopting reasoning of Davidson & Jones, Inc. v. County
of New Hanover, 255 S.E.2d 580, 584 (N.C. App. 1979)).
5
tailored liability theory.10 Moreover, Precision cites no Pennsylvania case endorsing its
expansive view of Bilt-Rite, under which design professionals who sign a contract with a
property owner would thereby assume duties of unknown scope owed to third-party
contractors.
Precision also argues that the District Court erred in ruling that its lawsuit was
barred by the statute of limitations, and in determining that there was no factual issue
regarding justifiable reliance. We need not reach those issues. Even if Precision were
correct, affirmance would still be required, because Precision’s liability theory under Bilt-
Rite is fundamentally flawed.
IV.
For the reasons set forth above, we will affirm.
10
For example, Precision cites an illustration in the Restatement where a city hires
an engineering firm to produce reports, the reports are relied on by contractors submitting
bids, and the engineering firm is liable to the contractors because it “negligently
prepare[d] and deliver[ed] to the City an inaccurate report, containing false and
misleading information.” Restatement (Second) of Torts § 552 (1977), illus. 9.
Negligently producing inaccurate, false, and misleading reports would of course breach
the engineering firm’s contract with the city.
6